9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries
expand_lessStatus
Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll countriesmapShow on map
publicData centers in North Macedonia
About these figures
Carbon intensity = LIFECYCLE gCO2e/kWh (Ember via Our World in Data), 2024. Renewable share = OWID/Ember; low-carbon (renewables+nuclear) and fossil shares computed from Ember 2024 TWh in OWID elec-mix-bar. Industrial price: Eurostat nrg_pc_205 2025-S2 (band ID 2-20 GWh, excl. VAT & recoverable taxes, EUR/kWh) for EU/EEA/candidates; otherwise GlobalPetrolPrices business rate (USD/kWh, 2023-2025 average) - not directly comparable. Water stress: WRI Aqueduct baseline water stress (country score/category as republished by WorldPopulationReview, WRI 2019 data; Aqueduct 4.0 file is a zip, not readable). WRI score not listed on WPR (category High). Price from Eurostat (MK is a reporting country).
Data centers
6
Operators
2
Reported MW
0 MW
Pipeline MW
0 MW
Est. energy / yr
48.9 GWh
Est. CO₂ / yr
24.9 kt
Building area
2,250 m²
boltPower & water context
Grid carbon intensity
510.3 gCO₂e/kWh
Country 2024
Renewables in the grid
39%
Country 2024
Low-carbon share (RE + nuclear)
39%
Country 2024
Fossil share
61%
Country 2024
Industrial electricity price
0.12
Country 2025-S2 · EUR/kWh (excl. VAT & recoverable taxes; band ID 2,000-19,999 MWh)
Water stress (WRI Aqueduct)
score: None · category: High (40%-80%)
Country 2019 · WRI Aqueduct baseline water stress score 0-5
mapMap
corporate_fareLargest operators
by reported MWlocation_cityData centers by city
dnsData centers
6 · largest first| Data center | Status | Capacity | Building | PUE | Energy (est) | Networks |
|---|---|---|---|---|---|---|
| Faculty of Computer Science and Engineering · Skopje Skopje, MK | Operational | — | 2,157 m² | — | 14.7 GWh | 2 |
| ФИНКИ data center (North Macedonia) MK | Operational | — | 93 m² | — | 632 MWh | — |
| Neotel DC Skopje · Skopje Skopje, MK | Operational | — | — | — | 6.3 GWh | 3 |
| Ss. Cyril and Methodius University - Rectorate Skopje, MK | Operational | — | — | — | 6.3 GWh | 1 |
| :IW Connect MK | Operational | — | — | — | 10.5 GWh | — |
| Elektra Hani i Elezit, MK | Operational | — | — | — | 10.5 GWh | — |
Faculty of Computer Science and Engineering, Ss. Cyril and Methodius University in Skopje · Skopje, North Macedonia
ФИНКИ · North Macedonia
Neotel AD Skopje · Skopje, North Macedonia
Faculty of Computer Science and Engineering, Ss. Cyril and Methodius University in Skopje · Skopje, North Macedonia
North Macedonia
Hani i Elezit, North Macedonia