9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries

expand_lessStatus

Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll operators
corporate_fare

Global Switch data centers

Elegant Jubilee Limited (51%), Strategic IDC Limited (24.99%), Tough Expert Limited (24.01%); controlling shareholder Jiangsu Shagang Group · private (Chinese-controlled; Jiangsu Shagang Group controlling shareholder); bonds listed on Euronext
Data centers
17
Countries
9
Reported MW
442 MW
Pipeline MW
0 MW
Building area
62,675 m²
Est. energy / yr
3.6 TWh
Est. CO₂ / yr
663.4 kt
Median PUE
1.2

ecoSustainability — operator-wide

Hover a value for the quote from the report
boltEnergy
Renewable share
88%
Operator-wide 2025 · renewables-backed electricity procured globally (100% in Europe and Singapore); annual report states 88.0%
Average PUE
8% year-on-year improvement of group-wide operational average PUE (absolute value not extracted)
Operator-wide 2025 · group operational average
Design PUE, new builds
annualised PUE <1.2 in Europe and <1.4 in Asia-Pacific for new developments
Operator-wide 2025 · new developments
cloudEmissions
Scope 2 market-based
Scope 1+2 combined market-based: 71,227 tCO2e (2023 baseline 48,533; 2030 target 28,149)
Operator-wide 2025 · group
Scope 3
35.7 ktCO₂e
Operator-wide 2025 · Scope 3 Category 3 (fuel- and energy-related activities) only, market-based (2023 baseline 16,151)
water_dropWater
WUE
2 L/kWh
Operator-wide 2025 · Paris data centre only (reduced from 3.2)
flagTargets & commitments
Renewable target
Purchase 100% renewable electricity for Scope 2 by 2030
Operator-wide 2025 · global
SBTi
validated (SBTi-approved): reduce Scope 1+2 market-based and Scope 3 Cat.3 (FERA) emissions 42% by 2030 from 2023; 74% of capital-goods suppliers to set SBTs by 2029
Operator-wide 2025 · group
Climate Neutral DC Pact
yes
Operator-wide 2025 · EU; signed 30 Jun 2023
ISO 14001
ISO 14001 certified (with ISO 9001, 45001, 27001) - group-wide
Operator-wide 2025 · global
ISO 50001
ISO 50001 certified - group-wide
Operator-wide 2025 · global
Heat-reuse projects
Heat recovery agreement at Paris data centre - captured heat reused by local community infrastructure
Operator-wide 2025 · Paris
Backup fuel / HVO
Transitioning backup generation to HVO as near-term step
Operator-wide 2025 · group
Green bonds
700 million EUR green bond (2020, 1.375%, due 2030) EUR
Operator-wide 2025 · outstanding
business_centerBusiness
Data centers
8 data centres
Operator-wide 2025 · 7 cities: Amsterdam, Frankfurt, Hong Kong, London (2), Madrid, Paris, Singapore; gross floor area 410,499 m2
Operational capacity
252 MW saleable IT capacity
Operator-wide 2025 · group; 488 MVA utility power; 38.8 MW new signings in 2025
Countries
Netherlands, Germany, UK, Spain, France, Hong Kong SAR, Singapore; Johor (Malaysia) listed as location
Operator-wide 2026 · global
Revenue
466.2 million GBP GBP
Operator-wide 2025 · group (+6.8% vs 436.6m in 2024)
Headquarters
United Kingdom (London)
Operator-wide 2025
campaignNotable
Notable facts
C-suite and key operations remuneration linked to PUE KPIs; ~12% of GFA (47,696 m2) green-building certified; limited assurance on 2025 Scope 1-3; Australian business divested 2024; Scope 1+2 market-based emissions rose from 48,533 t (2023) to 71,227 t (2025) despite SBTi target
Operator-wide 2025 · group

dnsData centers

17 · largest first
Data centerStatusCapacityBuildingPUEEnergy (est)Networks
Global Switch London East
London, GB
Operational87 MW6,235 m²1.2582.7 GWh31
Global Switch Hong Kong
Tseung Kwan O, HK
Operational71 MW1,067 m²—529.9 GWh9
Global Switch London South
London, GB
Operational70 MW——522.4 GWh—
Global Switch Madrid 2
Madrid, Madrid, ES
Operational56 MW——418 GWh—
Global Switch Amsterdam East
Amsterdam, North Holland, NL
Operational32 MW30,371 m²—206.3 GWh98
Global Switch Paris North
Clichy, Ile-de-France, FR
Operational24 MW——179.1 GWh—
Global Switch Singapore Woodlands
Singapore, SG
Operational22 MW——164.2 GWh—
Global Switch London North
London, GB
Operational18 MW7,507 m²—153 GWh32
Global Switch Paris South
Clichy, Ile-de-France, FR
Operational18 MW——134.3 GWh—
Global Switch Singapore Tai Seng
Singapore, SG
Operational17 MW4,630 m²—125.8 GWh142
Global Switch Paris West
Clichy, Ile-de-France, FR
Operational17 MW——126.9 GWh—
Global Switch Frankfurt South
Frankfurt, Hessen, DE
Operational10 MW——74.6 GWh—
Global Switch Madrid
Madrid, ES
Operational—5,149 m²—148.9 GWh19
Global Switch Paris
Clichy, FR
Operational—4,782 m²—32.5 GWh31
Global Switch Frankfurt
Frankfurt, DE
Operational—2,934 m²—200.7 GWh17
Global Switch Johor
Kulai, Johor, MY
Planned / permitted—————
Global Switch Bangkok
Bangkok, TH
Planned / permitted—————
Global Switch · London, United Kingdom
Operational · Colocation · 6,235 m² · 31 networks
Global Switch · Tseung Kwan O, Hong Kong
Operational · Enterprise · 1,067 m² · 9 networks
Global Switch · London, United Kingdom
Operational · Enterprise
Global Switch · Madrid, Spain
Operational · Colocation
Global Switch · Amsterdam, Netherlands
Operational · Colocation · 30,371 m² · 98 networks
Global Switch · Clichy, France
Operational · Colocation
Global Switch · Singapore, Singapore
Operational · Enterprise
Global Switch · London, United Kingdom
Operational · Colocation · 7,507 m² · 32 networks
Global Switch · Clichy, France
Operational · Colocation
Global Switch · Singapore, Singapore
Operational · Enterprise · 4,630 m² · 142 networks
Global Switch · Clichy, France
Operational · Colocation
Global Switch · Frankfurt, Germany
Operational · Colocation
Global Switch · Madrid, Spain
Operational · Colocation · 5,149 m² · 19 networks
Global Switch · Clichy, France
Operational · Colocation · 4,782 m² · 31 networks
Global Switch · Frankfurt, Germany
Operational · Colocation · 2,934 m² · 17 networks
Global Switch · Kulai, Malaysia
Planned / permitted · Colocation
Global Switch · Bangkok, Thailand
Planned / permitted · Colocation