9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries

expand_lessStatus

Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll countries

publicData centers in Portugal

About these figures

Carbon intensity = LIFECYCLE gCO2e/kWh (Ember via Our World in Data), 2024. Renewable share = OWID/Ember; low-carbon (renewables+nuclear) and fossil shares computed from Ember 2024 TWh in OWID elec-mix-bar. Industrial price: Eurostat nrg_pc_205 2025-S2 (band ID 2-20 GWh, excl. VAT & recoverable taxes, EUR/kWh) for EU/EEA/candidates; otherwise GlobalPetrolPrices business rate (USD/kWh, 2023-2025 average) - not directly comparable. Water stress: WRI Aqueduct baseline water stress (country score/category as republished by WorldPopulationReview, WRI 2019 data; Aqueduct 4.0 file is a zip, not readable).

mapShow on map
Data centers
25
Operators
15
Reported MW
39 MW
Pipeline MW
1.16 GW
Est. energy / yr
598.7 GWh
Est. CO₂ / yr
66.2 kt
Building area
76,003 m²

boltPower & water context

Grid carbon intensity
110.64 gCO₂e/kWh
Country 2024
Renewables in the grid
85%
Country 2024
Low-carbon share (RE + nuclear)
85%
Country 2024
Fossil share
15%
Country 2024
Industrial electricity price
0.12
Country 2025-S2 · EUR/kWh (excl. VAT & recoverable taxes; band ID 2,000-19,999 MWh)
Water stress (WRI Aqueduct)
score: 3.26 · category: High (40%-80%)
Country 2019 · WRI Aqueduct baseline water stress score 0-5
Data-center regulation
EU Energy Efficiency Directive (EU) 2023/1791 explicitly covers data centres (EU-wide DC energy-performance reporting, implemented via Delegated Regulation (EU) 2024/1364).
Country 2023
Data-center regulation
Industry self-regulation: Climate Neutral Data Centre Pact (PUE <1.3, or 1.4 warm climates, by 2030; new DCs from 2025; 75% clean energy by end-2025, 100% by 2030; WUE 0.4 L/kWh in water-stressed areas).
Country 2021
Data-center regulation
Decree-Law 84/2024 sets regime for monitoring and publishing data-centre energy performance (transposes EED Art. on DCs; implements Delegated Reg. 2024/1364).
Country 2024

mapMap

dnsData centers

25 · largest first
Data centerStatusCapacityBuildingPUEEnergy (est)Networks
Start Campus SIN01
Sines, PT
Operational38 MW17,181 m²1.1216.8 GWh4
NOS Imopolis II
PT
Operational1.3 MW13,948 m²1.5610.4 GWh—
AtlasEdge DC Lisbon LIS001
Lisbon, PT
Operational—13,948 m²—47.4 GWh0
Altia Datacenter
PT
Operational—4,654 m²—31.6 GWh—
dotsi - Lisbon DC01
Lisbon, Lisbon, PT
Operational—4,156 m²—28.2 GWh2
ONI Telecom Lisbon Matinha
Lisbon, PT
Operational—3,526 m²—23.9 GWh7
Data Center Portugal Telecom da Covilhã
PT
Operational—3,134 m²—63.9 GWh—
REN Datacenter Riba de Ave
Vila Nova de Famalicao, PT
Operational—2,595 m²—8.8 GWh3
Centro de Computação Avançada do Minho
PT
Operational—2,595 m²—8.8 GWh—
Seixal Colocation Site
PT
Operational—2,445 m²—16.6 GWh—
Equinix LS2 - Lisbon
Lisbon, Lisbon, PT
Operational—1,953 m²1.3712.8 GWh2
MEO LDV
Lisbon, PT
Operational—1,931 m²—13.1 GWh11
Equinix LS1 - Lisbon
Lisbon, PT
Operational—1,632 m²1.3723.7 GWh83
FCCN itconic
Prior Velho, Lisboa, PT
Operational—1,632 m²—16.6 GWh1
Altice data center (Portugal)
PT
Operational—421 m²—2.9 GWh—
MEO data center (Portugal)
PT
Operational—252 m²—1.7 GWh—
FCCN Lisbon - SE06
Lisbon, Lisbon, PT
Operational———6.3 GWh11
FCCN Lisbon - SE03
Lisbon, Lisbon, PT
Operational———6.3 GWh10
Start Campus SIN02
Sines, PT
Operational———6.3 GWh0
Data Center IPT
PT
Operational———10.5 GWh—
Data center · Portugal
PT
Operational———10.5 GWh—
Data center · Portugal
PT
Operational———10.5 GWh—
Data center · Portugal
PT
Operational———10.5 GWh—
Data center · Portugal
PT
Operational———10.5 GWh—
Digital Realty LIS1 (Rua do Proletariado 14, Carnaxide)
Oeiras, Lisbon, PT
Operational——1.38——
Start Campus · Sines, Portugal
Operational · Enterprise · 17,181 m² · 4 networks
NOS · Portugal
Operational · Colocation · 13,948 m² · PUE 1.56
AtlasEdge · Lisbon, Portugal
Operational · Colocation · 13,948 m²
Altia · Portugal
Operational · Colocation · 4,654 m²
Dotsi, Unipessoal Lda. · Lisbon, Portugal
Operational · Colocation · 4,156 m² · 2 networks
OniTelecom · Lisbon, Portugal
Operational · Colocation · 3,526 m² · 7 networks
Portugal Telecom · Portugal
Operational · Colocation · 3,134 m²
RENTELECOM · Vila Nova de Famalicao, Portugal
Operational · Colocation · 2,595 m² · 3 networks
Fundacao para a Ciencia e a Tecnologia, I.P. · Portugal
Operational · Colocation · 2,595 m²
TATA Communications Ltd · Portugal
Operational · Colocation · 2,445 m²
Equinix · Lisbon, Portugal
Operational · Colocation · 1,953 m² · 2 networks
MEO LDV
≈ 1.8 MW
MEO - SERVICOS DE COMUNICACOES E MULTIMEDIA S.A. · Lisbon, Portugal
Operational · Colocation · 1,931 m² · 11 networks
Equinix · Lisbon, Portugal
Operational · Colocation · 1,632 m² · 83 networks
FCCN itconic
≈ 2.2 MW
Fundacao para a Ciencia e a Tecnologia, I.P. · Prior Velho, Portugal
Operational · Colocation · 1,632 m² · 1 networks
Altice · Portugal
Operational · Colocation · 421 m²
MEO - SERVICOS DE COMUNICACOES E MULTIMEDIA S.A. · Portugal
Operational · Colocation · 252 m²
Fundacao para a Ciencia e a Tecnologia, I.P. · Lisbon, Portugal
Operational · Colocation · 11 networks
National Laboratory of Civil Engineering (LNEC) · Lisbon, Portugal
Operational · Colocation · 10 networks
Start Campus · Sines, Portugal
Operational · Colocation
Portugal
Operational · Enterprise
Portugal
Operational · Enterprise
Portugal
Operational · Enterprise
Portugal
Operational · Enterprise
Portugal
Operational · Enterprise
Digital Realty · Oeiras, Portugal
Operational · Colocation · PUE 1.38