9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries
expand_lessStatus
Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll operators
corporate_fare
ITENOS (Deutsche Telekom) data centers
Deutsche Telekom AG (via T-Data since 2000) · subsidiary of Deutsche Telekom AG (listed XETRA:DTE)
Data centers
12
Countries
2
Reported MW
0 MW
Pipeline MW
0 MW
Building area
14,776 m²
Est. energy / yr
150.2 GWh
Est. CO₂ / yr
49 kt
Median PUE
1.53
ecoSustainability — operator-wide
Hover a value for the quote from the reportboltEnergy
Total energy
11,957,000 MWh (reported 11,957 GWh)
Operator-wide 2025 · Deutsche Telekom group-wide (Germany 2,184 GWh)
Renewable share
100 % (green electricity)
Operator-wide 2025 · ITENOS data centres, since 2016
Renewable procurement
DT group: 100% renewable electricity; 32% of electricity via PPAs (Germany 33%); self-generation 13.9 GWh in 2025
Operator-wide 2025 · Deutsche Telekom group
Average PUE
1.53 PUE
Operator-wide 2025 · T-Systems data centres, global and Germany average (DT group DCs, not ITENOS-specific)
Design PUE, new builds
<1.2 PUE
Operator-wide 2025 · DT Industrial AI Factory Munich
cloudEmissions
Scope 1
223.8 ktCO₂e
Operator-wide 2025 · Deutsche Telekom group
Scope 2 market-based
16.4 ktCO₂e
Operator-wide 2025 · Deutsche Telekom group
Carbon intensity
73 tCO2e/EUR m revenue (market-based); 105 (location-based); energy intensity 48 kWh/TB (from 57 in 2024)
Operator-wide 2025 · Deutsche Telekom group
flagTargets & commitments
Net-zero target
2040
Operator-wide 2025 · DT group, entire value chain (>=90% reduction vs 2020)
Carbon-neutral target
ITENOS: Scope 1 & 2 emissions neutralised; fleet emissions compensated via certificates (no year stated)
Operator-wide 2025 · ITENOS
SBTi
validated ('confirmed' by SBTi): -55% Scopes 1-3 absolute by 2030 vs 2020; net zero 2040
Operator-wide 2025 · DT group
CDP climate score
A
Operator-wide 2025 · DT group (Climate A list; Supplier Engagement Leader)
ISO 50001
ITENOS energy management system certified ISO 50001:2018
Operator-wide 2025 · ITENOS
Heat-reuse projects
DT Berlin Winterfeldtstraße: 732 MWh waste heat delivered for residential heating
Operator-wide 2025 · Deutsche Telekom site
business_centerBusiness
Data centers
8 data centre locations (ITENOS)
Operator-wide 2025 · Frankfurt, Düsseldorf, Hamburg, Leverkusen, Stuttgart, Berlin, Bonn, Munich
Countries
1 countries
Operator-wide 2025 · Germany (ITENOS)
Employees
250 employees (approx.)
Operator-wide 2025 · ITENOS
Headquarters
Germany
Operator-wide 2025 · Bonn
campaignNotable
Notable facts
ITENOS Frankfurt Kleyerstraße is its largest DC (>14,000 m2); certified EN 50600 TÜV Level 3; founded 1993
Operator-wide 2025 · ITENOS
mapFootprint
publicData centers by country
dnsData centers
12 · largest first| Data center | Status | Capacity | Building | PUE | Energy (est) | Networks |
|---|---|---|---|---|---|---|
| ITENOS Düsseldorf (DUS2) Hilden, DE | Operational | — | 2,451 m² | 1.53 | 26.9 GWh | 1 |
| ITENOS Hamburg (HAM1) Hamburg, Hamburg, DE | Operational | — | 2,267 m² | 1.53 | 7.2 GWh | 2 |
| ITENOS Leverkusen (LEV1) Leverkusen, Nordrhein-Westfalen, DE | Operational | — | 2,164 m² | 1.53 | 5.3 GWh | 1 |
| ITENOS Düsseldorf (DUS1) Düsseldorf, NRW, DE | Operational | — | 1,972 m² | 1.53 | 10.1 GWh | 1 |
| T-Systems Magdeburg Magdeburg, DE | Operational | — | 1,738 m² | 1.53 | 38.2 GWh | — |
| ITENOS Hamburg (HAM2) Ahrensburg, Schleswig-Holstein, DE | Operational | — | 1,470 m² | 1.53 | 10.8 GWh | 1 |
| ITENOS Frankfurt (FRA2) Frankfurt, Hessen, DE | Operational | — | 1,390 m² | 1.53 | 10.2 GWh | 2 |
| ITENOS Frankfurt (FRA1) Frankfurt, Hesse, DE | Operational | — | 1,123 m² | 1.53 | 8.2 GWh | 65 |
| ITENOS Stuttgart (STR3) Stuttgart, Baden-Württemberg, DE | Operational | — | 201 m² | 1.53 | 2.9 GWh | 1 |
| Dataplex Budapest Budapest, HU | Operational | — | — | 1.53 | 10.1 GWh | 66 |
| ITENOS Stuttgart (STR1) Stuttgart, Baden-Württemberg, DE | Operational | — | — | 1.53 | 10.1 GWh | 1 |
| ITENOS Stuttgart (STR2) Böblingen, Baden-Württemberg, DE | Operational | — | — | 1.53 | 10.1 GWh | 1 |
ITENOS Düsseldorf (DUS2)
≈ 3.4 MW
ITENOS (Deutsche Telekom) · Hilden, Germany
ITENOS Hamburg (HAM1)
≈ 0.9 MW
ITENOS (Deutsche Telekom) · Hamburg, Germany
ITENOS Leverkusen (LEV1)
≈ 0.7 MW
ITENOS (Deutsche Telekom) · Leverkusen, Germany
ITENOS (Deutsche Telekom) · Düsseldorf, Germany
T-Systems Magdeburg
≈ 4.7 MW
ITENOS (Deutsche Telekom) · Magdeburg, Germany
ITENOS Hamburg (HAM2)
≈ 1.3 MW
ITENOS (Deutsche Telekom) · Ahrensburg, Germany
ITENOS Frankfurt (FRA2)
≈ 1.3 MW
ITENOS (Deutsche Telekom) · Frankfurt, Germany
ITENOS Frankfurt (FRA1)
≈ 1 MW
ITENOS (Deutsche Telekom) · Frankfurt, Germany
ITENOS Stuttgart (STR3)
≈ 0.4 MW
ITENOS (Deutsche Telekom) · Stuttgart, Germany
ITENOS (Deutsche Telekom) · Budapest, Hungary
ITENOS (Deutsche Telekom) · Stuttgart, Germany
ITENOS (Deutsche Telekom) · Böblingen, Germany