9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries
expand_lessStatus
Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll countriesmapShow on map
publicData centers in Portugal
About these figures
Carbon intensity = LIFECYCLE gCO2e/kWh (Ember via Our World in Data), 2024. Renewable share = OWID/Ember; low-carbon (renewables+nuclear) and fossil shares computed from Ember 2024 TWh in OWID elec-mix-bar. Industrial price: Eurostat nrg_pc_205 2025-S2 (band ID 2-20 GWh, excl. VAT & recoverable taxes, EUR/kWh) for EU/EEA/candidates; otherwise GlobalPetrolPrices business rate (USD/kWh, 2023-2025 average) - not directly comparable. Water stress: WRI Aqueduct baseline water stress (country score/category as republished by WorldPopulationReview, WRI 2019 data; Aqueduct 4.0 file is a zip, not readable).
Data centers
25
Operators
15
Reported MW
39 MW
Pipeline MW
1.16 GW
Est. energy / yr
598.7 GWh
Est. CO₂ / yr
66.2 kt
Building area
76,003 m²
boltPower & water context
Grid carbon intensity
110.64 gCO₂e/kWh
Country 2024
Renewables in the grid
85%
Country 2024
Low-carbon share (RE + nuclear)
85%
Country 2024
Fossil share
15%
Country 2024
Industrial electricity price
0.12
Country 2025-S2 · EUR/kWh (excl. VAT & recoverable taxes; band ID 2,000-19,999 MWh)
Water stress (WRI Aqueduct)
score: 3.26 · category: High (40%-80%)
Country 2019 · WRI Aqueduct baseline water stress score 0-5
Data-center regulation
EU Energy Efficiency Directive (EU) 2023/1791 explicitly covers data centres (EU-wide DC energy-performance reporting, implemented via Delegated Regulation (EU) 2024/1364).
Country 2023
Data-center regulation
Industry self-regulation: Climate Neutral Data Centre Pact (PUE <1.3, or 1.4 warm climates, by 2030; new DCs from 2025; 75% clean energy by end-2025, 100% by 2030; WUE 0.4 L/kWh in water-stressed areas).
Country 2021
Data-center regulation
Decree-Law 84/2024 sets regime for monitoring and publishing data-centre energy performance (transposes EED Art. on DCs; implements Delegated Reg. 2024/1364).
Country 2024
mapMap
corporate_fareLargest operators
by reported MWlocation_cityData centers by city
dnsData centers
25 · largest first| Data center | Status | Capacity | Building | PUE | Energy (est) | Networks |
|---|---|---|---|---|---|---|
| Start Campus SIN01 Sines, PT | Operational | 38 MW | 17,181 m² | 1.1 | 216.8 GWh | 4 |
| NOS Imopolis II PT | Operational | 1.3 MW | 13,948 m² | 1.56 | 10.4 GWh | — |
| AtlasEdge DC Lisbon LIS001 Lisbon, PT | Operational | — | 13,948 m² | — | 47.4 GWh | 0 |
| Altia Datacenter PT | Operational | — | 4,654 m² | — | 31.6 GWh | — |
| dotsi - Lisbon DC01 Lisbon, Lisbon, PT | Operational | — | 4,156 m² | — | 28.2 GWh | 2 |
| ONI Telecom Lisbon Matinha Lisbon, PT | Operational | — | 3,526 m² | — | 23.9 GWh | 7 |
| Data Center Portugal Telecom da Covilhã PT | Operational | — | 3,134 m² | — | 63.9 GWh | — |
| REN Datacenter Riba de Ave Vila Nova de Famalicao, PT | Operational | — | 2,595 m² | — | 8.8 GWh | 3 |
| Centro de Computação Avançada do Minho PT | Operational | — | 2,595 m² | — | 8.8 GWh | — |
| Seixal Colocation Site PT | Operational | — | 2,445 m² | — | 16.6 GWh | — |
| Equinix LS2 - Lisbon Lisbon, Lisbon, PT | Operational | — | 1,953 m² | 1.37 | 12.8 GWh | 2 |
| MEO LDV Lisbon, PT | Operational | — | 1,931 m² | — | 13.1 GWh | 11 |
| Equinix LS1 - Lisbon Lisbon, PT | Operational | — | 1,632 m² | 1.37 | 23.7 GWh | 83 |
| FCCN itconic Prior Velho, Lisboa, PT | Operational | — | 1,632 m² | — | 16.6 GWh | 1 |
| Altice data center (Portugal) PT | Operational | — | 421 m² | — | 2.9 GWh | — |
| MEO data center (Portugal) PT | Operational | — | 252 m² | — | 1.7 GWh | — |
| FCCN Lisbon - SE06 Lisbon, Lisbon, PT | Operational | — | — | — | 6.3 GWh | 11 |
| FCCN Lisbon - SE03 Lisbon, Lisbon, PT | Operational | — | — | — | 6.3 GWh | 10 |
| Start Campus SIN02 Sines, PT | Operational | — | — | — | 6.3 GWh | 0 |
| Data Center IPT PT | Operational | — | — | — | 10.5 GWh | — |
| Data center · Portugal PT | Operational | — | — | — | 10.5 GWh | — |
| Data center · Portugal PT | Operational | — | — | — | 10.5 GWh | — |
| Data center · Portugal PT | Operational | — | — | — | 10.5 GWh | — |
| Data center · Portugal PT | Operational | — | — | — | 10.5 GWh | — |
| Digital Realty LIS1 (Rua do Proletariado 14, Carnaxide) Oeiras, Lisbon, PT | Operational | — | — | 1.38 | — | — |
Start Campus SIN01
38 MW
Start Campus · Sines, Portugal
NOS Imopolis II
1.3 MW
NOS · Portugal
AtlasEdge DC Lisbon LIS001
≈ 6.3 MW
AtlasEdge · Lisbon, Portugal
Altia Datacenter
≈ 4.2 MW
Altia · Portugal
dotsi - Lisbon DC01
≈ 3.8 MW
Dotsi, Unipessoal Lda. · Lisbon, Portugal
ONI Telecom Lisbon Matinha
≈ 3.2 MW
OniTelecom · Lisbon, Portugal
Portugal Telecom · Portugal
REN Datacenter Riba de Ave
≈ 1.2 MW
RENTELECOM · Vila Nova de Famalicao, Portugal
Fundacao para a Ciencia e a Tecnologia, I.P. · Portugal
Seixal Colocation Site
≈ 2.2 MW
TATA Communications Ltd · Portugal
Equinix LS2 - Lisbon
≈ 1.8 MW
Equinix · Lisbon, Portugal
MEO LDV
≈ 1.8 MW
MEO - SERVICOS DE COMUNICACOES E MULTIMEDIA S.A. · Lisbon, Portugal
Equinix LS1 - Lisbon
≈ 3.3 MW
Equinix · Lisbon, Portugal
FCCN itconic
≈ 2.2 MW
Fundacao para a Ciencia e a Tecnologia, I.P. · Prior Velho, Portugal
Altice data center (Portugal)
≈ 0.4 MW
Altice · Portugal
MEO data center (Portugal)
≈ 0.2 MW
MEO - SERVICOS DE COMUNICACOES E MULTIMEDIA S.A. · Portugal
Fundacao para a Ciencia e a Tecnologia, I.P. · Lisbon, Portugal
National Laboratory of Civil Engineering (LNEC) · Lisbon, Portugal
Start Campus · Sines, Portugal
Portugal
Portugal
Portugal
Portugal
Portugal
Digital Realty · Oeiras, Portugal