9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries
expand_lessStatus
Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll operators
corporate_fare
Ark Data Centres data centers
not disclosed on company site · private (Ark Data Centres Limited, Companies House 05656968); shareholders not disclosed
Data centers
5
Countries
1
Reported MW
0 MW
Pipeline MW
0 MW
Building area
29,531 m²
Est. energy / yr
398.8 GWh
Est. CO₂ / yr
86.3 kt
Median PUE
—
ecoSustainability — operator-wide
Hover a value for the quote from the reportboltEnergy
Renewable share
100 % renewable electricity (REGO-backed)
Operator-wide 2023 · all sites incl. Union Park construction
Renewable procurement
REGO-backed renewable supply procured up to 3 years ahead or via PPAs; 100% green power since 2015
Operator-wide 2023 · group
Design PUE, new builds
~1.2 PUE
Operator-wide 2023 · new designs (from >1.65 historically)
cloudEmissions
Carbon intensity
Emissions 47% below 2019 baseline (5,690 tCO2e) in 2023 while IT capacity grew from 43 MW to 109 MW
Operator-wide 2023 · emissions in control/direct influence
Refrigerant emissions
F-gas losses down 54% vs 2019 baseline
Operator-wide 2023 · group
water_dropWater
WUE
<=1.76 (CNDCP WUEmax 1.76 m3/MWh IT already achieved at Spring Park and Cody Park) L/kWh IT
Operator-wide 2023 · Spring Park and Cody Park campuses
recyclingWaste
Waste generated
245 t
Operator-wide 2023 · group (102.7 t recycled, 142.3 t energy recovery)
Waste diverted from landfill
100 % diverted from landfill
Operator-wide 2023 · group
flagTargets & commitments
Net-zero target
2030
Operator-wide 2025 · emissions in control/direct influence
Climate Neutral DC Pact
yes
Operator-wide 2025 · company
ISO 14001
ISO 14001 certified (plus ISO 9001, 22301, 27001, 45001); BREEAM across all sites
Operator-wide 2023 · company
ISO 50001
ISO 50001 certified
Operator-wide 2023 · company
Backup fuel / HVO
All standby-generator diesel replaced with HVO in 2022 (>95% fossil CO2e cut, ~17% NOx cut)
Operator-wide 2022 · all sites
business_centerBusiness
Data centers
8 operational data centres
Operator-wide 2025 · 9 locations: Spring Park, Cody Park, Meridian Park, Union Park, Longcross Park, Hilfield Park, Alliance Park (UK), Brussels
Operational capacity
109 MW IT
Operator-wide 2023 · group IT capacity
Pipeline capacity
446 MW by 2030
Operator-wide 2025 · group target (~500 MW by 2030)
Countries
2 countries
Operator-wide 2025 · UK and Belgium (Brussels)
Headquarters
United Kingdom
Operator-wide 2025 · registered in England and Wales
campaignNotable
Notable facts
Operates Crown Hosting Data Centres, a JV with the UK Cabinet Office serving government; founded 2010 (800 kW) ; collaboration with Nebius on UK AI infrastructure (June 2025); 52 EV charge points across Spring, Cody and Meridian Parks
Operator-wide 2025 · company
mapFootprint
publicData centers by country
dnsData centers
5 · largest first| Data center | Status | Capacity | Building | PUE | Energy (est) | Networks |
|---|---|---|---|---|---|---|
| Ark Data Centres - Longcross Park Chertsey, GB | Operational | 36 MW | 7,165 m² | — | 242.9 GWh | — |
| Ark Data Centres - Cody Park - A9, A101, A102, A103, A104, A105 Farnborough, Hampshire, GB | Operational | — | 8,582 m² | — | 58.3 GWh | 5 |
| Ark Data Centres Meridian Park London, GB | Operational | — | 7,369 m² | — | 50 GWh | — |
| Ark Data Centres - Spring Park - SQ17, P1, P2, P3, P4, P5 Corsham, Wiltshire, GB | Operational | — | 6,415 m² | — | 47.5 GWh | 7 |
| Ark Data Centres - Union Park Hayes, GB | Operational | — | — | — | — | 0 |
Ark Data Centres · Chertsey, United Kingdom
Ark Data Centres · Farnborough, United Kingdom
Ark Data Centres Meridian Park
≈ 6.7 MW
Ark Data Centres · London, United Kingdom
Ark Data Centres · Corsham, United Kingdom
Ark Data Centres · Hayes, United Kingdom