9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries
expand_lessStatus
Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll operators
corporate_fare
CyrusOne data centers
KKR and Global Infrastructure Partners (GIP, now part of BlackRock) · private (KKR + GIP; take-private March 2022 for ~US$15bn)
Data centers
69
Countries
9
Reported MW
1.2 GW
Pipeline MW
2.76 GW
Building area
73,255 m²
Est. energy / yr
10.14 TWh
Est. CO₂ / yr
3.67 Mt
Median PUE
1.46
ecoSustainability — operator-wide
Hover a value for the quote from the reportboltEnergy
Total energy
6.26 TWh
Operator-wide 2025 · company-wide (data centers), total energy consumption
Renewable share
77.8 % carbon-free electricity (renewable + nuclear)
Operator-wide 2025 · global; renewable electricity 4,496,066 MWh + nuclear 334,001 MWh; non-renewable grid 1,382,076 MWh
Renewable procurement
Physical PPAs with additionality preferred, plus EACs; 100% renewable in Europe since 2021; nuclear carbon-free electricity 334,001 MWh in 2025
Operator-wide 2025 · global
Average PUE
1.46
Operator-wide 2025 · all facilities (standard dry 1.46, nonstandard dry 1.59, nonstandard wet 1.47)
Design PUE, new builds
1.18-1.28 depending on local climate
Operator-wide 2025 · new builds
cloudEmissions
Scope 1
36.6 ktCO₂e
Operator-wide 2025 · gross, company-wide (34,023 net after offsets); incl. refrigerants
Scope 2 location-based
1.99 MtCO₂e
Operator-wide 2025 · company-wide
Scope 2 market-based
419.6 ktCO₂e
Operator-wide 2025 · company-wide
Scope 3
805.6 ktCO₂e
Operator-wide 2025 · company-wide (capital goods 528,522; fuel & energy 240,614; purchased goods 36,502)
Carbon intensity
0.1 kgCO2e/IT kWh (CUE)
Operator-wide 2025 · portfolio average
water_dropWater
WUE
0.25 L/kWh
Operator-wide 2025 · all facilities (standard dry 0.00, nonstandard wet 1.35)
Water target
Net positive water: restore 20% more water than withdrawn from local watersheds at high-water-stress facilities; 14 data centers + Dallas HQ net positive (41% of high-stress facilities); 79% of capacity uses air-cooled chillers only; water-free cooling in new builds
Operator-wide 2025 · high water-stress regions
flagTargets & commitments
Carbon-neutral target
2030
Operator-wide 2025 · net scope 1 + market-based scope 2, global; all 11 European data centers climate neutral in 2025
Renewable target
100% renewable electricity globally by 2030 (achieved in Europe since 2021)
Operator-wide 2025 · global
SBTi
validated near-term: reduce gross scope 1 + market-based scope 2 GHG 38% by 2030 from 2021 base year; 26.2% reduction achieved in 2025
Operator-wide 2025 · company-wide
Climate Neutral DC Pact
yes
Operator-wide 2025 · EU; listed 21 Jan 2021, Certified
ISO 14001
10 facilities (1,650,058 sq ft)
Operator-wide 2025 · global
ISO 50001
10 facilities (1,650,058 sq ft); all UK and Netherlands sites certified in 2025
Operator-wide 2025 · global
Backup fuel / HVO
No current HVO deployment reported; evaluating natural gas generators, fuel cells, large batteries
Operator-wide 2025 · global
business_centerBusiness
Data centers
60+ operational data centers (50+ in development)
Operator-wide 2026 · global
Operational capacity
1,000 MW (1+ GW critical load capacity)
Operator-wide 2025 · global
Countries
9 countries (report names US, Germany, UK, Netherlands, Spain, Japan; Italy groundbreaking Mar 2026)
Operator-wide 2026 · global
Headquarters
United States (Dallas, Texas)
Operator-wide 2026
campaignNotable
Controversies
Noise complaints at Chandler, Arizona campus (2011-2018); December 2019 REvil ransomware attack affected six customers
Operator-wide 2019 · US
Notable facts
Madrid MAD1 first BREEAM Outstanding in Spain; 89% of directly managed portfolio has environmental certification; 30 facilities Three Green Globes; >half of facilities run on 100% CFE and zero cooling water; Feb 2026 agreement with Constellation for data center at Freestone Energy Center (Texas gas plant); 200 MW Fort Worth campus with Eolian (Jan 2026); first Italy data center (Mar 2026); US$8.0bn loan facilities (Mar 2026)
Operator-wide 2026 · global
mapFootprint
publicData centers by country
dnsData centers
69 · largest first| Data center | Status | Capacity | Building | PUE | Energy (est) | Networks |
|---|---|---|---|---|---|---|
| CyrusOne Freestone Energy Center Campus Fairfield, TX, US | Under construction | 760 MW | — | 1.46 | — | — |
| CyrusOne Sangamon County Data Center Campus IL, US | Planned / permitted | 630 MW | — | 1.46 | — | — |
| CyrusOne Bosque County Campus (Thad Hill Energy Center) TX, US | Under construction | 400 MW | — | 1.46 | — | — |
| CyrusOne Mesa Campus (Mesa Elliot Technology Park) Mesa, AZ, US | Planned / permitted | 198 MW | — | 1.46 | — | — |
| CyrusOne Chandler (PHX1-PHX8) Chandler, AZ, US | Operational | 169 MW | — | 1.46 | 1.3 TWh | 16 |
| CyrusOne Jack County campus TX, US | Planned / permitted | 144 MW | — | 1.46 | — | — |
| CyrusOne Sterling NVA5-NVA7 Sterling, VA, US | Operational | 116 MW | — | 1.46 | 890.2 GWh | 1 |
| CyrusOne CHI3 Aurora, IL, US | Operational | 109 MW | — | 1.46 | 836.4 GWh | — |
| CyrusOne London LON6 (Iver Heath) Iver Heath, GB | Under construction | 108 MW | — | 1.46 | — | — |
| CyrusOne AI Data Center at NAS Lemoore CA, US | Planned / permitted | 100 MW | — | 1.46 | — | — |
| CyrusOne Houston HOU3-HOU4 (11003 Corporate Centre Dr) Houston, TX, US | Operational | 84 MW | — | 1.46 | 644.6 GWh | — |
| CyrusOne Frankfurt FRA6 (Sossenheim) Frankfurt, DE | Under construction | 84 MW | — | 1.46 | — | — |
| CyrusOne Frankfurt FRA7 (Griesheim, Westside) Frankfurt, DE | Under construction | 81 MW | — | 1.46 | — | — |
| CyrusOne Allen DFW3-DFW5 Allen, TX, US | Operational | 77 MW | — | 1.46 | 590.9 GWh | 1 |
| CyrusOne Milan MIL1 (Segrate) Segrate, IT | Under construction | 63 MW | — | 1.46 | — | — |
| CyrusOne Amsterdam I Halfweg, Noord-Holland, NL | Operational | 54 MW | 9,851 m² | 1.46 | 414.4 GWh | 2 |
| CyrusOne Frankfurt FRA5 (Hanau) Hanau, DE | Under construction | 54 MW | — | 1.46 | — | — |
| CyrusOne Milan MIL2 (Segrate) Segrate, IT | Under construction | 54 MW | — | 1.46 | — | — |
| CyrusOne Osaka OSK1 (Keihanna) Keihanna, JP | Under construction | 48 MW | — | 1.46 | — | — |
| CyrusOne Dallas (Carrollton) Carrollton, TX, US | Operational | 45 MW | — | 1.46 | 345.3 GWh | 11 |
| CyrusOne Sterling NVA1-NVA3 Sterling, VA, US | Operational | 44 MW | — | 1.46 | 337.6 GWh | 9 |
| CyrusOne Durham DUR1-DUR2 Durham, NC, US | Operational | 40 MW | — | 1.46 | 306.9 GWh | 6 |
| CyrusOne Sterling NVA9 Sterling, US | Operational | 38 MW | — | 1.46 | 291.6 GWh | — |
| CyrusOne San Antonio II San Antonio, TX, US | Operational | 36 MW | 10,098 m² | 1.46 | 276.3 GWh | — |
| CyrusOne PNW1 Quincy, WA, US | Operational | 36 MW | — | 1.46 | 276.3 GWh | — |
| CyrusOne Lebanon CIN5 & CIN7 Lebanon, OH, US | Operational | 35 MW | — | 1.46 | 268.6 GWh | 0 |
| CyrusOne San Antonio SAT5-SAT6 (14719 Omicron Dr) San Antonio, TX, US | Operational | 33 MW | — | 1.46 | 253.2 GWh | — |
| CyrusOne NVA8 Sterling, VA, US | Operational | 24 MW | — | 1.46 | 184.2 GWh | — |
| CyrusOne Somerset NYM1 Somerset, NJ, US | Operational | 23 MW | — | 1.46 | 176.5 GWh | 3 |
| CyrusOne Frankfurt 3 Frankfurt, DE | Operational | 22 MW | — | 1.46 | 168.8 GWh | 0 |
| CyrusOne London 4 Slough, England, GB | Operational | 18 MW | 11,597 m² | 1.46 | 138.1 GWh | 0 |
| CyrusOne London 5 Slough, England, GB | Operational | 18 MW | 6,904 m² | 1.46 | 138.1 GWh | 0 |
| CyrusOne Frankfurt 2 Frankfurt, DE | Operational | 18 MW | — | 1.46 | 138.1 GWh | 1 |
| CyrusOne Madrid 1 Alcobendas, ES | Operational | 18 MW | — | 1.46 | 138.1 GWh | 0 |
| CyrusOne Wood Dale Campus Wood Dale, IL, US | Under construction | 18 MW | — | 1.46 | — | — |
| CyrusOne DUB1 Dublin, IE | Operational | 14 MW | 9,507 m² | 1.46 | 107.4 GWh | 1 |
| CyrusOne London 2 West Drayton, GB | Operational | 14 MW | 8,625 m² | 1.46 | 107.4 GWh | 2 |
| CyrusOne Dallas (Lewisville) Lewisville, TX, US | Operational | 12 MW | — | 1.46 | 92.1 GWh | 5 |
| CyrusOne Cincinnati CIN2 (7th St) Cincinnati, OH, US | Operational | 11 MW | — | 1.46 | 84.4 GWh | 8 |
| CyrusOne Frankfurt 4 Frankfurt, DE | Operational | 11 MW | — | 1.46 | 84.4 GWh | 0 |
| CyrusOne NVA4 Sterling, US | Operational | 11 MW | — | 1.46 | 84.4 GWh | — |
| CyrusOne London 3 Slough, England, GB | Operational | 9 MW | 4,636 m² | 1.46 | 69.1 GWh | 1 |
| CyrusOne Frankfurt 1 Frankfurt, Hessia, DE | Operational | 9 MW | 1,852 m² | 1.46 | 69.1 GWh | 4 |
| CyrusOne San Antonio SAT1 San Antonio, TX, US | Operational | 9 MW | — | 1.46 | 69.1 GWh | 4 |
| CyrusOne London 1 Slough, GB | Operational | 9 MW | — | 1.46 | 69.1 GWh | 1 |
| CyrusOne Council Bluffs OCB1 Council Bluffs, IA, US | Operational | 9 MW | — | 1.46 | 69.1 GWh | — |
| CyrusOne Totowa Totowa, NJ, US | Operational | 6 MW | — | 1.46 | 46 GWh | 3 |
| CyrusOne Florence Florence, KY, US | Operational | 5 MW | — | 1.46 | 38.4 GWh | 2 |
| CyrusOne Paris PAR1 Wissous, FR | Operational | 4.5 MW | — | 1.46 | 34.5 GWh | — |
| CyrusOne Norwalk Norwalk, CT, US | Operational | 4 MW | — | 1.46 | 30.7 GWh | 3 |
| CyrusOne Mason Mason, OH, US | Operational | 1 MW | — | 1.46 | 7.7 GWh | 0 |
| CyrusOne SAT10 & SAT11 San Antonio, US | Under construction | — | 10,185 m² | 1.46 | — | — |
| CyrusOne Aurora I Aurora, IL, US | Operational | — | — | 1.46 | 138.1 GWh | 9 |
| CyrusOne Austin (Met 2) Austin, TX, US | Operational | — | — | 1.46 | 138.1 GWh | 6 |
| CyrusOne Chicago (Lombard) Lombard, IL, US | Operational | — | — | 1.46 | 138.1 GWh | 5 |
| CyrusOne Cincinnati-Hamilton CIN4 Hamilton, OH, US | Operational | — | — | 1.46 | 138.1 GWh | 1 |
| CyrusOne Austin (Met 3) Austin, TX, US | Operational | — | — | 1.46 | 138.1 GWh | 1 |
| CyrusOne Wappingers Falls Wappingers Falls, NY, US | Operational | — | — | 1.46 | 138.1 GWh | 0 |
| CyrusOne San Antonio IV San Antonio, US | Operational | — | — | 1.46 | 138.1 GWh | — |
| CyrusOne DFW7 Fort Worth Fort Worth, US | Under construction | — | — | 1.46 | — | — |
| CyrusOne Dugway Proving Ground Data Center UT, US | Planned / permitted | — | — | 1.46 | — | — |
| CyrusOne New Albany COL-1 New Albany, OH, US | Under construction | — | — | 1.46 | — | — |
| Project Peach (CyrusOne Palmetto Data Center Campus) Palmetto, GA, US | Planned / permitted | — | — | 1.46 | — | — |
| CyrusOne Vint Hill Campus Vint Hill, VA, US | Planned / permitted | — | — | 1.46 | — | — |
| CyrusOne Yorkville Technology Campus (CHI-11) Yorkville, IL, US | Under construction | — | — | 1.46 | — | — |
| CyrusOne Aurora CHI2 (CME) Aurora, IL, US | Operational | — | — | 1.46 | — | — |
| CyrusOne Lee County NC campus (4079 Lower Moncure Rd) Sanford, NC, US | Planned / permitted | — | — | 1.46 | — | — |
| CyrusOne Medina County campus (SAT14, 3397 US Hwy 90 W) Castroville, TX, US | Under construction | — | — | 1.46 | — | — |
| CyrusOne Sulphur Springs campus (former Monticello mine) Sulphur Springs, TX, US | Planned / permitted | — | — | 1.46 | — | — |
CyrusOne · Fairfield, United States
CyrusOne · United States
CyrusOne · United States
CyrusOne · Mesa, United States
CyrusOne · Chandler, United States
CyrusOne · United States
CyrusOne · Sterling, United States
CyrusOne CHI3
109 MW
CyrusOne · Aurora, United States
CyrusOne · Iver Heath, United Kingdom
CyrusOne · United States
CyrusOne · Houston, United States
CyrusOne · Frankfurt, Germany
CyrusOne · Frankfurt, Germany
CyrusOne · Allen, United States
CyrusOne · Segrate, Italy
CyrusOne Amsterdam I
54 MW
CyrusOne · Halfweg, Netherlands
CyrusOne · Hanau, Germany
CyrusOne · Segrate, Italy
CyrusOne · Keihanna, Japan
CyrusOne · Carrollton, United States
CyrusOne · Sterling, United States
CyrusOne · Durham, United States
CyrusOne · Sterling, United States
CyrusOne · San Antonio, United States
CyrusOne PNW1
36 MW
CyrusOne · Quincy, United States
CyrusOne · Lebanon, United States
CyrusOne · San Antonio, United States
CyrusOne NVA8
24 MW
CyrusOne · Sterling, United States
CyrusOne · Somerset, United States
CyrusOne Frankfurt 3
22 MW
CyrusOne · Frankfurt, Germany
CyrusOne London 4
18 MW
CyrusOne · Slough, United Kingdom
CyrusOne London 5
18 MW
CyrusOne · Slough, United Kingdom
CyrusOne Frankfurt 2
18 MW
CyrusOne · Frankfurt, Germany
CyrusOne Madrid 1
18 MW
CyrusOne · Alcobendas, Spain
CyrusOne · Wood Dale, United States
CyrusOne DUB1
14 MW
CyrusOne · Dublin, Ireland
CyrusOne London 2
14 MW
CyrusOne · West Drayton, United Kingdom
CyrusOne · Lewisville, United States
CyrusOne · Cincinnati, United States
CyrusOne Frankfurt 4
11 MW
CyrusOne · Frankfurt, Germany
CyrusOne NVA4
11 MW
CyrusOne · Sterling, United States
CyrusOne · Slough, United Kingdom
CyrusOne · Frankfurt, Germany
CyrusOne · San Antonio, United States
CyrusOne · Slough, United Kingdom
CyrusOne · Council Bluffs, United States
CyrusOne Totowa
6 MW
CyrusOne · Totowa, United States
CyrusOne · Florence, United States
CyrusOne Paris PAR1
4.5 MW
CyrusOne · Wissous, France
CyrusOne Norwalk
4 MW
CyrusOne · Norwalk, United States
CyrusOne Mason
1 MW
CyrusOne · Mason, United States
CyrusOne SAT10 & SAT11
≈ 9.3 MW
CyrusOne · San Antonio, United States
CyrusOne · Aurora, United States
CyrusOne · Austin, United States
CyrusOne · Lombard, United States
CyrusOne · Hamilton, United States
CyrusOne · Austin, United States
CyrusOne · Wappingers Falls, United States
CyrusOne · San Antonio, United States
CyrusOne · Fort Worth, United States