9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries

expand_lessStatus

Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll countries

publicData centers in United States

About these figures

added by main agent (US records were mislabelled MX in source data)

mapShow on map
Data centers
3,725
Operators
1,243
Reported MW
57.01 GW
Pipeline MW
428.44 GW
Est. energy / yr
156.81 TWh
Est. CO₂ / yr
60.18 Mt
Building area
324,066 m²

boltPower & water context

Grid carbon intensity
383.78 gCO₂e/kWh
Country 2024

mapMap

location_cityData centers by state

Texas256
California228
Virginia220
Ohio150
Illinois129
New York124
Georgia120
Pennsylvania114
Washington92
Iowa91
Florida89
North Carolina87
Arizona82
Tennessee74
Michigan71

dnsData centers

3,725 · largest first
Data centerStatusCapacityBuildingPUEEnergy (est)Networks
Creekstone Energy Delta Gigasite
Delta, UT, US
Under construction10 GW————
PORTS-Pike Technology Campus
Piketon, OH, US
Under construction10 GW————
Stratos AI Data Center Campus
Lucin, UT, US
Planned / permitted9 GW————
GW Ranch
TX, US
Planned / permitted7.65 GW————
Lea County Data Center
Lovington, NM, US
Planned / permitted7 GW————
Data City, Texas
Laredo, TX, US
Planned / permitted5 GW————
Meta Hyperion (Richland Parish) Data Center
Holly Ridge, LA, US
Under construction5 GW—1.08——
Homer City Energy Campus — natural gas generation
Homer City, PA, US
Under construction4.5 GW————
Homer City Energy Campus
Homer City, PA, US
Under construction4.5 GW————
Joule Energy and Data Center Campus
Holden, UT, US
Under construction4 GW————
PowerHouse Caldwell County Data Center
Uhland, TX, US
Planned / permitted4 GW————
SunZia Wind
NM, US
Operational3.65 GW————
4-3 Glenbrook Group Salem Township Data Center Campus (Salem 3)
Salem Township, PA, US
Planned / permitted3.5 GW————
Project Merlin (Helios II)
McGregor, TX, US
Planned / permitted3.5 GW————
Project Camellia (OpenAI Effingham County Campus)
Rincon, GA, US
Planned / permitted3.2 GW————
North Creek Technology Campus (NCTC)
Louisa, VA, US
Planned / permitted3 GW—1.14——
Cumberland Energy Center
VA, US
Planned / permitted3 GW————
Stak Energy North Slope Data Center
AK, US
Planned / permitted3 GW————
Project Cayman (ONE Nuclear gas-fired plant & battery storage)
Donaldsonville, LA, US
Planned / permitted2.88 GW————
Tallgrass Cheyenne Power Hub (BFC Power Project)
Cheyenne, WY, US
Planned / permitted2.7 GW————
Project Tembo
Cheyenne, WY, US
Under construction2.7 GW—1.09——
Mt. Storm Combined Cycle Station
Mount Storm, WV, US
Planned / permitted2.6 GW————
NIPSCO GenCo Schahfer Natural Gas Plants
Wheatfield, IN, US
Planned / permitted2.6 GW————
Susquehanna Steam Electric Station
Berwick, PA, US
Operational2.51 GW————
Tract Virginia Highlands Technology Park
Lockwood, NV, US
Planned / permitted2.5 GW————
Steel River Energy Center
Wilson, AR, US
Under construction2.46 GW————
Adams Fork Energy Campus Power Plant (Harless Industrial Park, Holden)
Holden, WV, US
Planned / permitted2.46 GW————
Adams Fork Energy Campus Power Plant (Twisted Gun Golf Course, Wharncliffe)
Wharncliffe, WV, US
Planned / permitted2.46 GW————
Comanche Peak Nuclear Power Plant (AWS PPA)
Glen Rose, TX, US
Operational2.4 GW————
AWS Hobart Campus
Hobart, IN, US
Under construction2.4 GW—1.14——
Hanover Technology Park
VA, US
Under construction2.4 GW————
Entergy Pointe Coupee CCCT Units 1-3
New Roads, LA, US
Planned / permitted2.26 GW————
Canadys Station
Canadys, SC, US
Planned / permitted2.2 GW————
V.C. Summer Units 2 and 3 (restart)
Jenkinsville, SC, US
Planned / permitted2.2 GW————
Monarch Cloud Campus On-Site Generation (864-engine natural gas microgrid)
Point Pleasant, WV, US
Planned / permitted2.16 GW————
Project Tamarack
West Columbia, WV, US
Planned / permitted2.16 GW————
Heartland Industrial Park (Fluidstack Sullivan County Campus)
Merom, IN, US
Under construction2.1 GW————
Aligned Project Phoenix (Shippingport)
Shippingport, PA, US
Under construction2 GW————
Desert Sun Power Plant
Gila Bend, AZ, US
Planned / permitted2 GW————
Comanche Circle
Tolar, TX, US
Planned / permitted2 GW————
Calvert Cliffs New Nuclear Expansion
Lusby, MD, US
Planned / permitted2 GW————
Granite Renewables Logan County Data Center Campus
Sterling, CO, US
Planned / permitted2 GW————
Green Data Socorro Campus
Socorro, NM, US
Cancelled / closed2 GW————
IREN Sweetwater Campus
Sweetwater, TX, US
Under construction2 GW————
Microsoft Pecos Data Center Campus
Pecos, TX, US
Planned / permitted2 GW—1.17——
NextEra Paducah Site Dedicated Generation
Kevil, KY, US
Planned / permitted2 GW————
Monarch Compute Campus
Point Pleasant, WV, US
Under construction2 GW————
Poolside Project Horizon AI Campus
TX, US
Planned / permitted2 GW————
Potentia Oklahoma Campus 02 (Inola)
Inola, OK, US
Planned / permitted2 GW————
Rubix Ashland Works Data Center Campus
Russell, KY, US
Planned / permitted2 GW————
Seminoe Generating Station
WY, US
Planned / permitted2 GW————
Savannah River Site Energy Generation Project (Amentum)
SC, US
Planned / permitted2 GW————
Tract Caldwell Valley Technology Park
Uhland, TX, US
Planned / permitted2 GW————
xAI Southaven (MACROHARDRR)
Southaven, MS, US
Operational2 GW——90.4 GWh—
Beaver Valley Power Station
Shippingport, PA, US
Operational1.87 GW————
Paducah Site AI Data Center Campus
Kevil, KY, US
Planned / permitted1.8 GW————
Joliet Technology Center
Joliet, IL, US
Planned / permitted1.8 GW————
Victory Logistics District On-Site Gas Generation
Fernley, NV, US
Planned / permitted1.8 GW————
PowerHouse Grand Prairie Campus
Grand Prairie, TX, US
Under construction1.8 GW————
Project Cardinal Data Center Campus
Yorkville, IL, US
Planned / permitted1.8 GW————
Buckeye Tech Corridor
Buckeye, AZ, US
Planned / permitted1.8 GW————
Sagebrush Hallam Hyperscale Campus (proposed)
Hallam, NE, US
Planned / permitted1.7 GW————
Marigold Energy Center
Stanfield, AZ, US
Planned / permitted1.68 GW————
Mount Storm Power Station
Mount Storm, WV, US
Operational1.66 GW————
IREN Woods County Campus
Alva, OK, US
Planned / permitted1.6 GW————
Tract Silver Springs Data Center Park
Silver Springs, NV, US
Planned / permitted1.6 GW————
Wildcat Ridge AI Data Center Campus
Archbald, PA, US
Planned / permitted1.6 GW————
Hassayampa Ranch Data Center
Tonopah, AZ, US
Planned / permitted1.5 GW————
AWS Project Galaxy — Sidney, OH
Sidney, OH, US
Under construction1.5 GW—1.14——
Red Butte Energy and Data Center Campus
Newcastle, UT, US
Planned / permitted1.5 GW————
Cloverleaf Project Open Sky
Piedmont, OK, US
Planned / permitted1.5 GW————
Project Red Clay
AL, US
Planned / permitted1.5 GW————
Core Scientific Pecos AI Campus
Pecos, TX, US
Under construction1.5 GW————
Crusoe Victoria AI Factory
Victoria, TX, US
Planned / permitted1.5 GW————
Franklin Farms Power Station
Holly Ridge, LA, US
Under construction1.5 GW————
Luckett Road Data Centers (Fremont Peak Properties)
Marana, AZ, US
Planned / permitted1.5 GW————
Gouldsboro Data Center Campus (Project Gold)
Clifton Township, PA, US
Planned / permitted1.5 GW————
Microsoft Fairwater Atlanta (Azure AI Superfactory)
Fayetteville, GA, US
Operational1.5 GW—1.17114.6 GWh—
Project River Energy Campus
Cleveland, TN, US
Planned / permitted1.5 GW————
Prometheus Hyperscale Falls Ranch Data Center Campus
Glenrock, WY, US
Planned / permitted1.5 GW————
Antelope Data Center (Project Antelope)
Cedar City, UT, US
Planned / permitted1.5 GW————
Stargate Lordstown Campus
Lordstown, OH, US
Under construction1.5 GW————
Takanock Goshen Data Center
Goshen, IN, US
Planned / permitted1.5 GW————
River Run Energy Center
Stanton, ND, US
Planned / permitted1.45 GW————
Princeton Road Station
NE, US
Under construction1.41 GW————
A1 Data Center Campus · Millville
Millville, NJ, US
Cancelled / closed1.4 GW————
Alterra Marshall Technology & Energy Center
Marshall, MI, US
Planned / permitted1.4 GW————
Rock Air Data Center Campus
Rockford, IL, US
Planned / permitted1.4 GW————
Stargate The Barn Campus
Saline Township, MI, US
Under construction1.4 GW————
Vantage Frontier Campus
TX, US
Under construction1.4 GW————
Anderson Plant (Duke Energy Combined-Cycle Natural Gas Plant)
Starr, SC, US
Planned / permitted1.36 GW————
Duke Energy Davidson County Combined Cycle (CC4)
NC, US
Planned / permitted1.36 GW————
PAX — Pennsylvania Digital I
Carlisle, PA, US
Under construction1.35 GW————
Montour CT Project (Montour plant gas turbine expansion)
Washingtonville, PA, US
Planned / permitted1.31 GW————
AWS Sprigg Township Data Center Campus (Buck Canyon)
Manchester, OH, US
Planned / permitted1.3 GW—1.14——
Fairfield Energy Center
OH, US
Planned / permitted1.3 GW————
Project Bunkhouse (Digital Realty Data Center Campus)
Stilesboro, GA, US
Planned / permitted1.3 GW—1.38——
Pleasants Power Station
Willow Island, WV, US
Operational1.28 GW————
Lincoln Land Energy Center · Pawnee
Pawnee, IL, US
Planned / permitted1.28 GW————
Perry Nuclear Power Plant
North Perry, OH, US
Operational1.27 GW————
Project Arrowhead (Premier Data Center Development Irwin County Campus)
Mystic, GA, US
Planned / permitted1.25 GW————
Prometheus Hyperscale Atlas Industrial Park Data Center Campus
Evanston, WY, US
Planned / permitted1.25 GW————
Lovejoy Data Center Campus (Stillwater Development)
Lovejoy, GA, US
Cancelled / closed1.25 GW————
Terra Energy Center (Susitna coal plant)
AK, US
Planned / permitted1.25 GW————
Zenith Volts Roswell / Chaves County Data Center
Roswell, NM, US
Planned / permitted1.24 GW————
Project Aquila
TX, US
Planned / permitted1.24 GW————
Beltline Energy Piedmont Site
Piedmont, OK, US
Planned / permitted1.2 GW————
CloudBurst San Marcos GigaCenter
San Marcos, TX, US
Under construction1.2 GW————
Project Bluestem
Tonganoxie, KS, US
Planned / permitted1.2 GW————
Goldendale Energy Storage Project
Goldendale, WA, US
Planned / permitted1.2 GW————
Google Project Spade Campus
New Florence, MO, US
Under construction1.2 GW—1.09——
Cave Point Commerce Center
Cave City, KY, US
Planned / permitted1.2 GW————
Mason County Data Center Campus
Maysville, KY, US
Planned / permitted1.2 GW————
Maidsville Energy Center
Maidsville, WV, US
Planned / permitted1.2 GW————
Nebius AI Factory (Independence)
Independence, MO, US
Under construction1.2 GW————
Oklo Aurora Powerhouse
Piketon, OH, US
Planned / permitted1.2 GW————
QTS Bessemer (Project Marvel)
Bessemer, AL, US
Planned / permitted1.2 GW————
Riverhawk Energy Center
IA, US
Planned / permitted1.2 GW————
Sandow Lakes Energy Station
TX, US
Under construction1.2 GW————
Stargate Milam County Campus
Milam County, TX, US
Under construction1.2 GW————
Project Washington (Starwood Digital Ventures)
Delaware City, DE, US
Planned / permitted1.2 GW————
Florida Ecopark AI Data Center Campus
Fort Meade, FL, US
Planned / permitted1.2 GW————
T5 Chicago IV (CHI IV)
Grayslake, IL, US
Under construction1.2 GW————
Point Beach Nuclear Plant
Two Rivers, WI, US
Operational1.18 GW————
Fort Martin Power Station
Maidsville, WV, US
Operational1.15 GW————
EdgeCore Shannon Hill Data Center Campus
VA, US
Planned / permitted1.1 GW————
Stafford Technology Campus
Falmouth, VA, US
Planned / permitted1.1 GW—1.3——
We Energies Oak Creek Natural Gas Generating Units
Oak Creek, WI, US
Under construction1.1 GW————
Clinton Clean Energy Center
Clinton, IL, US
Operational1.08 GW————
Griffin Energy Project
AZ, US
Planned / permitted1.05 GW————
QTS Cedar Rapids Data Center Campus
Cedar Rapids, IA, US
Under construction1.05 GW————
Meta New Albany Data Center (Prometheus)
New Albany, OH, US
Operational1 GW—1.081.03 TWh—
Marshall Technology & Energy Center Gas Generation
Marshall, MI, US
Cancelled / closed1 GW————
Rock Point Data Center Project
West Plains, WA, US
Planned / permitted1 GW————
AVAIO Digital Leo Campus
AR, US
Planned / permitted1 GW————
Amazon Boardman Exascale Data Center Campus
Boardman, OR, US
Planned / permitted1 GW—1.14——
AWS Project Atlas – Madison County Mega Site (Canton)
Canton, MS, US
Operational1 GW—1.14209.7 GWh—
Beltline Energy Oklahoma City Campus
Oklahoma City, OK, US
Planned / permitted1 GW————
Cipher Colchis Campus
San Angelo, TX, US
Planned / permitted1 GW————
COPT Defense Van Meter Data Center Shell Site
Van Meter, IA, US
Planned / permitted1 GW————
Chesterfield Energy Reliability Center (CERC)
Chester, VA, US
Planned / permitted1 GW————
Meridian Technology Park
Clarksdale, IL, US
Cancelled / closed1 GW————
Fort Cherry Power Station
Robinson Township, PA, US
Planned / permitted1 GW————
Google Nebraska AI Campus (proposed)
NE, US
Planned / permitted1 GW—1.09——
Site MAT 1177
TX, US
Planned / permitted1 GW————
Meta El Paso AI Data Center Campus
El Paso, TX, US
Under construction1 GW—1.08——
Meta Lebanon (Project Domino)
Lebanon, IN, US
Under construction1 GW—1.08——
Microsoft Granger Data Center
Granger, IN, US
Under construction1 GW—1.17——
Microsoft Mount Pleasant Data Center Campus
Mount Pleasant, WI, US
Operational1 GW—1.17114.6 GWh—
Monarch Data Center
Yerington, NV, US
Planned / permitted1 GW————
Project Boulder
SC, US
Planned / permitted1 GW————
Project Cannoli
Van Buren Township, MI, US
Planned / permitted1 GW—1.09——
QTS Project Blue Hole
Blakely, GA, US
Planned / permitted1 GW————
Big Sky Digital Infrastructure Campus
Billings, MT, US
Planned / permitted1 GW————
Related Digital South Works Campus (8080 S DuSable Lake Shore Drive)
Chicago, IL, US
Planned / permitted1 GW————
Savannah River Site AI Data Center (Amentum)
SC, US
Planned / permitted1 GW————
Stargate Project Jupiter
Santa Teresa, NM, US
Under construction1 GW—1.3——
TAC Data Centers Wythe County Campus
VA, US
Planned / permitted1 GW————
Tenaska Southeast Nebraska Power Plant (proposed)
NE, US
Planned / permitted1 GW————
TeraWulf Morgantown Generating Station AI Campus
MD, US
Planned / permitted1 GW————
TeraWulf Muskie Data Campus (EastPark)
Ashland, KY, US
Planned / permitted1 GW————
Tract Altoona Technology Park
Altoona, IA, US
Planned / permitted1 GW————
Morris Technology Park
Morris, IL, US
Planned / permitted1 GW————
Treetop East Fishkill Data Center (proposed, no application filed)
East Fishkill, NY, US
Planned / permitted1 GW————
STACK Infrastructure Goldendale Data Center
Goldendale, WA, US
Planned / permitted958 MW—1.3——
Project Hummingbird Power Plant
Greensboro, PA, US
Planned / permitted944 MW————
Davis-Besse Nuclear Power Station
Oak Harbor, OH, US
Operational908 MW————
Stargate Lighthouse Campus
Port Washington, WI, US
Under construction902 MW————
Lindsay Hill Generating Station
Billingsley, AL, US
Operational900 MW————
CleanArc VA1
Ruther Glen, VA, US
Under construction900 MW————
Pine Ridge Tech Park
GA, US
Planned / permitted900 MW————
Kingsboro AI Data Center Campus
Rocky Mount, NC, US
Planned / permitted900 MW————
Hunting Hawk Technology Park
Glen Allen, VA, US
Cancelled / closed900 MW————
Project Sail – Prologis Data Center Campus
Newnan, GA, US
Planned / permitted900 MW————
Mountain Road Technology Park
VA, US
Cancelled / closed900 MW————
Tuckahoe Technology Park
VA, US
Planned / permitted900 MW————
Duke Energy Buck Combustion Turbines (Rowan County)
Salisbury, NC, US
Planned / permitted850 MW————
Duke Energy Marshall Combustion Turbines (Catawba County)
Sherrills Ford, NC, US
Planned / permitted850 MW————
Intermountain Power Project (IPP Renewed)
Delta, UT, US
Operational840 MW————
Crane Clean Energy Center (Three Mile Island Unit 1)
Middletown, PA, US
Under construction835 MW————
Brightseat Tech Park
Landover, MD, US
Planned / permitted820 MW————
Peru Shelf Technology Park
NV, US
Under construction810 MW————
Ashville Energy Center
OH, US
Planned / permitted800 MW————
Cologix COL7 (Johnstown Campus)
Johnstown, OH, US
Under construction800 MW————
Platte Wind
Ogallala, NE, US
Planned / permitted800 MW————
PowerHouse 95
Spotsylvania, VA, US
Under construction800 MW————
Carrollton Industrial Campus
Carrollton, KY, US
Planned / permitted800 MW————
Springerville Generating Station Coal-to-Gas Conversion
Springerville, AZ, US
Planned / permitted800 MW————
APECS Data Center Campus (Former GM Assembly Plant)
Janesville, WI, US
Planned / permitted800 MW————
Ridgeline Power Plant
WV, US
Planned / permitted785 MW————
AWS Mattermeade Tech Campus
Bowling Green, VA, US
Planned / permitted770 MW—1.14——
CyrusOne Freestone Energy Center Campus
Fairfield, TX, US
Under construction760 MW—1.46——
Cleco Rapides Parish Combustion Turbine (756 MW)
LA, US
Planned / permitted756 MW————
Delta Blues Advanced Power Station
Greenville, MS, US
Under construction754 MW————
Jefferson Power Station
Redfield, AR, US
Under construction754 MW————
Traceview Advanced Power Station
Ridgeland, MS, US
Under construction754 MW————
Vicksburg Advanced Power Station
Vicksburg, MS, US
Under construction754 MW————
Waterford Power Station (new combined-cycle units for Meta)
Killona, LA, US
Planned / permitted754 MW————
Meta Kansas City Data Center
Kansas City, MO, US
Operational750 MW—1.081.03 TWh—
Bitdeer Shalersville Data Center Campus
Shalersville Township, OH, US
Planned / permitted750 MW————
Creekstone Energy · Delta, United States
Under construction · HPC / AI
SB Energy · Piketon, United States
Under construction · Unknown
O'Leary Digital · Lucin, United States
Planned / permitted · HPC / AI
GW Ranch
7.65 GW
Pacifico Energy · United States
Planned / permitted · HPC / AI
New Era Energy & Digital, Inc. · Lovington, United States
Planned / permitted · HPC / AI
Energy Abundance Development Corporation · Laredo, United States
Planned / permitted · HPC / AI
Meta · Holly Ridge, United States
Under construction · Hyperscale / cloud · PUE 1.08
Homer City Redevelopment · Homer City, United States
Under construction · Unknown
Homer City Redevelopment · Homer City, United States
Under construction · HPC / AI
Joule Capital Partners · Holden, United States
Under construction · HPC / AI
PowerHouse Data Centers · Uhland, United States
Planned / permitted · HPC / AI
Pattern Energy · United States
Operational · Unknown
4-3 Glenbrook Group · Salem Township, United States
Planned / permitted · Unknown
Galaxy Data Centers · McGregor, United States
Planned / permitted · Unknown
OpenAI · Rincon, United States
Planned / permitted · Hyperscale / cloud
Amazon Web Services · Louisa, United States
Planned / permitted · Hyperscale / cloud · PUE 1.14
Dominion Energy Virginia · United States
Planned / permitted · Unknown
Stak Energy · United States
Planned / permitted · HPC / AI
ONE Nuclear Energy · Donaldsonville, United States
Planned / permitted · Unknown
Tallgrass Integrated Logistics Solutions · Cheyenne, United States
Planned / permitted · Unknown
Google · Cheyenne, United States
Under construction · Hyperscale / cloud · PUE 1.09
Dominion Energy Virginia · Mount Storm, United States
Planned / permitted · Unknown
NIPSCO Generation LLC (GenCo) · Wheatfield, United States
Planned / permitted · Unknown
Talen Energy · Berwick, United States
Operational · Unknown
Tract · Lockwood, United States
Planned / permitted · HPC / AI
Cypress Creek Renewables · Wilson, United States
Under construction · Unknown
TransGas Development Systems · Holden, United States
Planned / permitted · Unknown
TransGas Development Systems · Wharncliffe, United States
Planned / permitted · Unknown
Vistra · Glen Rose, United States
Operational · Hyperscale / cloud
Amazon Web Services · Hobart, United States
Under construction · Hyperscale / cloud · PUE 1.14
Tract · United States
Under construction · Unknown
Entergy Arkansas · New Roads, United States
Planned / permitted · Unknown
Dominion Energy Virginia · Canadys, United States
Planned / permitted · Unknown
Santee Cooper · Jenkinsville, United States
Planned / permitted · Unknown
Monarch Cloud Campus LLC · Point Pleasant, United States
Planned / permitted · Unknown
Starwood Digital Ventures · West Columbia, United States
Planned / permitted · Unknown
Fluidstack · Merom, United States
Under construction · Unknown
Aligned Data Centers · Shippingport, United States
Under construction · Unknown
Arizona Public Service (APS) · Gila Bend, United States
Planned / permitted · Unknown
Sailfish Digital Ventures (SDV) · Tolar, United States
Planned / permitted · HPC / AI
Constellation Energy · Lusby, United States
Planned / permitted · Unknown
Granite Renewables · Sterling, United States
Planned / permitted · Unknown
Green Data (Green Data Centers) · Socorro, United States
Cancelled / closed · Unknown
IREN (Iris Energy) · Sweetwater, United States
Under construction · HPC / AI
Microsoft · Pecos, United States
Planned / permitted · Hyperscale / cloud · PUE 1.17
NextEra Energy Resources · Kevil, United States
Planned / permitted · Unknown
Nscale · Point Pleasant, United States
Under construction · HPC / AI
Poolside AI · United States
Planned / permitted · HPC / AI
Potentia, Inc. · Inola, United States
Planned / permitted · HPC / AI
Rubix Data Centers (Submer Group) · Russell, United States
Planned / permitted · Unknown
Power Company of Wyoming · United States
Planned / permitted · Unknown
Amentum · United States
Planned / permitted · Unknown
Tract · Uhland, United States
Planned / permitted · HPC / AI
xAI · Southaven, United States
Operational · Hyperscale / cloud
Vistra · Shippingport, United States
Operational · Unknown
Brookfield Renewable · Kevil, United States
Planned / permitted · HPC / AI
HW Technology Park (Hillwood Investment Properties / PowerHouse Data Centers) · Joliet, United States
Planned / permitted · HPC / AI
Mark IV Capital · Fernley, United States
Planned / permitted · Unknown
PowerHouse Data Centers · Grand Prairie, United States
Under construction · HPC / AI
Pioneer Development LLC · Yorkville, United States
Planned / permitted · HPC / AI
1–200 of 3,725