CyrusOne data centers

KKR and Global Infrastructure Partners (GIP, now part of BlackRock) · private (KKR + GIP; take-private March 2022 for ~US$15bn)
Data centers
69
Countries
9
Reported MW
1.2 GW
Pipeline MW
2.76 GW
Building area
73,255 m²
Est. energy / yr
10.14 TWh
Est. CO₂ / yr
3.67 Mt
Median PUE
1.46

ecoSustainability — operator-wide

Hover a value for the quote from the report
boltEnergy
Total energy
6.26 TWh
Operator-wide 2025 · company-wide (data centers), total energy consumption
Renewable share
77.8 % carbon-free electricity (renewable + nuclear)
Operator-wide 2025 · global; renewable electricity 4,496,066 MWh + nuclear 334,001 MWh; non-renewable grid 1,382,076 MWh
Renewable procurement
Physical PPAs with additionality preferred, plus EACs; 100% renewable in Europe since 2021; nuclear carbon-free electricity 334,001 MWh in 2025
Operator-wide 2025 · global
Average PUE
1.46
Operator-wide 2025 · all facilities (standard dry 1.46, nonstandard dry 1.59, nonstandard wet 1.47)
Design PUE, new builds
1.18-1.28 depending on local climate
Operator-wide 2025 · new builds
cloudEmissions
Scope 1
36.6 ktCO₂e
Operator-wide 2025 · gross, company-wide (34,023 net after offsets); incl. refrigerants
Scope 2 location-based
1.99 MtCO₂e
Operator-wide 2025 · company-wide
Scope 2 market-based
419.6 ktCO₂e
Operator-wide 2025 · company-wide
Scope 3
805.6 ktCO₂e
Operator-wide 2025 · company-wide (capital goods 528,522; fuel & energy 240,614; purchased goods 36,502)
Carbon intensity
0.1 kgCO2e/IT kWh (CUE)
Operator-wide 2025 · portfolio average
water_dropWater
WUE
0.25 L/kWh
Operator-wide 2025 · all facilities (standard dry 0.00, nonstandard wet 1.35)
Water target
Net positive water: restore 20% more water than withdrawn from local watersheds at high-water-stress facilities; 14 data centers + Dallas HQ net positive (41% of high-stress facilities); 79% of capacity uses air-cooled chillers only; water-free cooling in new builds
Operator-wide 2025 · high water-stress regions
flagTargets & commitments
Carbon-neutral target
2030
Operator-wide 2025 · net scope 1 + market-based scope 2, global; all 11 European data centers climate neutral in 2025
Renewable target
100% renewable electricity globally by 2030 (achieved in Europe since 2021)
Operator-wide 2025 · global
SBTi
validated near-term: reduce gross scope 1 + market-based scope 2 GHG 38% by 2030 from 2021 base year; 26.2% reduction achieved in 2025
Operator-wide 2025 · company-wide
Climate Neutral DC Pact
yes
Operator-wide 2025 · EU; listed 21 Jan 2021, Certified
ISO 14001
10 facilities (1,650,058 sq ft)
Operator-wide 2025 · global
ISO 50001
10 facilities (1,650,058 sq ft); all UK and Netherlands sites certified in 2025
Operator-wide 2025 · global
Backup fuel / HVO
No current HVO deployment reported; evaluating natural gas generators, fuel cells, large batteries
Operator-wide 2025 · global
business_centerBusiness
Data centers
60+ operational data centers (50+ in development)
Operator-wide 2026 · global
Operational capacity
1,000 MW (1+ GW critical load capacity)
Operator-wide 2025 · global
Countries
9 countries (report names US, Germany, UK, Netherlands, Spain, Japan; Italy groundbreaking Mar 2026)
Operator-wide 2026 · global
Headquarters
United States (Dallas, Texas)
Operator-wide 2026
campaignNotable
Controversies
Noise complaints at Chandler, Arizona campus (2011-2018); December 2019 REvil ransomware attack affected six customers
Operator-wide 2019 · US
Notable facts
Madrid MAD1 first BREEAM Outstanding in Spain; 89% of directly managed portfolio has environmental certification; 30 facilities Three Green Globes; >half of facilities run on 100% CFE and zero cooling water; Feb 2026 agreement with Constellation for data center at Freestone Energy Center (Texas gas plant); 200 MW Fort Worth campus with Eolian (Jan 2026); first Italy data center (Mar 2026); US$8.0bn loan facilities (Mar 2026)
Operator-wide 2026 · global

mapFootprint

dnsData centers

69 · largest first
Data centerStatusCapacityBuildingPUEEnergy (est)Networks
CyrusOne Freestone Energy Center Campus
Fairfield, TX, US
Under construction760 MW—1.46——
CyrusOne Sangamon County Data Center Campus
IL, US
Planned / permitted630 MW—1.46——
CyrusOne Bosque County Campus (Thad Hill Energy Center)
TX, US
Under construction400 MW—1.46——
CyrusOne Mesa Campus (Mesa Elliot Technology Park)
Mesa, AZ, US
Planned / permitted198 MW—1.46——
CyrusOne Chandler (PHX1-PHX8)
Chandler, AZ, US
Operational169 MW—1.461.3 TWh16
CyrusOne Jack County campus
TX, US
Planned / permitted144 MW—1.46——
CyrusOne Sterling NVA5-NVA7
Sterling, VA, US
Operational116 MW—1.46890.2 GWh1
CyrusOne CHI3
Aurora, IL, US
Operational109 MW—1.46836.4 GWh—
CyrusOne London LON6 (Iver Heath)
Iver Heath, GB
Under construction108 MW—1.46——
CyrusOne AI Data Center at NAS Lemoore
CA, US
Planned / permitted100 MW—1.46——
CyrusOne Houston HOU3-HOU4 (11003 Corporate Centre Dr)
Houston, TX, US
Operational84 MW—1.46644.6 GWh—
CyrusOne Frankfurt FRA6 (Sossenheim)
Frankfurt, DE
Under construction84 MW—1.46——
CyrusOne Frankfurt FRA7 (Griesheim, Westside)
Frankfurt, DE
Under construction81 MW—1.46——
CyrusOne Allen DFW3-DFW5
Allen, TX, US
Operational77 MW—1.46590.9 GWh1
CyrusOne Milan MIL1 (Segrate)
Segrate, IT
Under construction63 MW—1.46——
CyrusOne Amsterdam I
Halfweg, Noord-Holland, NL
Operational54 MW9,851 m²1.46414.4 GWh2
CyrusOne Frankfurt FRA5 (Hanau)
Hanau, DE
Under construction54 MW—1.46——
CyrusOne Milan MIL2 (Segrate)
Segrate, IT
Under construction54 MW—1.46——
CyrusOne Osaka OSK1 (Keihanna)
Keihanna, JP
Under construction48 MW—1.46——
CyrusOne Dallas (Carrollton)
Carrollton, TX, US
Operational45 MW—1.46345.3 GWh11
CyrusOne Sterling NVA1-NVA3
Sterling, VA, US
Operational44 MW—1.46337.6 GWh9
CyrusOne Durham DUR1-DUR2
Durham, NC, US
Operational40 MW—1.46306.9 GWh6
CyrusOne Sterling NVA9
Sterling, US
Operational38 MW—1.46291.6 GWh—
CyrusOne San Antonio II
San Antonio, TX, US
Operational36 MW10,098 m²1.46276.3 GWh—
CyrusOne PNW1
Quincy, WA, US
Operational36 MW—1.46276.3 GWh—
CyrusOne Lebanon CIN5 & CIN7
Lebanon, OH, US
Operational35 MW—1.46268.6 GWh0
CyrusOne San Antonio SAT5-SAT6 (14719 Omicron Dr)
San Antonio, TX, US
Operational33 MW—1.46253.2 GWh—
CyrusOne NVA8
Sterling, VA, US
Operational24 MW—1.46184.2 GWh—
CyrusOne Somerset NYM1
Somerset, NJ, US
Operational23 MW—1.46176.5 GWh3
CyrusOne Frankfurt 3
Frankfurt, DE
Operational22 MW—1.46168.8 GWh0
CyrusOne London 4
Slough, England, GB
Operational18 MW11,597 m²1.46138.1 GWh0
CyrusOne London 5
Slough, England, GB
Operational18 MW6,904 m²1.46138.1 GWh0
CyrusOne Frankfurt 2
Frankfurt, DE
Operational18 MW—1.46138.1 GWh1
CyrusOne Madrid 1
Alcobendas, ES
Operational18 MW—1.46138.1 GWh0
CyrusOne Wood Dale Campus
Wood Dale, IL, US
Under construction18 MW—1.46——
CyrusOne DUB1
Dublin, IE
Operational14 MW9,507 m²1.46107.4 GWh1
CyrusOne London 2
West Drayton, GB
Operational14 MW8,625 m²1.46107.4 GWh2
CyrusOne Dallas (Lewisville)
Lewisville, TX, US
Operational12 MW—1.4692.1 GWh5
CyrusOne Cincinnati CIN2 (7th St)
Cincinnati, OH, US
Operational11 MW—1.4684.4 GWh8
CyrusOne Frankfurt 4
Frankfurt, DE
Operational11 MW—1.4684.4 GWh0
CyrusOne NVA4
Sterling, US
Operational11 MW—1.4684.4 GWh—
CyrusOne London 3
Slough, England, GB
Operational9 MW4,636 m²1.4669.1 GWh1
CyrusOne Frankfurt 1
Frankfurt, Hessia, DE
Operational9 MW1,852 m²1.4669.1 GWh4
CyrusOne San Antonio SAT1
San Antonio, TX, US
Operational9 MW—1.4669.1 GWh4
CyrusOne London 1
Slough, GB
Operational9 MW—1.4669.1 GWh1
CyrusOne Council Bluffs OCB1
Council Bluffs, IA, US
Operational9 MW—1.4669.1 GWh—
CyrusOne Totowa
Totowa, NJ, US
Operational6 MW—1.4646 GWh3
CyrusOne Florence
Florence, KY, US
Operational5 MW—1.4638.4 GWh2
CyrusOne Paris PAR1
Wissous, FR
Operational4.5 MW—1.4634.5 GWh—
CyrusOne Norwalk
Norwalk, CT, US
Operational4 MW—1.4630.7 GWh3
CyrusOne Mason
Mason, OH, US
Operational1 MW—1.467.7 GWh0
CyrusOne SAT10 & SAT11
San Antonio, US
Under construction—10,185 m²1.46——
CyrusOne Aurora I
Aurora, IL, US
Operational——1.46138.1 GWh9
CyrusOne Austin (Met 2)
Austin, TX, US
Operational——1.46138.1 GWh6
CyrusOne Chicago (Lombard)
Lombard, IL, US
Operational——1.46138.1 GWh5
CyrusOne Cincinnati-Hamilton CIN4
Hamilton, OH, US
Operational——1.46138.1 GWh1
CyrusOne Austin (Met 3)
Austin, TX, US
Operational——1.46138.1 GWh1
CyrusOne Wappingers Falls
Wappingers Falls, NY, US
Operational——1.46138.1 GWh0
CyrusOne San Antonio IV
San Antonio, US
Operational——1.46138.1 GWh—
CyrusOne DFW7 Fort Worth
Fort Worth, US
Under construction——1.46——
CyrusOne Dugway Proving Ground Data Center
UT, US
Planned / permitted——1.46——
CyrusOne New Albany COL-1
New Albany, OH, US
Under construction——1.46——
Project Peach (CyrusOne Palmetto Data Center Campus)
Palmetto, GA, US
Planned / permitted——1.46——
CyrusOne Vint Hill Campus
Vint Hill, VA, US
Planned / permitted——1.46——
CyrusOne Yorkville Technology Campus (CHI-11)
Yorkville, IL, US
Under construction——1.46——
CyrusOne Aurora CHI2 (CME)
Aurora, IL, US
Operational——1.46——
CyrusOne Lee County NC campus (4079 Lower Moncure Rd)
Sanford, NC, US
Planned / permitted——1.46——
CyrusOne Medina County campus (SAT14, 3397 US Hwy 90 W)
Castroville, TX, US
Under construction——1.46——
CyrusOne Sulphur Springs campus (former Monticello mine)
Sulphur Springs, TX, US
Planned / permitted——1.46——
CyrusOne · Fairfield, United States
Under construction · Colocation · PUE 1.46
CyrusOne · United States
Planned / permitted · Colocation · PUE 1.46
CyrusOne · United States
Under construction · Colocation · PUE 1.46
CyrusOne · Mesa, United States
Planned / permitted · Colocation · PUE 1.46
CyrusOne · Chandler, United States
Operational · Colocation · 16 networks · PUE 1.46
CyrusOne · United States
Planned / permitted · Colocation · PUE 1.46
CyrusOne · Sterling, United States
Operational · Colocation · 1 networks · PUE 1.46
CyrusOne · Aurora, United States
Operational · Colocation · PUE 1.46
CyrusOne · Iver Heath, United Kingdom
Under construction · Colocation · PUE 1.46
CyrusOne · United States
Planned / permitted · HPC / AI · PUE 1.46
CyrusOne · Houston, United States
Operational · Colocation · PUE 1.46
CyrusOne · Frankfurt, Germany
Under construction · Colocation · PUE 1.46
CyrusOne · Frankfurt, Germany
Under construction · Colocation · PUE 1.46
CyrusOne · Allen, United States
Operational · Colocation · 1 networks · PUE 1.46
CyrusOne · Segrate, Italy
Under construction · Colocation · PUE 1.46
CyrusOne · Halfweg, Netherlands
Operational · Colocation · 9,851 m² · 2 networks
CyrusOne · Hanau, Germany
Under construction · Colocation · PUE 1.46
CyrusOne · Segrate, Italy
Under construction · Colocation · PUE 1.46
CyrusOne · Keihanna, Japan
Under construction · Colocation · PUE 1.46
CyrusOne · Carrollton, United States
Operational · Colocation · 11 networks · PUE 1.46
CyrusOne · Sterling, United States
Operational · Colocation · 9 networks · PUE 1.46
CyrusOne · Durham, United States
Operational · Colocation · 6 networks · PUE 1.46
CyrusOne · Sterling, United States
Operational · Colocation · PUE 1.46
CyrusOne · San Antonio, United States
Operational · Colocation · 10,098 m² · PUE 1.46
CyrusOne · Quincy, United States
Operational · Colocation · PUE 1.46
CyrusOne · Lebanon, United States
Operational · Colocation · PUE 1.46
CyrusOne · San Antonio, United States
Operational · Enterprise · PUE 1.46
CyrusOne · Sterling, United States
Operational · Colocation · PUE 1.46
CyrusOne · Somerset, United States
Operational · Colocation · 3 networks · PUE 1.46
CyrusOne · Frankfurt, Germany
Operational · Colocation · PUE 1.46
CyrusOne · Slough, United Kingdom
Operational · Colocation · 11,597 m² · PUE 1.46
CyrusOne · Slough, United Kingdom
Operational · Colocation · 6,904 m² · PUE 1.46
CyrusOne · Frankfurt, Germany
Operational · Colocation · 1 networks · PUE 1.46
CyrusOne · Alcobendas, Spain
Operational · Colocation · PUE 1.46
CyrusOne · Wood Dale, United States
Under construction · Colocation · PUE 1.46
CyrusOne · Dublin, Ireland
Operational · Colocation · 9,507 m² · 1 networks
CyrusOne · West Drayton, United Kingdom
Operational · Colocation · 8,625 m² · 2 networks
CyrusOne · Lewisville, United States
Operational · Colocation · 5 networks · PUE 1.46
CyrusOne · Cincinnati, United States
Operational · Colocation · 8 networks · PUE 1.46
CyrusOne · Frankfurt, Germany
Operational · Colocation · PUE 1.46
CyrusOne · Sterling, United States
Operational · Colocation · PUE 1.46
CyrusOne · Slough, United Kingdom
Operational · Colocation · 4,636 m² · 1 networks
CyrusOne · Frankfurt, Germany
Operational · Colocation · 1,852 m² · 4 networks
CyrusOne · San Antonio, United States
Operational · Colocation · 4 networks · PUE 1.46
CyrusOne · Slough, United Kingdom
Operational · Colocation · 1 networks · PUE 1.46
CyrusOne · Council Bluffs, United States
Operational · Colocation · PUE 1.46
CyrusOne · Totowa, United States
Operational · Colocation · 3 networks · PUE 1.46
CyrusOne · Florence, United States
Operational · Colocation · 2 networks · PUE 1.46
CyrusOne · Wissous, France
Operational · Colocation · PUE 1.46
CyrusOne · Norwalk, United States
Operational · Colocation · 3 networks · PUE 1.46
CyrusOne · Mason, United States
Operational · Colocation · PUE 1.46
CyrusOne · San Antonio, United States
Under construction · Colocation · 10,185 m² · PUE 1.46
CyrusOne · Aurora, United States
Operational · Colocation · 9 networks · PUE 1.46
CyrusOne · Austin, United States
Operational · Colocation · 6 networks · PUE 1.46
CyrusOne · Lombard, United States
Operational · Colocation · 5 networks · PUE 1.46
CyrusOne · Hamilton, United States
Operational · Colocation · 1 networks · PUE 1.46
CyrusOne · Austin, United States
Operational · Colocation · 1 networks · PUE 1.46
CyrusOne · Wappingers Falls, United States
Operational · Colocation · PUE 1.46
CyrusOne · San Antonio, United States
Operational · Enterprise · PUE 1.46
CyrusOne · Fort Worth, United States
Under construction · Colocation · PUE 1.46