9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries

expand_lessStatus

Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll operators
corporate_fare

AirTrunk data centers

Blackstone-led consortium (with CPP Investments) · private (Blackstone and CPP Investments)
Data centers
22
Countries
6
Reported MW
613 MW
Pipeline MW
1.73 GW
Building area
51,593 m²
Est. energy / yr
4.09 TWh
Est. CO₂ / yr
2.1 Mt
Median PUE
1.32

ecoSustainability — operator-wide

Hover a value for the quote from the report
boltEnergy
Renewable share
72%
Operator-wide 2025 · electricity consumption matched with renewable energy, FY25
Renewable procurement
Solar PPAs (over 255MW under construction in Australia, incl. Mulwala Solar Farm with Google/European Energy), rooftop solar at JHB1 and SYD1, Hong Kong landfill-gas RECs, Malaysia CGPP VPPA (29.99 MWac solar with ib vogt — Malaysia's first DC renewable VPPA, 2026)
Operator-wide 2026 · company
PPAs contracted
255 MW
Operator-wide 2025 · two solar projects under construction (Australia); excludes 29.99 MWac Malaysia VPPA
Average PUE
1.32 ratio
Operator-wide 2025 · portfolio average annual operating PUE FY25
Design PUE, new builds
1.37 ratio
Operator-wide 2026 · JHB2 Johor (tropical); long-term target band 1.23-1.28
cloudEmissions
Scope 1
6 ktCO₂e
Operator-wide 2025 · FY25 diesel + refrigerant
Scope 2 location-based
319.3 ktCO₂e
Operator-wide 2025 · FY25
Scope 2 market-based
319.1 ktCO₂e
Operator-wide 2025 · FY25 (as extracted; near-identical to location-based — verify)
Scope 3
1.15 MtCO₂e
Operator-wide 2025 · sum of three main categories: capital goods 437,347 + fuel/energy 193,777 + customer electricity (location-based) 522,452
Carbon intensity
0.23 CUE (kgCO2e/kWh IT)
Operator-wide 2025 · portfolio annual operating CUE; embodied carbon ratio 2.48 tCO2e/kW IT
water_dropWater
WUE
0.89 L/kWh
Operator-wide 2025 · portfolio FY25 (net of recycled water 0.40 L/kWh)
Water target
Minimise water withdrawal and pursue alternative sources in water-stressed regions; 55% of FY25 water use from recycled supply
Operator-wide 2025 · company
recyclingWaste
Waste diverted from landfill
73%
Operator-wide 2025 · FY25
Zero-waste sites
50% of data centres certified Zero Waste (UL 2799)
Operator-wide 2025 · operational DCs
flagTargets & commitments
Net-zero target
2030
Operator-wide 2025 · Scope 1 and 2
Renewable target
100% renewable energy matching at all sites by 2030
Operator-wide 2025 · platform
RE100 member
yes
Operator-wide 2025 · company (also UNGC, TCFD supporter, 24/7 Carbon-Free Energy Compact founding partner)
ISO 14001
100% of operational data centres ISO 14001 (also ISO 45001, ISO 9001)
Operator-wide 2025 · operational DCs
Green bonds
Over A$17.75bn ESG-linked financing (FY25); plus US$2.325bn (RM9.5bn) green project financing for JHB2 Malaysia (Jul 2026)
Operator-wide 2026 · company
business_centerBusiness
Data centers
8 count
Operator-wide 2025 · operational at 30 June 2025 (SYD3, SGP2, HKG2, OSK1, JHB2 under development)
Pipeline capacity
1.9 GW
Operator-wide 2025 · total platform capacity incl. development (1.9 GW at 30 June 2025); operational MW not separated
Countries
7 count
Operator-wide 2026 · Australia, Hong Kong, India, Japan, Malaysia, Saudi Arabia, Singapore (India and Saudi Arabia new in 2026)
Employees
502 count
Operator-wide 2025 · at 30 June 2025
Headquarters
Australia
Operator-wide 2025 · Sydney-founded 2015
campaignNotable
Notable facts
GRESB 5-star (98/100); plans US$30bn and 5GW+ investment in India (Jun 2026); Malaysia platform expanded to 700MW+ with two new Johor campuses; Mulwala Solar Farm with Google and European Energy; cryogenic data centre R&D with Emergence Quantum (Sep 2026); margin savings from sustainability-linked loans fund community partnerships
Operator-wide 2026 · company

mapFootprint

publicData centers by country

dnsData centers

22 · largest first
Data centerStatusCapacityBuildingPUEEnergy (est)Networks
AirTrunk SYD3 Sydney West
Huntingwood, NSW, AU
Operational400 MW—1.32——
AirTrunk MEL2 Melbourne
Tullamarine, VIC, AU
Under construction354 MW—1.32——
AirTrunk TOK1 Tokyo East
Inzai, Chiba, JP
Operational300 MW—1.32——
AirTrunk JHB2 Johor
Iskandar Puteri, Johor, MY
Under construction270 MW—1.32——
AirTrunk HYD1 Hyderabad
Chandanvelly, Telangana, IN
Planned / permitted243 MW—1.32——
AirTrunk MEL1
Derrimut, VIC, AU
Operational185 MW8,435 m²1.151.12 TWh1
AirTrunk JHB1 Johor
Johor Bahru, Johor, MY
Operational150 MW—1.32——
AirTrunk JHB4 Johor Bahru
Johor Bahru, Johor, MY
Planned / permitted142 MW—1.32——
AirTrunk JHB3 Johor Bahru
Johor Bahru, Johor, MY
Planned / permitted138 MW—1.32——
AirTrunk SYD1
Huntingwood, NSW, AU
Operational130 MW16,099 m²1.15785.8 GWh4
AirTrunk MAA1 Chennai
Chennai (Ambattur), Tamil Nadu, IN
Planned / permitted128 MW—1.32——
AirTrunk SYD2 Sydney North
Lane Cove West, NSW, AU
Operational120 MW13,891 m²1.15725.3 GWh—
AirTrunk BOM2 Mumbai
Navi Mumbai (Mahape), Maharashtra, IN
Under construction120 MW—1.32——
AirTrunk OSK2 Osaka Downtown East
Osaka (east), Osaka, JP
Planned / permitted100 MW—1.32——
AirTrunk SGP1
Singapore, Singapore, SG
Operational78 MW4,241 m²1.25512.5 GWh1
AirTrunk SGP2 Singapore
Loyang, SG
Under construction70 MW—1.32——
AirTrunk BOM1 Mumbai
Navi Mumbai (Airoli), Maharashtra, IN
Under construction62 MW—1.32——
AirTrunk TOK2 Tokyo West
Ome, Tokyo, JP
Operational60 MW6,508 m²1.15664.9 GWh—
AirTrunk BOM3 Mumbai
Mumbai (Chandivali), Maharashtra, IN
Under construction48 MW—1.32——
AirTrunk HKG1
Hong Kong, Hong Kong, HK
Operational20 MW2,419 m²1.35141.9 GWh0
AirTrunk OSK1 Osaka West
Amagasaki, Hyogo, JP
Operational20 MW—1.32138.8 GWh—
AirTrunk HKG2 Hong Kong
Hong Kong (East New Territories), HK
Operational15 MW—1.32——
AirTrunk · Huntingwood, Australia
Operational · Colocation · PUE 1.32
AirTrunk · Tullamarine, Australia
Under construction · Colocation · PUE 1.32
AirTrunk · Inzai, Japan
Operational · Colocation · PUE 1.32 · opened 2021
AirTrunk · Iskandar Puteri, Malaysia
Under construction · Colocation · PUE 1.32
AirTrunk · Chandanvelly, India
Planned / permitted · Colocation · PUE 1.32
AirTrunk · Derrimut, Australia
Operational · Colocation · 8,435 m² · 1 networks
AirTrunk · Johor Bahru, Malaysia
Operational · Colocation · PUE 1.32 · opened 2023
AirTrunk · Johor Bahru, Malaysia
Planned / permitted · Colocation · PUE 1.32
AirTrunk · Johor Bahru, Malaysia
Planned / permitted · Colocation · PUE 1.32
AirTrunk · Huntingwood, Australia
Operational · Colocation · 16,099 m² · 4 networks
AirTrunk · Chennai (Ambattur), India
Planned / permitted · Colocation · PUE 1.32
AirTrunk · Lane Cove West, Australia
Operational · Colocation · 13,891 m² · PUE 1.15
AirTrunk · Navi Mumbai (Mahape), India
Under construction · Colocation · PUE 1.32
AirTrunk · Osaka (east), Japan
Planned / permitted · Colocation · PUE 1.32
AirTrunk · Singapore, Singapore
Operational · Enterprise · 4,241 m² · 1 networks
AirTrunk · Loyang, Singapore
Under construction · Enterprise · PUE 1.32
AirTrunk · Navi Mumbai (Airoli), India
Under construction · Colocation · PUE 1.32
AirTrunk · Ome, Japan
Operational · Colocation · 6,508 m² · PUE 1.15
AirTrunk · Mumbai (Chandivali), India
Under construction · Colocation · PUE 1.32
AirTrunk · Hong Kong, Hong Kong
Operational · Colocation · 2,419 m² · PUE 1.35
AirTrunk · Amagasaki, Japan
Operational · Colocation · PUE 1.32
AirTrunk · Hong Kong (East New Territories), Hong Kong
Operational · Colocation · PUE 1.32 · opened 2024