9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries
expand_lessStatus
Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll operators
corporate_fare
Kao Data data centers
Investors: Infratil, Legal & General Capital, Goldacre (Noé Group) · private (Infratil / L&G Capital / Goldacre; stakes not disclosed)
Data centers
3
Countries
1
Reported MW
51 MW
Pipeline MW
0 MW
Building area
27,967 m²
Est. energy / yr
368.7 GWh
Est. CO₂ / yr
79.8 kt
Median PUE
1.25
ecoSustainability — operator-wide
Hover a value for the quote from the reportboltEnergy
Total energy
123 GWh
Operator-wide 2025 · company-wide, FY2024-25
Renewable share
100 % (REGO-certified)
Operator-wide 2025 · all data centres, FY2024-25
Renewable procurement
REGO-backed renewable supply; power sourced from Dogger Bank offshore wind farm from 1 April 2025
Operator-wide 2025 · group
Average PUE
1.53 PUE
Operator-wide 2025 · facilities average across estate FY2024-25 (target 1.5)
Best PUE
1.2 PUE (SLA-backed, as low as)
Operator-wide 2025 · data halls
Design PUE, new builds
1.3 PUE
Operator-wide 2025 · new data centres at full capacity (CNDCP target)
cloudEmissions
Scope 1
478 tCO₂e
Operator-wide 2025 · FY2024-25 (61.45 prior year)
Scope 2 location-based
8.6 ktCO₂e
Operator-wide 2025 · FY2024-25
Scope 2 market-based
0 tCO₂e
Operator-wide 2025 · FY2024-25 (REGOs)
Scope 3
2,240.67 tCO2e (market-based; location-based 18,811.63)
Operator-wide 2025 · FY2024-25
Carbon intensity
CUE 0 (market-based); energy intensity 0.0019 MWh/revenue
Operator-wide 2025 · FY2024-25
water_dropWater
Water consumption
15,669 m3 (15,669,000 litres potable)
Operator-wide 2025 · company-wide FY2024-25 (18,204 m3 prior year)
WUE
0.26 L/kWh
Operator-wide 2025 · portfolio FY2024-25 (0.34 in FY2023-24)
recyclingWaste
Waste generated
68 t
Operator-wide 2025 · FY2024-25 (153.52 t prior year)
Waste diverted from landfill
100%
Operator-wide 2025 · FY2024-25; e-waste EDE 100%
flagTargets & commitments
Net-zero target
2030
Operator-wide 2025 · new infrastructure by 2030; existing estate by 2040
SBTi
none yet: CDP and SBTi project planned (Q2 2024)
Operator-wide 2025 · company
Climate Neutral DC Pact
yes
Operator-wide 2025 · signatory since early 2021
ISO 14001
ISO 14001:2015 certified
Operator-wide 2025 · company
ISO 50001
ISO 50001:2018 certified
Operator-wide 2025 · company
Backup fuel / HVO
First European operator to use 100% HVO-fuelled generators
Operator-wide 2025 · all sites
Green bonds
No green bond; £356m extendable debt facility from Deutsche Bank (2024)
Operator-wide 2024 · company
business_centerBusiness
Data centers
4 locations (Harlow, Slough, Northolt, Manchester/Stockport under construction) campuses
Operator-wide 2025 · UK
Pipeline capacity
260 MW IT (operational + development + planned)
Operator-wide 2025 · UK portfolio
Countries
1 countries
Operator-wide 2025 · UK
Employees
34 employees
Operator-wide 2025 · FY2024-25 (26 prior year)
Headquarters
United Kingdom
Operator-wide 2025 · Harlow CM17 9NA
campaignNotable
Notable facts
NVIDIA DGX-Ready certified; Harlow KLON-01/02 10 MW each, KLON-03 17.6 MW liquid-cooled; BREEAM Excellent on all new builds; ESG data assured by Saltire Sustainability
Operator-wide 2025 · company
mapFootprint
publicData centers by country
dnsData centers
3 · largest first| Data center | Status | Capacity | Building | PUE | Energy (est) | Networks |
|---|---|---|---|---|---|---|
| Kao Data KLON-01 Harlow, Essex, GB | Operational | 35 MW | 4,101 m² | 1.2 | 219.5 GWh | 2 |
| Kao Data KLON-06 Slough, GB | Operational | 16 MW | 16,489 m² | 1.25 | 105.1 GWh | — |
| Kao Data KLON-05 GB | Operational | — | 7,377 m² | 1.25 | 44.1 GWh | — |
Kao Data KLON-01
35 MW
Kao Data · Harlow, United Kingdom
Kao Data KLON-06
16 MW
Kao Data · Slough, United Kingdom
Kao Data KLON-05
≈ 6.7 MW
Kao Data · United Kingdom