9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries
expand_lessStatus
Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll countriesmapShow on map
publicData centers in Spain
About these figures
Carbon intensity = LIFECYCLE gCO2e/kWh (Ember via Our World in Data), 2024. Renewable share = OWID/Ember; low-carbon (renewables+nuclear) and fossil shares computed from Ember 2024 TWh in OWID elec-mix-bar. Industrial price: Eurostat nrg_pc_205 2025-S2 (band ID 2-20 GWh, excl. VAT & recoverable taxes, EUR/kWh) for EU/EEA/candidates; otherwise GlobalPetrolPrices business rate (USD/kWh, 2023-2025 average) - not directly comparable. Water stress: WRI Aqueduct baseline water stress (country score/category as republished by WorldPopulationReview, WRI 2019 data; Aqueduct 4.0 file is a zip, not readable).
Data centers
102
Operators
58
Reported MW
288 MW
Pipeline MW
308 MW
Est. energy / yr
3.68 TWh
Est. CO₂ / yr
538 kt
Building area
170,952 m²
boltPower & water context
Grid carbon intensity
146.22 gCO₂e/kWh
Country 2024
Renewables in the grid
57%
Country 2024
Low-carbon share (RE + nuclear)
77%
Country 2024
Fossil share
23%
Country 2024
Industrial electricity price
0.12
Country 2025-S2 · EUR/kWh (excl. VAT & recoverable taxes; band ID 2,000-19,999 MWh)
Water stress (WRI Aqueduct)
score: 3.94 · category: High (40%-80%)
Country 2019 · WRI Aqueduct baseline water stress score 0-5
Data-center regulation
EU Energy Efficiency Directive (EU) 2023/1791 explicitly covers data centres (EU-wide DC energy-performance reporting, implemented via Delegated Regulation (EU) 2024/1364).
Country 2023
Data-center regulation
Industry self-regulation: Climate Neutral Data Centre Pact (PUE <1.3, or 1.4 warm climates, by 2030; new DCs from 2025; 75% clean energy by end-2025, 100% by 2030; WUE 0.4 L/kWh in water-stressed areas).
Country 2021
mapMap
corporate_fareLargest operators
by reported MWlocation_cityData centers by city
dnsData centers
102 · largest first| Data center | Status | Capacity | Building | PUE | Energy (est) | Networks |
|---|---|---|---|---|---|---|
| Global Switch Madrid 2 Madrid, Madrid, ES | Operational | 56 MW | — | — | 418 GWh | — |
| DATA4 Madrid-Alcobendas - MAD1 Alcobendas, Community of Madrid, ES | Operational | 50 MW | 9,184 m² | 1.43 | 188.4 GWh | 12 |
| DATA4 MAD02 Campus (San Agustín del Guadalix) San Agustín del Guadalix, ES | Operational | 50 MW | 3,941 m² | 1.43 | 188.4 GWh | — |
| Nabiax data center (Spain) ES | Operational | 35 MW | 6,626 m² | 1.61 | 148.1 GWh | — |
| TecnoAlcalá Alcalá de Henares, Madrid, ES | Operational | 35 MW | 2,177 m² | — | 130.6 GWh | 0 |
| MERLIN Edged BIL03 - Bilbao-Arasur Rivabellosa, Álava, ES | Operational | 22 MW | 9,081 m² | 1.15 | 133 GWh | 1 |
| CyrusOne Madrid 1 Alcobendas, ES | Operational | 18 MW | — | 1.46 | 138.1 GWh | 0 |
| N2 ES | Operational | 9.5 MW | 1,637 m² | 1.61 | 80.4 GWh | — |
| EdgeConneX Barcelona (EDCBCN01) Sant Boi de Llobregat, Barcelona, ES | Operational | 8 MW | — | — | 59.7 GWh | 1 |
| MareNostrum 5 (Barcelona SC) Barcelona, ES | Operational | 4 MW | — | — | 29.9 GWh | — |
| Iron Mountain Data Center - Madrid (MAD-1) San Fernando de Henares, Madrid, ES | Operational | — | 11,333 m² | 1.4 | 26.8 GWh | 1 |
| Equinix MD2 - Madrid Alcobendas, Madrid, ES | Operational | — | 11,015 m² | 1.37 | 89.1 GWh | 82 |
| Microsoft MAD01 Madrid, ES | Operational | — | 10,212 m² | 1.17 | 56.7 GWh | — |
| Equinix BA1 - Barcelona Barcelona, ES | Operational | — | 9,149 m² | 1.37 | 33.6 GWh | 74 |
| Vozelia Telecom Madrid Madrid, ES | Operational | — | 8,076 m² | — | 54.9 GWh | 0 |
| Adam - BCN Barcelona, Barcelona, ES | Operational | — | 6,476 m² | — | 44 GWh | 1 |
| Digital Realty Madrid MAD4 Madrid, ES | Operational | — | 6,258 m² | 1.38 | 139.9 GWh | 25 |
| MERLIN Edged BAR01 - Barcelona-PLZ Barcelona, Barcelona, ES | Operational | — | 6,074 m² | — | 41.3 GWh | 2 |
| Centro de Procesamiento de Datos Norte ES | Operational | — | 5,996 m² | — | 40.7 GWh | — |
| Global Switch Madrid Madrid, ES | Operational | — | 5,149 m² | — | 148.9 GWh | 19 |
| Microsoft MAD02 ES | Operational | — | 4,396 m² | 1.17 | 24.4 GWh | — |
| ODC Malaga Málaga, ES | Operational | — | 4,052 m² | — | 55 GWh | 1 |
| EXA Edge DC Barcelona Cerdanyola del Vallès, ES | Operational | — | 4,009 m² | — | 27.2 GWh | 0 |
| Magdalena Datacenter Madrid, Madrid, ES | Operational | — | 3,110 m² | — | 21.1 GWh | 0 |
| Ibercom Madrid Madrid, ES | Operational | — | 3,059 m² | — | 20.8 GWh | 3 |
| Digital Realty Madrid MAD1 Madrid, ES | Operational | — | 2,878 m² | 1.38 | 54.5 GWh | 231 |
| Andrino Telecom MAD1 Madrid, MA, ES | Operational | — | 2,878 m² | — | 9.8 GWh | 3 |
| ParcBit CPD Palma Palma, Baleares, ES | Operational | — | 2,616 m² | — | 17.8 GWh | 1 |
| CPD Gobierno de Navarra ES | Operational | — | 2,430 m² | — | 16.5 GWh | — |
| Adam - MAD Alcalá de Henares, Madrid, ES | Operational | — | 2,095 m² | — | 14.2 GWh | 4 |
| Data Center KIO Valencia ES | Operational | — | 1,998 m² | — | 40.7 GWh | — |
| Digital Realty Madrid MAD3 Madrid, ES | Operational | — | 1,972 m² | 1.38 | 57.7 GWh | 48 |
| Templus DC Madrid MAD02 Madrid, ES | Operational | — | 1,774 m² | — | 12 GWh | 8 |
| IaaS Datacenter Madrid · Madrid Madrid, Madrid, ES | Operational | — | 1,768 m² | — | 6 GWh | 20 |
| Civicos Networking - IAAS (MADRID) Madrid, Madrid, ES | Operational | — | 1,768 m² | — | 6 GWh | 0 |
| EXA Edge DC Valencia Valencia, ES | Operational | — | 1,624 m² | — | 11 GWh | 0 |
| OASIX ALICANTE AIRENETWORKS Elche, Alicante, ES | Operational | — | 1,596 m² | — | 10.8 GWh | 0 |
| Templus DC Málaga MAL01 Málaga, ES | Operational | — | 1,491 m² | — | 20.3 GWh | 12 |
| Equinix MD1 - Madrid Madrid, ES | Operational | — | 1,110 m² | 1.37 | 7.3 GWh | 14 |
| Templus DC Barcelona BCN01 L'Hospitalet de Llobregat, Barcelona, ES | Operational | — | 1,043 m² | — | 7.1 GWh | 51 |
| Plexval Datacenter Paterna, Valencia, ES | Operational | — | 992 m² | — | 6.7 GWh | 1 |
| CSUC Campus Nord Barcelona, ES | Operational | — | 979 m² | — | 26.6 GWh | 9 |
| Espacio Rack · Pozuelo de Alarcón Pozuelo de Alarcón, Madrid, ES | Operational | — | 962 m² | — | 3.3 GWh | 0 |
| Pozuelo de Alarcon Pozuelo de Alarcón, Madrid, ES | Operational | — | 962 m² | — | 3.3 GWh | 0 |
| KIO Murcia 1 (MUR1) Murcia, España, ES | Operational | — | 924 m² | — | 18.8 GWh | 2 |
| EXA Edge DC Basauri Basauri, ES | Operational | — | 894 m² | — | 6.1 GWh | 0 |
| Acens Technologies · Alcobendas Alcobendas, Madrid, ES | Operational | — | 846 m² | — | 5.7 GWh | 1 |
| nLighten Madrid MAD1 Madrid, ES | Operational | — | 834 m² | — | 5.7 GWh | 12 |
| Espanix Datacenter · Madrid Madrid, Madrid, ES | Operational | — | 805 m² | — | 5.5 GWh | 43 |
| Templus DC Valencia VAL01 Paterna, Valencia, ES | Operational | — | 768 m² | — | 15.6 GWh | 4 |
| Centro de Procesamiento de Datos del Gobierno de Cantabria Santander, ES | Operational | — | 530 m² | — | 3.6 GWh | — |
| Templus DC Madrid MAD03 Madrid, ES | Operational | — | 439 m² | — | 3 GWh | 8 |
| IslaLink FSL Valencia, Valencia, ES | Operational | — | 400 m² | — | 2.7 GWh | 3 |
| NIXVAL Datacenter · Paterna Paterna, ES | Operational | — | 218 m² | — | 1.5 GWh | 33 |
| CPD Titan · Murcia Murcia, Murcia, ES | Operational | — | 167 m² | — | 1.1 GWh | 8 |
| inforland.com ES | Operational | — | 95 m² | — | 1.9 GWh | — |
| Cantabria Datacenter Madrid, Madrid, ES | Operational | — | 86 m² | — | 584 MWh | 0 |
| IPCore Datacenter Madrid Madrid, ES | Operational | — | — | — | 6.3 GWh | 17 |
| Cogent Madrid Madrid, Madrid, ES | Operational | — | — | — | 18.1 GWh | 11 |
| Sevilla Datacenter · Seville Seville, ES | Operational | — | — | — | 6.3 GWh | 9 |
| Templus DC Sevilla SEV01 Seville, ES | Operational | — | — | — | 15.7 GWh | 8 |
| Telxius Derio DC Derio, Bizkaia, ES | Operational | — | — | — | 10.5 GWh | 7 |
| SYS4NET DATACENTER · Alcantarilla Alcantarilla, Murcia, ES | Operational | — | — | — | 6.3 GWh | 6 |
| Adam - PTV Cerdanyola del Vallès, Barcelona, ES | Operational | — | — | — | 10.5 GWh | 6 |
| Equinix MD6 Madrid, ES | Operational | — | — | 1.37 | 36.8 GWh | 5 |
| Templus DC Barcelona BCN02 Barcelona, ES | Operational | — | — | — | 15.7 GWh | 4 |
| Civicos Networking DCLAGUNA San Cristóbal de La Laguna, Santa Cruz de Tenerife, ES | Operational | — | — | — | 6.3 GWh | 2 |
| Ibercom San Sebastian San Sebastián, Gipuzkoa, ES | Operational | — | — | — | 6.3 GWh | 2 |
| CONSORCIO DE TELECOMUNICACIONES AVANZADA S.A. · Alcantarilla Alcantarilla, Murcia, ES | Operational | — | — | — | 6.3 GWh | 2 |
| NTT Madrid 1 Data Center (MAD1) Las Rozas de Madrid, Madrid, ES | Operational | — | — | 1.35 | 99.3 GWh | 2 |
| iDataGreen Barcelona, ES | Operational | — | — | — | — | 1 |
| Television Torrevieja CPD (TVT-CPD) Torrevieja, AL, ES | Operational | — | — | — | 6.3 GWh | 1 |
| Civicos Networking DCARRECIFE Arrecife, Lanzarote, ES | Operational | — | — | — | 6.3 GWh | 1 |
| MERLIN Edged MAD01 - Madrid-Getafe Getafe, Madrid, ES | Operational | — | — | — | 6.3 GWh | 1 |
| Amune Networks CPD ! San Javier, MU, ES | Operational | — | — | — | 6.3 GWh | 0 |
| TEDRA LE01 León, ES | Operational | — | — | — | 6.3 GWh | 0 |
| IUKANET Datacenter · Alfafar Alfafar, Valencia, ES | Operational | — | — | — | 6.3 GWh | 0 |
| IXPlay Neutral Acces Point Benahavis, Malaga, ES | Operational | — | — | — | 6.3 GWh | 0 |
| Equinix BA2 - Barcelona Barcelona, Barcelona, ES | Operational | — | — | 1.37 | 36.8 GWh | 0 |
| AWS Europe (Spain) Zaragoza, ES | Operational | — | — | 1.14 | — | — |
| Amazon Data Services Spain S.L.U. ES | Operational | — | — | 1.14 | 209.7 GWh | — |
| Amazon Web Services ES | Operational | — | — | 1.14 | — | — |
| CPD Titan Datacenter ES | Operational | — | — | — | 10.5 GWh | — |
| Centre de Processament de Dades IBM ES | Operational | — | — | — | 24.3 GWh | — |
| Cloud Center Andalucía ES | Operational | — | — | — | 10.5 GWh | — |
| DATA4 - MAD2-DC01 ES | Operational | — | — | 1.43 | 188.4 GWh | — |
| Google Cloud europe-southwest1 Madrid, ES | Operational | — | — | 1.09 | — | — |
| Mozoilo AJVP Galdakao, ES | Operational | — | — | — | 6.3 GWh | — |
| NTT ES | Operational | — | — | 1.35 | 99.3 GWh | — |
| The Weaver ES | Operational | — | — | — | 10.5 GWh | — |
| Data center · Spain ES | Operational | — | — | — | 10.5 GWh | — |
| Data center · Spain ES | Operational | — | — | — | 10.5 GWh | — |
| Data center · Spain ES | Operational | — | — | — | 10.5 GWh | — |
| Data center · Spain ES | Operational | — | — | — | 10.5 GWh | — |
| centro de datos trasbase Negratín ES | Operational | — | — | — | 10.5 GWh | — |
| Digital Realty BCN1 (Av. del Maresme 43, Badalona) Badalona, Catalonia, ES | Operational | — | — | 1.38 | — | — |
| Digital Realty MAD2 (Calle Albasanz 73) Madrid, ES | Operational | — | — | 1.38 | — | — |
| Equinix MD3x - Madrid (xScale) Madrid, ES | Operational | — | — | 1.37 | — | — |
| Equinix MD5 - Madrid Madrid, ES | Operational | — | — | 1.37 | — | — |
| Meta Talavera de la Reina Data Center Talavera de la Reina, ES | Planned / permitted | — | — | 1.08 | — | — |
| Oracle Cloud Madrid (eu-madrid-1) Madrid, ES | Operational | — | — | — | — | — |
| QTS Calatorao Calatorao, ES | Planned / permitted | — | — | — | — | — |
Global Switch · Madrid, Spain
Data4 · Alcobendas, Spain
Data4 · San Agustín del Guadalix, Spain
Nabiax · Spain
TecnoAlcalá
35 MW
Telefonica de España · Alcalá de Henares, Spain
MERLIN Edged · Rivabellosa, Spain
CyrusOne Madrid 1
18 MW
CyrusOne · Alcobendas, Spain
N2
9.5 MW
Nabiax · Spain
EdgeConneX · Sant Boi de Llobregat, Spain
EuroHPC JU / FZJ · Barcelona, Spain
Iron Mountain Data Centers · San Fernando de Henares, Spain
Equinix MD2 - Madrid
≈ 12 MW
Equinix · Alcobendas, Spain
Microsoft MAD01
≈ 9.3 MW
Microsoft · Madrid, Spain
Equinix BA1 - Barcelona
≈ 4.7 MW
Equinix · Barcelona, Spain
Vozelia Telecom Madrid
≈ 7.3 MW
Vozelia Telecom SL · Madrid, Spain
Adam - BCN
≈ 5.9 MW
ADAM · Barcelona, Spain
Digital Realty Madrid MAD4
≈ 19 MW
Digital Realty · Madrid, Spain
MERLIN Edged · Barcelona, Spain
Banco Santander · Spain
Global Switch Madrid
≈ 20 MW
Global Switch · Madrid, Spain
Microsoft MAD02
≈ 4 MW
Microsoft · Spain
ODC Malaga
≈ 7.4 MW
Olivenet Data Centers Spain S.L. · Málaga, Spain
EXA Edge DC Barcelona
≈ 3.6 MW
EXA Infrastructure · Cerdanyola del Vallès, Spain
Magdalena Datacenter
≈ 2.8 MW
Asociación ESpanix · Madrid, Spain
Ibercom Madrid
≈ 2.8 MW
Ibercom · Madrid, Spain
Digital Realty Madrid MAD1
≈ 7.5 MW
Digital Realty · Madrid, Spain
Andrino Telecom MAD1
≈ 1.3 MW
Andrino Telecom · Madrid, Spain
ParcBit CPD Palma
≈ 2.4 MW
Soluciones Corporativas IP (SCIP) · Palma, Spain
CPD Gobierno de Navarra
≈ 2.2 MW
Nasertic · Spain
Adam - MAD
≈ 1.9 MW
ADAM · Alcalá de Henares, Spain
Data Center KIO Valencia
≈ 5.5 MW
KIO · Spain
Digital Realty · Madrid, Spain
Templus DC Madrid MAD02
≈ 1.6 MW
TEMPLUS DATACENTERS · Madrid, Spain
IaaS Datacenter Madrid · Madrid
≈ 0.8 MW
IaaS Datacenter Madrid · Madrid, Spain
Civicos Networking, S.L.U. · Madrid, Spain
EXA Edge DC Valencia
≈ 1.5 MW
EXA Infrastructure · Valencia, Spain
OASIX ALICANTE AIRENETWORKS
≈ 1.4 MW
Aire Networks del Mediterraneo S.L.U. · Elche, Spain
Templus DC Málaga MAL01
≈ 2.7 MW
TEMPLUS DATACENTERS · Málaga, Spain
Equinix MD1 - Madrid
≈ 1 MW
Equinix · Madrid, Spain
Templus DC Barcelona BCN01
≈ 0.9 MW
TEMPLUS DATACENTERS · L'Hospitalet de Llobregat, Spain
Plexval Datacenter
≈ 0.9 MW
Axarnet Comunicaciones S.L. · Paterna, Spain
CSUC Campus Nord
≈ 3.6 MW
CSUC · Barcelona, Spain
Espacio Rack · Pozuelo de Alarcón, Spain
Pozuelo de Alarcon
≈ 0.4 MW
Cloud Builders SA · Pozuelo de Alarcón, Spain
KIO Murcia 1 (MUR1)
≈ 2.5 MW
KIO · Murcia, Spain
EXA Edge DC Basauri
≈ 0.8 MW
EXA Infrastructure · Basauri, Spain
Acens Technologies · Alcobendas
≈ 0.8 MW
Acens Technologies · Alcobendas, Spain
nLighten Madrid MAD1
≈ 0.8 MW
nLighten · Madrid, Spain
Espanix Datacenter · Madrid
≈ 0.7 MW
Asociación ESpanix · Madrid, Spain
Templus DC Valencia VAL01
≈ 2.1 MW
TEMPLUS DATACENTERS · Paterna, Spain
Gobienro de Cantabria · Santander, Spain
Templus DC Madrid MAD03
≈ 0.4 MW
TEMPLUS DATACENTERS · Madrid, Spain
IslaLink FSL
≈ 0.4 MW
BalaLink S.A.U · Valencia, Spain
NIXVAL Datacenter · Paterna
≈ 0.2 MW
NIXVAL (Falbox, S.L.) · Paterna, Spain
CPD Titan · Murcia
≈ 0.1 MW
CPD Titan · Murcia, Spain
inforland.com
≈ 0.3 MW
inforland.com · Spain
Cantabria Datacenter
≈ 0.1 MW
Asociación ESpanix · Madrid, Spain
IPCore Datacenter SL · Madrid, Spain
Cogent Communications · Madrid, Spain
Sevilla Datacenter · Seville, Spain