9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries

expand_lessStatus

Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll operators
corporate_fare

Green Mountain data centers

Azrieli Group (100%, per 2023 report) · private subsidiary of Azrieli Group (listed TASE:AZRG)
Data centers
6
Countries
1
Reported MW
22 MW
Pipeline MW
72 MW
Building area
7,971 m²
Est. energy / yr
182.8 GWh
Est. CO₂ / yr
5.4 kt
Median PUE
1.24

ecoSustainability — operator-wide

Hover a value for the quote from the report
boltEnergy
Total energy
168,088 MWh (sum of 153,481 renewable + 14,607 non-renewable as reported)
Operator-wide 2025 · Norway sites; derived sum of two reported lines
Data-center electricity
153,481 MWh renewable electricity/heat/cooling purchased
Operator-wide 2025 · Green Mountain Nordics (Norway sites)
Renewable share
100 % electricity (GoO-backed hydropower)
Operator-wide 2025 · all sites
Renewable procurement
Norwegian hydropower backed by Guarantees of Origin
Operator-wide 2025 · group
Average PUE
1.24 PUE
Operator-wide 2023 · Norway sites average (UK LON1-East 1.88); target <1.2
cloudEmissions
Scope 2 market-based
0 net (market-based climate neutrality for scopes 1 and 2 maintained) tCO₂e
Operator-wide 2025 · Norway
Carbon intensity
4.9 g CO2/kWh IT load
Operator-wide 2025 · Norway operations
Refrigerant emissions
F-gas leakage down 88.5% (69.8 kg -> 8 kg refrigerant, Norway) in 2023; further significant reduction 2025; target zero
Operator-wide 2023 · Norway
water_dropWater
Water withdrawal
54,830 m3 (54.83 megalitres freshwater)
Operator-wide 2023 · group (34.37 ML in 2022)
WUE
0.62 L/kWh IT
Operator-wide 2023 · Norway (UK LON1-East 2.192); target <0.50
Sites in water-stressed areas
0 % (Norway operations in non-water-stress areas)
Operator-wide 2023 · Norway
recyclingWaste
Waste generated
125 t
Operator-wide 2023 · Norway (107 t sorted)
Waste diverted from landfill
86 % sorted/recycled (landfill 2.2%)
Operator-wide 2023 · Norway; UK 100% diverted
flagTargets & commitments
Carbon-neutral target
achieved (scope 1+2 market-based carbon neutral, Norway)
Operator-wide 2025 · Norway
Climate Neutral DC Pact
yes
Operator-wide 2023 · company
ISO 14001
ISO 14001 certified (also ISO 9001, 27001, 45001)
Operator-wide 2025 · company
ISO 50001
ISO 50001 certified energy management system
Operator-wide 2025 · company
Heat-reuse projects
First official heat reuse project live Q4 2025 delivering heat to neighbouring fish farm; earlier pilots with lobster and trout aquaculture; exploring district heating & greenhouses; TEL-Rjukan heat reuse
Operator-wide 2025 · Norway
Backup fuel / HVO
Target: demonstrate large-scale fossil-free backup power by 2030 (diesel still used)
Operator-wide 2025 · group
business_centerBusiness
Data centers
6 operational (+1 under construction)
Operator-wide 2025 · SVG-Rennesøy, TEL-Rjukan, OSL-Enebakk, OSL-Hamar, SVG-Undheim, LON-East; FRA-Mainz under construction
Operational capacity
308 MW (Norway 4 sites: Rennesøy 25, Rjukan 40, Enebakk 93, Hamar 150)
Operator-wide 2025 · Green Mountain Nordics
Pipeline capacity
54 MW
Operator-wide 2025 · FRA-Mainz (50/50 JV with KMW), under construction
Countries
3 countries
Operator-wide 2025 · Norway, UK, Germany
Employees
207 employees
Operator-wide 2025 · group (2023: 131 Norway + 18 UK)
Headquarters
Norway
Operator-wide 2025 · Green Mountain Nordics; parent entity Green Mountain Global Ltd (UK)
campaignNotable
Notable facts
LON1-East (UK) 40 MW; energy efficiency measures saved 178,224 kWh in 2025; all company cars 100% electric target
Operator-wide 2025 · company

mapFootprint

publicData centers by country

dnsData centers

6 · largest first
Data centerStatusCapacityBuildingPUEEnergy (est)Networks
Green Mountain data center (Norway)
NO
Operational150 MW4,356 m²1.2425.8 GWh—
DC3-Oslo
Ytre Enebakk, NO
Operational22 MW3,254 m²1.24140.1 GWh2
DC2-Telemark
Rjukan, NO
Operational—361 m²1.242.1 GWh1
DC1-Stavanger
Rennesøy, NO
Operational——1.245.5 GWh11
Green Mountain DC1 (Rjukan)
Rjukan, NO
Operational——1.24——
Green Mountain Ytre Enebakk
NO
Operational——1.249.2 GWh—
Green Mountain · Norway
Operational · Colocation · 4,356 m² · PUE 1.24
Green Mountain · Ytre Enebakk, Norway
Operational · Colocation · 3,254 m² · 2 networks
DC2-Telemark
≈ 0.3 MW
Green Mountain · Rjukan, Norway
Operational · Colocation · 361 m² · 1 networks
Green Mountain · Rennesøy, Norway
Operational · Colocation · 11 networks · PUE 1.24
Green Mountain · Rjukan, Norway
Operational · Colocation · PUE 1.24 · opened 2015
Green Mountain · Norway
Operational · Enterprise · PUE 1.24