9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries
expand_lessStatus
Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll countriesmapShow on map
publicData centers in United Kingdom
About these figures
Carbon intensity = LIFECYCLE gCO2e/kWh (Ember via Our World in Data), 2024. Renewable share = OWID/Ember; low-carbon (renewables+nuclear) and fossil shares computed from Ember 2024 TWh in OWID elec-mix-bar. Industrial price: Eurostat nrg_pc_205 2025-S2 (band ID 2-20 GWh, excl. VAT & recoverable taxes, EUR/kWh) for EU/EEA/candidates; otherwise GlobalPetrolPrices business rate (USD/kWh, 2023-2025 average) - not directly comparable. Water stress: WRI Aqueduct baseline water stress (country score/category as republished by WorldPopulationReview, WRI 2019 data; Aqueduct 4.0 file is a zip, not readable). Price: GlobalPetrolPrices business average (0.442 USD/kWh) likely reflects small/medium business tariffs; UK not in Eurostat.
Data centers
395
Operators
168
Reported MW
816 MW
Pipeline MW
438 MW
Est. energy / yr
15.15 TWh
Est. CO₂ / yr
3.28 Mt
Building area
1.16 km²
boltPower & water context
Grid carbon intensity
216.5 gCO₂e/kWh
Country 2024
Renewables in the grid
51%
Country 2024
Low-carbon share (RE + nuclear)
65%
Country 2024
Fossil share
35%
Country 2024
Industrial electricity price
0.44
Country 2023-2025 avg · USD/kWh (business rate, 2023-2025 average)
Water stress (WRI Aqueduct)
score: 1.3 · category: Low-Medium (10%-20%)
Country 2019 · WRI Aqueduct baseline water stress score 0-5
Data-center regulation
No national DC statute verified; grid-capacity constraint in West London (GLA warned housing could be blocked until 2035 because DCs took capacity).
Country 2022
mapMap
location_cityMetro facts — moratoria, grid limits, heat reuse
location_onLondon
grid constraint
West London grid capacity exhausted by data centres: Greater London Authority warned new housing in West London could be blocked until 2035.
Country 2022
grid constraint
Colt 50MW Hayes campus: insufficient local capacity; Colt funds substation reinforcement taking ~4 years.
Country 2022
location_onHounslow
grid constraint
Part of West London area where GLA warned DC load had used up grid capacity (housing connections at risk until 2035).
Country 2022
corporate_fareLargest operators
by reported MWlocation_cityData centers by city
dnsData centers
395 · largest first| Data center | Status | Capacity | Building | PUE | Energy (est) | Networks |
|---|---|---|---|---|---|---|
| Vantage Data Centers - CWL13 Newport, GB | Operational | 148 MW | 21,783 m² | — | 1.1 TWh | — |
| CyrusOne London LON6 (Iver Heath) Iver Heath, GB | Under construction | 108 MW | — | 1.46 | — | — |
| Global Switch London East London, GB | Operational | 87 MW | 6,235 m² | 1.2 | 582.7 GWh | 31 |
| Global Switch London South London, GB | Operational | 70 MW | — | — | 522.4 GWh | — |
| Vantage Data Centers LHR1 London, GB | Operational | 55 MW | 4,435 m² | — | 410.5 GWh | — |
| Colt London 7 (Hayes Digital Park) Hayes, GB | Planned / permitted | 48 MW | — | — | — | — |
| Global Technical Realty London GB One GB | Operational | 40 MW | 9,514 m² | 1.25 | 78 GWh | — |
| Ark Data Centres - Longcross Park Chertsey, GB | Operational | 36 MW | 7,165 m² | — | 242.9 GWh | — |
| Colt London North Data Centre Welwyn Garden City, GB | Operational | 35 MW | 18,117 m² | 1.15 | 211.6 GWh | 7 |
| Kao Data KLON-01 Harlow, Essex, GB | Operational | 35 MW | 4,101 m² | 1.2 | 219.5 GWh | 2 |
| NTT London 1 Data Center (LON1) Dagenham, GB | Operational | 32 MW | 13,457 m² | 1.2 | 201.8 GWh | — |
| Colt London 5 (Hayes Digital Park) Hayes, GB | Under construction | 32 MW | — | — | — | — |
| Colt London 4 (Hayes) Hayes, GB | Under construction | 31 MW | 4,962 m² | — | — | — |
| Equinix LD9 - London, Powergate London, GB | Operational | 29 MW | 12,096 m² | 1.35 | 205.8 GWh | 33 |
| Colt London 6 (Hayes Digital Park) Hayes, GB | Planned / permitted | 27 MW | — | — | — | — |
| VIRTUS LONDON4 (Slough) Slough, England, GB | Operational | 27 MW | 13,982 m² | — | 198.5 GWh | 6 |
| Equinix LD5 - London, Slough Slough, GB | Operational | 25 MW | 14,386 m² | 1.37 | 180 GWh | 166 |
| VIRTUS LONDON5 (Stockley Park) Hayes, GB | Operational | 24 MW | 6,600 m² | — | 179.1 GWh | 1 |
| Colt London 8 (Hayes Digital Park) Hayes, GB | Planned / permitted | 23 MW | — | — | — | — |
| Imperium 315 Basildon, GB | Operational | 21 MW | 29,434 m² | — | 156.7 GWh | — |
| NTT Hemel Hempstead 3 Data Center (HH3) Hemel Hempstead, GB | Operational | 20 MW | 14,298 m² | 1.35 | 141.9 GWh | 1 |
| nLighten Swindon BRS2 Swindon, GB | Operational | 19 MW | 8,358 m² | 1.29 | 23.7 GWh | 2 |
| CyrusOne London 4 Slough, England, GB | Operational | 18 MW | 11,597 m² | 1.46 | 138.1 GWh | 0 |
| Global Switch London North London, GB | Operational | 18 MW | 7,507 m² | — | 153 GWh | 32 |
| CyrusOne London 5 Slough, England, GB | Operational | 18 MW | 6,904 m² | 1.46 | 138.1 GWh | 0 |
| Kao Data KLON-06 Slough, GB | Operational | 16 MW | 16,489 m² | 1.25 | 105.1 GWh | — |
| VIRTUS LONDON6 (Stockley Park) Hayes, GB | Operational | 16 MW | 7,431 m² | — | 119.4 GWh | — |
| Gravity Edge LDN1 Camberley, GB | Operational | 15 MW | 13,567 m² | 1.2 | 94.6 GWh | — |
| China Mobile International - London DC Slough, England, GB | Operational | 15 MW | 4,954 m² | — | 112 GWh | 3 |
| CyrusOne London 2 West Drayton, GB | Operational | 14 MW | 8,625 m² | 1.46 | 107.4 GWh | 2 |
| VIRTUS LONDON2 (Hayes) Hayes, GB | Operational | 12 MW | 6,167 m² | 1.2 | 77.6 GWh | 6 |
| NTT Hemel Hempstead 4 Data Center (HH4) Hemel Hempstead, Hertfordshire, GB | Operational | 12 MW | 13,909 m² | 1.35 | 85.1 GWh | 0 |
| nLighten Bristol BRS1 Bristol, Bristol, GB | Operational | 11 MW | 4,531 m² | 1.29 | 30.6 GWh | 2 |
| nLighten Nottingham EMA1 Nottingham, Nottinghamshire, GB | Operational | 9.6 MW | 4,591 m² | 1.29 | 131.1 GWh | 2 |
| Colt London West (Park Royal) London, GB | Operational | 9.4 MW | 2,387 m² | — | 70.2 GWh | 6 |
| CyrusOne London 3 Slough, England, GB | Operational | 9 MW | 4,636 m² | 1.46 | 69.1 GWh | 1 |
| CyrusOne London 1 Slough, GB | Operational | 9 MW | — | 1.46 | 69.1 GWh | 1 |
| VIRTUS LONDON3 (Slough) Slough, GB | Operational | 7.2 MW | 2,468 m² | — | 53.7 GWh | 0 |
| Virtus London 10 Slough, GB | Operational | 6.6 MW | 3,121 m² | — | 49.3 GWh | — |
| CSquare London LHR3 GB | Operational | 6 MW | 8,468 m² | — | 44.8 GWh | — |
| nLighten Chester Chester, GB | Operational | 6 MW | 4,944 m² | 1.29 | 30.6 GWh | — |
| nLighten Milton Keynes LTN1 Milton Keynes, Buckinghamshire, GB | Operational | 6 MW | 4,356 m² | 1.29 | 7.5 GWh | 4 |
| NTT Hemel Hempstead 2 Data Center (HH2) Hemel Hempstead, GB | Operational | 5.8 MW | 6,672 m² | 1.35 | 41.2 GWh | 2 |
| nLighten Leeds LBA1 Normanton, West Yorkshire, GB | Operational | 3.6 MW | 2,933 m² | 1.29 | 9.7 GWh | 2 |
| NTT Slough 2 Data Center (SL2) Slough, GB | Operational | 1.8 MW | 3,063 m² | 1.35 | 12.8 GWh | 1 |
| Google Datacentre Waltham Cross GB | Operational | — | 30,579 m² | 1.09 | 159.4 GWh | — |
| DXC Wynyard Data Center GB | Operational | — | 28,117 m² | 1.16 | 156 GWh | — |
| Morgan Stanley Data Centre · Hounslow Hounslow, GB | Operational | — | 27,588 m² | — | 187.4 GWh | — |
| Digital Realty London LGW14 Woking, Surrey, GB | Operational | — | 18,693 m² | 1.38 | 297.8 GWh | 11 |
| ARO DC2 Kilby House (AIMES) Liverpool, GB | Operational | — | 16,510 m² | — | 112.1 GWh | 3 |
| Iron Mountain Data Center - London (LON-1) Slough, GB | Operational | — | 14,703 m² | — | 115.5 GWh | 7 |
| Lincoln Rackhouse London Camberley, England, GB | Operational | — | 13,567 m² | — | 30.7 GWh | 0 |
| Bank Of America data center (United Kingdom) GB | Operational | — | 13,567 m² | — | 30.7 GWh | — |
| Equinix LD10 - London, Slough Slough, Berkshire, GB | Operational | — | 12,656 m² | 1.37 | 74.6 GWh | 21 |
| Lloyds Banking Group data center (United Kingdom) GB | Operational | — | 12,507 m² | — | 84.9 GWh | — |
| RBS Melville Gate Data Centre GB | Operational | — | 12,243 m² | — | 83.2 GWh | — |
| Hertfordshire Data Centre Welwyn Garden City, GB | Under construction | — | 11,835 m² | — | — | — |
| RBS Data Centre GB | Operational | — | 11,737 m² | — | 79.7 GWh | — |
| Digital Realty LGW16 Crawley, GB | Operational | — | 11,649 m² | 1.38 | 80.1 GWh | 0 |
| Pure DC London Brent Cross GB | Operational | — | 11,545 m² | 1.29 | 71.2 GWh | — |
| Aptum Portsmouth Havant, GB | Operational | — | 10,891 m² | — | 74 GWh | 1 |
| Yondr data center (United Kingdom) GB | Operational | — | 10,752 m² | — | 73 GWh | — |
| The Chess Building Watford, GB | Operational | — | 10,741 m² | — | 73 GWh | — |
| Stellanor London West Hounslow, GB | Operational | — | 10,608 m² | — | 199.2 GWh | — |
| Goldman Sachs data center (East Grinstead) East Grinstead, GB | Operational | — | 10,587 m² | — | 71.9 GWh | — |
| Bolton Customer Hosting Centre Bolton, Greater Manchester, GB | Operational | — | 9,191 m² | — | 62.4 GWh | 1 |
| Virtus London 14 GB | Operational | — | 8,932 m² | — | 138.6 GWh | — |
| AWS Bracknell Data Centre GB | Operational | — | 8,737 m² | 1.14 | 110.9 GWh | — |
| AWS Swindon Data Centre Swindon, GB | Operational | — | 8,681 m² | 1.14 | 46.1 GWh | — |
| Navisite Redhill UK Redhill, Surrey, GB | Operational | — | 8,674 m² | — | 58.9 GWh | 0 |
| AWS Didcot Data Centre GB | Operational | — | 8,602 m² | 1.14 | 46.1 GWh | — |
| Ark Data Centres - Cody Park - A9, A101, A102, A103, A104, A105 Farnborough, Hampshire, GB | Operational | — | 8,582 m² | — | 58.3 GWh | 5 |
| Iron Mountain LON-2 Slough, GB | Operational | — | 8,269 m² | — | 56.2 GWh | — |
| HSBC Data Centre GB | Operational | — | 7,683 m² | — | 52.2 GWh | — |
| Kao Data KLON-05 GB | Operational | — | 7,377 m² | 1.25 | 44.1 GWh | — |
| Equinix LD4 - London, Slough Slough, GB | Operational | — | 7,371 m² | 1.37 | 48.3 GWh | 79 |
| Ark Data Centres Meridian Park London, GB | Operational | — | 7,369 m² | — | 50 GWh | — |
| UBS Data Centre · Hayes Hayes, GB | Operational | — | 7,070 m² | — | 48 GWh | — |
| Nationwide Swindon Technology Centre Swindon, GB | Operational | — | 6,666 m² | — | 45.3 GWh | — |
| British Telecom Computer Centre GB | Operational | — | 6,583 m² | — | 44.7 GWh | — |
| Digital Realty LHR13 Chessington, GB | Operational | — | 6,542 m² | 1.38 | 80.9 GWh | 8 |
| Croydon Croydon, Sutton, GB | Operational | — | 6,530 m² | — | 44.4 GWh | 0 |
| Ark Data Centres - Spring Park - SQ17, P1, P2, P3, P4, P5 Corsham, Wiltshire, GB | Operational | — | 6,415 m² | — | 47.5 GWh | 7 |
| EXA Datacenter London (GS2 London East) London, Middlesex, GB | Operational | — | 6,235 m² | — | 18.5 GWh | 1 |
| Starwood House GB | Operational | — | 6,086 m² | — | 41.3 GWh | — |
| Equinix LD6 - London, Slough Slough, GB | Operational | — | 6,081 m² | 1.37 | 191 GWh | 75 |
| Verizon UK5 London, GB | Operational | — | 6,067 m² | — | 41.2 GWh | — |
| Asanti - Farnborough Farnborough, GB | Operational | — | 5,994 m² | — | 40.7 GWh | — |
| Digital Realty London LHR26 Slough, GB | Operational | — | 5,893 m² | 1.38 | 60.4 GWh | 0 |
| Digital Space - Telford (TEL) Telford, Shropshire, GB | Operational | — | 5,587 m² | — | 37.9 GWh | 1 |
| Virgin Media O2 Slough GB | Operational | — | 5,587 m² | — | 37.9 GWh | — |
| Vinters Connect Maidstone, Kent, GB | Operational | — | 5,575 m² | — | 18.9 GWh | 38 |
| Custodian CDC Maidstone 1 Maidstone, GB | Operational | — | 5,575 m² | — | 18.9 GWh | 10 |
| Digital Realty London LHR27 Slough, GB | Operational | — | 5,555 m² | 1.38 | 52.1 GWh | 0 |
| Pulsant Edinburgh SC-1 (South Gyle) Edinburgh, GB | Operational | — | 5,467 m² | 1.56 | 47.6 GWh | 37 |
| Keppel Data Centres (Vodafone) - London Bracknell, England, GB | Operational | — | 5,391 m² | — | 59.9 GWh | — |
| Redcentric Harrogate Data Centre Harrogate, North Yorkshire, GB | Operational | — | 5,390 m² | — | 36.6 GWh | 0 |
| Datum · Farnborough Farnborough, GB | Operational | — | 5,380 m² | 1.25 | 32.2 GWh | 11 |
| DataVita DV1 Lanarkshire Glasgow, North Lanarkshire, GB | Operational | — | 5,318 m² | — | 36.1 GWh | 7 |
| BA Boadicea House Data Centre GB | Operational | — | 5,304 m² | — | 36 GWh | — |
| IBM Horsham GB | Operational | — | 5,263 m² | — | 35.7 GWh | — |
| Pulsant Birmingham WM-1 Birmingham, GB | Operational | — | 5,116 m² | 1.56 | 42 GWh | 1 |
| Santander data center (United Kingdom) GB | Operational | — | 4,948 m² | — | 33.6 GWh | — |
| Entanet Telford DC3 Telford, Shropshire, SH, GB | Operational | — | 4,661 m² | — | 31.7 GWh | 0 |
| Neos Networks Hampshire Hampshire, GB | Operational | — | 4,516 m² | — | 10.2 GWh | 3 |
| Pulsant Fareham SE-5 Fareham, Hampshire, GB | Operational | — | 4,516 m² | 1.56 | 11.2 GWh | 3 |
| SCC GB | Operational | — | 4,516 m² | — | 10.2 GWh | — |
| Serverfarm LON1 London Feltham, GB | Operational | — | 4,475 m² | — | 30.4 GWh | 1 |
| Level(3) London (Goswell Road) London, GB | Operational | — | 4,316 m² | — | 201.4 GWh | 32 |
| Stellanor London North London, GB | Operational | — | 4,316 m² | — | 14.7 GWh | — |
| Rackspace London Slough (LON3) Slough, GB | Operational | — | 4,314 m² | — | 29.3 GWh | 1 |
| IONOS data center (United Kingdom) GB | Operational | — | 4,052 m² | — | 27.5 GWh | — |
| Microsoft Newport data centre Newport, GB | Operational | — | 3,969 m² | 1.17 | 22 GWh | — |
| Getronics, The Babbage Centre Runcorn, GB | Operational | — | 3,934 m² | — | 26.7 GWh | 1 |
| CapitaLand Ascendas REIT data center (High Wycombe) High Wycombe, GB | Operational | — | 3,779 m² | — | 25.7 GWh | — |
| TATA Communications Stratford London, GB | Operational | — | 3,620 m² | — | 98.3 GWh | 2 |
| Digital Realty London LHR18 London, GB | Operational | — | 3,540 m² | 1.38 | 23.1 GWh | 8 |
| Thales · Doncaster Doncaster, GB | Operational | — | 3,536 m² | — | 48 GWh | — |
| Asanti Manchester Manchester, GB | Operational | — | 3,461 m² | — | 23.5 GWh | — |
| Telehouse London Docklands South London, GB | Operational | — | 3,384 m² | — | 94.6 GWh | 39 |
| Templus DC Leeds LEE01 Leeds, Yorkshire, GB | Operational | — | 3,380 m² | — | 23 GWh | 2 |
| Digital Realty London LHR17 West Drayton, Middlesex, GB | Operational | — | 3,371 m² | 1.38 | 26.4 GWh | 15 |
| Pulsant Croydon LN-1 Croydon, GB | Operational | — | 3,341 m² | 1.56 | 22.2 GWh | 4 |
| London Hosting Centre London, GB | Operational | — | 3,340 m² | — | 6.3 GWh | 30 |
| QiComm Tutis Point London, GB | Operational | — | 3,340 m² | — | 11.3 GWh | 15 |
| Telehouse London Docklands West London, GB | Operational | — | 3,249 m² | — | 82.5 GWh | 195 |
| Telehouse London Docklands North London, GB | Operational | — | 3,244 m² | — | 22 GWh | 495 |
| CXD Infrastructure Solutions Maidstone, GB | Operational | — | 3,149 m² | — | 21.4 GWh | — |
| Rackspace London 8 Hayes, GB | Operational | — | 3,075 m² | — | 20.9 GWh | — |
| Verizon UK4 GB | Operational | — | 3,028 m² | — | 20.6 GWh | — |
| Vision247 - Chiswick Datacenter London, GB | Operational | — | 2,928 m² | — | 79.5 GWh | 0 |
| Equinix LD3 - London, Park Royal London, GB | Operational | — | 2,684 m² | 1.37 | 43 GWh | 16 |
| VeloxServ DC1 - Wolverhampton Wolverhampton, West Midlands, GB | Operational | — | 2,620 m² | — | 8.9 GWh | 7 |
| HA Hosting DC3 Wolverhampton, GB | Operational | — | 2,620 m² | — | 8.9 GWh | 1 |
| DataVita DV2 Glasgow Glasgow, GB | Operational | — | 2,610 m² | — | 17.7 GWh | 1 |
| Redcentric Elland Data Centre Elland, West Yorkshire, GB | Operational | — | 2,606 m² | — | 35.4 GWh | 0 |
| Pulsant Reading SE-3 (South) Reading, Berkshire, GB | Operational | — | 2,539 m² | 1.56 | 25.8 GWh | 13 |
| The UK Grid Network LTD (Greenheys DC) Manchester, GB | Operational | — | 2,496 m² | — | 17 GWh | 1 |
| Digital Realty London LON1 London, GB | Operational | — | 2,474 m² | 1.38 | 62 GWh | 117 |
| CentriLogic Arlington (ARL) Bracknell, Berkshire, GB | Operational | — | 2,459 m² | — | 16.7 GWh | 1 |
| Pulsant Edinburgh SC-2 (Medway) Edinburgh, GB | Operational | — | 2,441 m² | 1.56 | 26.3 GWh | 1 |
| Custodian CDC Dartford DA2 Dartford, Kent, GB | Operational | — | 2,429 m² | — | 16.5 GWh | 1 |
| Sky Chilworth GB | Operational | — | 2,423 m² | — | 16.5 GWh | — |
| Lumen GB | Operational | — | 2,416 m² | — | 16.4 GWh | — |
| Equinix MA3 - Manchester, Joule House Manchester, GB | Operational | — | 2,379 m² | 1.37 | 42.4 GWh | 52 |
| Astrohouse GB | Operational | — | 2,357 m² | — | 16 GWh | — |
| Asanti - Reading Reading, GB | Operational | — | 2,320 m² | — | 15.8 GWh | — |
| Brightsolid · Aberdeen Aberdeen, GB | Operational | — | 2,310 m² | — | 15.7 GWh | — |
| DataBank London (LHR1) Feltham, GB | Operational | — | 2,305 m² | — | 39.6 GWh | 1 |
| Verizon Warrington Warrington, GB | Operational | — | 2,214 m² | — | 15 GWh | — |
| Pulsant Milton Keynes SE-1 Milton Keynes, GB | Operational | — | 2,203 m² | 1.56 | 20.2 GWh | 9 |
| ServerHouse P1 Fareham, GB | Operational | — | 2,202 m² | — | 15 GWh | 2 |
| SloughIX Slough, GB | Operational | — | 2,142 m² | — | 7.3 GWh | 1 |
| Elasticity Slough Slough, GB | Operational | — | 2,142 m² | — | 7.3 GWh | — |
| aql DC5 Leeds, GB | Operational | — | 2,095 m² | — | 14.2 GWh | 7 |
| Equinix LD8 - London, Docklands London, GB | Operational | — | 2,086 m² | 1.37 | 13.7 GWh | 313 |
| Kent Science Park Kent, GB | Operational | — | 2,082 m² | — | 14.1 GWh | 2 |
| IP House Data Centre · London London, London, GB | Operational | — | 2,058 m² | — | 14 GWh | 18 |
| Internet For Business Limited · Aberdeen Aberdeen, Aberdeenshire, GB | Operational | — | 2,012 m² | — | 13.7 GWh | 0 |
| iomart DC5 Maidenhead Maidenhead, GB | Operational | — | 2,008 m² | — | 13.6 GWh | 7 |
| ChunkyChips Data Centre · Basildon Basildon, Essex, GB | Operational | — | 1,998 m² | — | 13.6 GWh | 1 |
| Equinix MA4 - Manchester, Synergy House Manchester, GB | Operational | — | 1,989 m² | 1.37 | 19.1 GWh | 33 |
| OVHcloud data center (United Kingdom) GB | Operational | — | 1,984 m² | — | 13.5 GWh | — |
| Equinix MA1 - Manchester, Williams/Kilburn Manchester, GB | Operational | — | 1,864 m² | 1.37 | 26.6 GWh | 110 |
| Reynolds House, Manchester Manchester, Manchester, GB | Operational | — | 1,795 m² | — | 12.2 GWh | 41 |
| Exascale - Wolverhampton (WLV0) Wolverhampton, West Midlands, GB | Operational | — | 1,792 m² | — | 12.2 GWh | 4 |
| Redhill Datacenter Redhill, Surrey, GB | Operational | — | 1,791 m² | — | 12.2 GWh | 4 |
| ServerHouse F2 Fareham, Hampshire, GB | Operational | — | 1,776 m² | — | 12.1 GWh | 2 |
| Venture West GB | Operational | — | 1,745 m² | — | 11.9 GWh | — |
| LDeX1 London, GB | Operational | — | 1,740 m² | — | 11.8 GWh | 15 |
| CGI Datacenter GB | Operational | — | 1,682 m² | — | 11.4 GWh | — |
| DC01 -Baltic Creative Liverpool, Merseyside, GB | Operational | — | 1,679 m² | — | 11.4 GWh | 0 |
| MyHostingSpace - Peterborough Peterborough, Huntingdonshire, GB | Operational | — | 1,669 m² | — | 11.3 GWh | 6 |
| Centersquare London (LHR2) London, England, GB | Operational | — | 1,633 m² | — | 11.1 GWh | 5 |
| GV7 Data Centre London, GB | Operational | — | 1,633 m² | — | 5.5 GWh | 0 |
| IX Liverpool - MICT Liverpool, Merseyside, GB | Operational | — | 1,602 m² | — | 10.9 GWh | 0 |
| iomart DC6 Turing House Manchester, GB | Operational | — | 1,573 m² | — | 42.7 GWh | 3 |
| Redcentric Cambridge Cambridge, GB | Operational | — | 1,536 m² | — | 20.9 GWh | — |
| VeloxServ DC3 - Redditch Redditch, Worcestershire, GB | Operational | — | 1,469 m² | — | 10 GWh | 6 |
| Indectron GCR1 - Gloucester, Shield House Gloucester, GB | Operational | — | 1,462 m² | — | 9.9 GWh | 5 |
| aql DC3 Leeds, West Yorkshire, GB | Operational | — | 1,446 m² | — | 9.8 GWh | 5 |
| Six Degrees Data Centre GB | Operational | — | 1,436 m² | — | 9.8 GWh | — |
| EXA Datacenter Bracknell Bracknell, GB | Operational | — | 1,402 m² | — | 19 GWh | 0 |
| Volta · London London, GB | Operational | — | 1,398 m² | — | 4.7 GWh | 39 |
| Verne Global London Data Centre London, GB | Operational | — | 1,398 m² | — | 4.7 GWh | — |
| Datacenta DIP Winfrith Newburgh, Dorset, GB | Operational | — | 1,393 m² | — | 9.5 GWh | 0 |
| ANS - MAN4 Manchester, Lancashire, GB | Operational | — | 1,368 m² | — | 18.6 GWh | 4 |
| University Shared Data Centre GB | Operational | — | 1,338 m² | — | 9.1 GWh | — |
| 4D Gatwick (Crawley) Crawley, West Sussex, GB | Operational | — | 1,320 m² | — | 9 GWh | 4 |
| Digital Realty London LHR20 London, GB | Operational | — | 1,267 m² | 1.38 | 8.4 GWh | 93 |
| Midlands Technology Centre Wolverhampton, GB | Operational | — | 1,262 m² | — | 8.6 GWh | 1 |
| ABStation Greenwich, London, GB | Operational | — | 1,228 m² | — | 8.3 GWh | 1 |
| Level(3) London (Braham Street) London, GB | Operational | — | 1,210 m² | — | 16.4 GWh | 6 |
| Stellanor London East London, GB | Operational | — | 1,210 m² | — | 16.4 GWh | — |
| Nasstar GBTEL01 Datapoint House Telford, Shropshire, GB | Operational | — | 1,203 m² | — | 8.2 GWh | 2 |
| Internet Central data center (United Kingdom) GB | Operational | — | 1,163 m² | — | 23.7 GWh | — |
| West Cambridge Data Centre Cambridge, GB | Operational | — | 1,156 m² | — | 7.9 GWh | — |
| Redcentric Byfleet GB | Operational | — | 1,142 m² | — | 7.8 GWh | — |
| SSE data center (Havant) Havant, GB | Operational | — | 1,141 m² | — | 7.7 GWh | — |
| Pulsant Edinburgh SC-3 (Newbridge) Edinburgh, GB | Operational | — | 1,116 m² | 1.56 | 8.3 GWh | 2 |
Vantage Data Centers · Newport, United Kingdom
CyrusOne · Iver Heath, United Kingdom
Global Switch · London, United Kingdom
Global Switch · London, United Kingdom
Vantage Data Centers · London, United Kingdom
Colt · Hayes, United Kingdom
Global Technical Realty · United Kingdom
Ark Data Centres · Chertsey, United Kingdom
Colt · Welwyn Garden City, United Kingdom
Kao Data KLON-01
35 MW
Kao Data · Harlow, United Kingdom
NTT DATA Global Data Centers · Dagenham, United Kingdom
Colt · Hayes, United Kingdom
Colt · Hayes, United Kingdom
Equinix · London, United Kingdom
Colt · Hayes, United Kingdom
VIRTUS Data Centres · Slough, United Kingdom
Equinix · Slough, United Kingdom
VIRTUS Data Centres · Hayes, United Kingdom
Colt · Hayes, United Kingdom
Imperium 315
21 MW
NYSE Euronext · Basildon, United Kingdom
NTT DATA Global Data Centers · Hemel Hempstead, United Kingdom
nLighten · Swindon, United Kingdom
CyrusOne London 4
18 MW
CyrusOne · Slough, United Kingdom
Global Switch · London, United Kingdom
CyrusOne London 5
18 MW
CyrusOne · Slough, United Kingdom
Kao Data KLON-06
16 MW
Kao Data · Slough, United Kingdom
VIRTUS Data Centres · Hayes, United Kingdom
Gravity Edge LDN1
15 MW
Gravity Edge · Camberley, United Kingdom
China Mobile International · Slough, United Kingdom
CyrusOne London 2
14 MW
CyrusOne · West Drayton, United Kingdom
VIRTUS Data Centres · Hayes, United Kingdom
NTT DATA Global Data Centers · Hemel Hempstead, United Kingdom
nLighten · Bristol, United Kingdom
nLighten Nottingham EMA1
9.6 MW
nLighten · Nottingham, United Kingdom
Colt · London, United Kingdom
CyrusOne · Slough, United Kingdom
CyrusOne · Slough, United Kingdom
VIRTUS LONDON3 (Slough)
7.2 MW
VIRTUS Data Centres · Slough, United Kingdom
Virtus London 10
6.6 MW
VIRTUS Data Centres · Slough, United Kingdom
CSquare · United Kingdom
nLighten Chester
6 MW
nLighten · Chester, United Kingdom
nLighten · Milton Keynes, United Kingdom
NTT DATA Global Data Centers · Hemel Hempstead, United Kingdom
nLighten Leeds LBA1
3.6 MW
nLighten · Normanton, United Kingdom
NTT DATA Global Data Centers · Slough, United Kingdom
Google · United Kingdom
DXC Wynyard Data Center
≈ 26 MW
HPE · United Kingdom
Morgan Stanley · Hounslow, United Kingdom
Digital Realty London LGW14
≈ 41 MW
Digital Realty · Woking, United Kingdom
ARO DC2 Kilby House (AIMES)
≈ 15 MW
AIMES · Liverpool, United Kingdom
Iron Mountain Data Centers · Slough, United Kingdom
Lincoln Rackhouse London
≈ 4.1 MW
Lincoln Rackhouse · Camberley, United Kingdom
Bank Of America · United Kingdom
Equinix · Slough, United Kingdom
Lloyds Banking Group · United Kingdom
NatWest Group · United Kingdom
Hertfordshire Data Centre
≈ 26 MW
CapitaLand Ascendas REIT · Welwyn Garden City, United Kingdom
RBS Data Centre
≈ 11 MW
NatWest Group · United Kingdom
Digital Realty LGW16
≈ 11 MW
Digital Realty · Crawley, United Kingdom
Pure DC London Brent Cross
≈ 11 MW
Pure DC · United Kingdom
1–200 of 395 chevron_right