9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries

expand_lessStatus

Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll countries

publicData centers in North Macedonia

About these figures

Carbon intensity = LIFECYCLE gCO2e/kWh (Ember via Our World in Data), 2024. Renewable share = OWID/Ember; low-carbon (renewables+nuclear) and fossil shares computed from Ember 2024 TWh in OWID elec-mix-bar. Industrial price: Eurostat nrg_pc_205 2025-S2 (band ID 2-20 GWh, excl. VAT & recoverable taxes, EUR/kWh) for EU/EEA/candidates; otherwise GlobalPetrolPrices business rate (USD/kWh, 2023-2025 average) - not directly comparable. Water stress: WRI Aqueduct baseline water stress (country score/category as republished by WorldPopulationReview, WRI 2019 data; Aqueduct 4.0 file is a zip, not readable). WRI score not listed on WPR (category High). Price from Eurostat (MK is a reporting country).

mapShow on map
Data centers
6
Operators
2
Reported MW
0 MW
Pipeline MW
0 MW
Est. energy / yr
48.9 GWh
Est. CO₂ / yr
24.9 kt
Building area
2,250 m²

boltPower & water context

Grid carbon intensity
510.3 gCO₂e/kWh
Country 2024
Renewables in the grid
39%
Country 2024
Low-carbon share (RE + nuclear)
39%
Country 2024
Fossil share
61%
Country 2024
Industrial electricity price
0.12
Country 2025-S2 · EUR/kWh (excl. VAT & recoverable taxes; band ID 2,000-19,999 MWh)
Water stress (WRI Aqueduct)
score: None · category: High (40%-80%)
Country 2019 · WRI Aqueduct baseline water stress score 0-5

mapMap

location_cityData centers by city

Skopje3
Hani i Elezit1

dnsData centers

6 · largest first
Data centerStatusCapacityBuildingPUEEnergy (est)Networks
Faculty of Computer Science and Engineering · Skopje
Skopje, MK
Operational—2,157 m²—14.7 GWh2
ФИНКИ data center (North Macedonia)
MK
Operational—93 m²—632 MWh—
Neotel DC Skopje · Skopje
Skopje, MK
Operational———6.3 GWh3
Ss. Cyril and Methodius University - Rectorate
Skopje, MK
Operational———6.3 GWh1
:IW Connect
MK
Operational———10.5 GWh—
Elektra
Hani i Elezit, MK
Operational———10.5 GWh—
Faculty of Computer Science and Engineering, Ss. Cyril and Methodius University in Skopje · Skopje, North Macedonia
Operational · Colocation · 2,157 m² · 2 networks
ФИНКИ · North Macedonia
Operational · Colocation · 93 m²
Neotel AD Skopje · Skopje, North Macedonia
Operational · Colocation · 3 networks
Faculty of Computer Science and Engineering, Ss. Cyril and Methodius University in Skopje · Skopje, North Macedonia
Operational · Colocation · 1 networks
North Macedonia
Operational · Enterprise
Hani i Elezit, North Macedonia
Operational · Enterprise