9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries
expand_lessStatus
Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll operators
Data centers
131
Countries
36
Reported MW
158 MW
Pipeline MW
3.85 GW
Building area
343,986 m²
Est. energy / yr
5.66 TWh
Est. CO₂ / yr
1.9 Mt
Median PUE
1.17
ecoSustainability — operator-wide
Hover a value for the quote from the reportboltEnergy
Total energy
37.46 TWh
Operator-wide 2025 · company-wide, FY25 (Jul 2024-Jun 2025)
Data-center electricity
37.03 TWh
Operator-wide 2025 · company-wide electricity consumption (datacenters are the large majority), FY25
Renewable share
100%
Operator-wide 2025 · company-wide electricity, annual matching
Renewable procurement
PPAs/renewable agreements totalling up to 40 GW (up from 34 GW); shift from RECs toward new carbon-free electricity; Sweden region on 24/7-matched CFE via Vattenfall
Operator-wide 2025 · company-wide
PPAs contracted
40,000 MW (up to)
Operator-wide 2025 · company-wide contracted renewable portfolio
Average PUE
1.17
Operator-wide 2025 · global owned datacenter fleet, FY25 (FY24: 1.16)
cloudEmissions
Scope 1
170.9 ktCO₂e
Operator-wide 2025 · company-wide FY25
Scope 2 location-based
12.03 MtCO₂e
Operator-wide 2025 · company-wide FY25
Scope 2 market-based
2.71 MtCO₂e
Operator-wide 2025 · company-wide FY25
Scope 3
18.24 MtCO₂e
Operator-wide 2025 · company-wide FY25
water_dropWater
Water withdrawal
13.27 M m³
Operator-wide 2025 · company-wide, FY25 (13,266 megaliters)
Water consumption
8.17 M m³
Operator-wide 2025 · company-wide, FY25 (8,170 megaliters)
WUE
0.27 L/kWh
Operator-wide 2025 · global owned datacenter fleet, FY25 (FY24: 0.30)
Water target
Water positive by 2030; 14,278 million liters replenished in 2025
Operator-wide 2025 · company-wide
Sites in water-stressed areas
50 % of withdrawal
Operator-wide 2025 · company-wide withdrawal in water-stressed areas (6,659 ML)
recyclingWaste
Waste generated
58.9 kt
Operator-wide 2025 · company-wide FY25
Waste diverted from landfill
61.4 % (36,149 t diverted of 58,868 t; computed ratio of reported figures)
Operator-wide 2025 · company-wide FY25
Zero-waste sites
Zero waste by 2030 target; 90.9% reuse/recycling of end-of-life cloud assets in 2024; 92% decommissioned server reuse rate in 2025; Circular Centers (e.g., Amsterdam)
Operator-wide 2025 · datacenter hardware
flagTargets & commitments
Carbon-neutral target
2,030 year (carbon negative)
Operator-wide 2025 · company-wide: carbon negative, water positive and zero waste by 2030
Renewable target
100% renewable energy coverage globally by 2025 (reported as achieved in 2025)
Operator-wide 2025 · company-wide
Climate Neutral DC Pact
yes
Operator-wide 2025 · EU
Heat-reuse projects
Denmark (greater Copenhagen) surplus heat to municipal district heating
Operator-wide 2025 · Denmark region
Backup fuel / HVO
Renewable biofuel/HVO in backup generators in Sweden (Preem Evolution Diesel Plus, transition to 100% renewable biofuel), Ireland, Netherlands, Denmark
Operator-wide 2025 · European datacenter regions
business_centerBusiness
Data centers
400 datacenters (more than)
Operator-wide 2025 · global, in 70 regions
Employees
228,000 FTE
Operator-wide 2025 · company-wide as of June 30, 2025
Revenue
281.7 USD billion
Operator-wide 2025 · company-wide FY25; Azure surpassed $75bn
campaignNotable
Controversies
Total emissions up 25% YoY in 2025 to ~20 MtCO2e (vs ~13 Mt in 2020 baseline) driven by AI datacenter build-out; scope 2 share jumped from <2% to 13% of footprint
Operator-wide 2025 · company-wide
Notable facts
Publishes fleet and regional PUE/WUE and per-country datacenter fact sheets; WUE cut 25% vs 2022 baseline; next-gen designs use zero water for cooling; 29 carbon removal projects added in 2025 (>45 Mt over three decades)
Operator-wide 2025 · company-wide
location_cityFigures the operator discloses per data center
| Data center | Metric | Value | Year |
|---|---|---|---|
| Microsoft Americas region (owned datacenters) | Average PUE | 1.16 | 2025 |
| Microsoft Americas region (owned datacenters) | WUE | 0.34 | 2025 |
| Microsoft Asia Pacific region (owned datacenters) | Average PUE | 1.28 | 2025 |
| Microsoft Asia Pacific region (owned datacenters) | WUE | 0.25 | 2025 |
| Microsoft EMEA region (owned datacenters) | Average PUE | 1.16 | 2025 |
| Microsoft EMEA region (owned datacenters) | WUE | 0.03 | 2025 |
| Microsoft Sweden (Gävle, Sandviken, Staffanstorp) | Carbon-free energy (hourly) | 100 | 2025 |
| Microsoft Sweden (Gävle, Sandviken, Staffanstorp) | Backup fuel / HVO | Preem Evolution Diesel Plus (>=50% renewable), moving to 100% renewable biofuel | 2025 |
| Microsoft Sweden (Gävle, Sandviken, Staffanstorp) | cooling | outside air only; harvested rainwater for humidification | 2025 |
| Microsoft Ireland (Grange Castle, Dublin) | cooling | direct evaporative cooling uses water <5% of year; rainwater harvesting | 2025 |
| Microsoft Ireland (Grange Castle, Dublin) | Renewable procurement | PPAs with Digital Power, Energia, Octopus, Power Capital, Ronaver Energy, SSE Renewables, Statkraft; biofuel + natural gas backup generation | 2025 |
| Microsoft Netherlands (Middenmeer, Hollands Kroon) | Renewable procurement | PPAs with Eneco, Shell, Vattenfall; renewable biofuel backup; rainwater capture; LEED Gold | 2025 |
| Microsoft Denmark (greater Copenhagen) | Heat-reuse projects | surplus heat to municipal district heating; solar PPA Svinningegården; direct air cooling uses no water | 2025 |
mapFootprint
publicData centers by country
dnsData centers
131 · largest first| Data center | Status | Capacity | Building | PUE | Energy (est) | Networks |
|---|---|---|---|---|---|---|
| Microsoft Pecos Data Center Campus Pecos, TX, US | Planned / permitted | 2 GW | — | 1.17 | — | — |
| Microsoft Fairwater Atlanta (Azure AI Superfactory) Fayetteville, GA, US | Operational | 1.5 GW | — | 1.17 | 114.6 GWh | — |
| Microsoft Granger Data Center Granger, IN, US | Under construction | 1 GW | — | 1.17 | — | — |
| Microsoft Mount Pleasant Data Center Campus Mount Pleasant, WI, US | Operational | 1 GW | — | 1.17 | 114.6 GWh | — |
| Microsoft Union City Data Center Campus Union City, GA, US | Under construction | 324 MW | — | 1.17 | — | — |
| Microsoft Malaga Campus Malaga, WA, US | Under construction | 288 MW | — | 1.17 | — | — |
| Microsoft EAT02 East Wenatchee, WA, US | Operational | 180 MW | — | 1.17 | 114.6 GWh | — |
| Microsoft Chicago Data Center (Northlake) Northlake, IL, US | Operational | 158 MW | — | 1.17 | 971.6 GWh | — |
| Microsoft San Jose Data Center Campus (SJ04) San Jose, CA, US | Planned / permitted | 98 MW | — | 1.17 | — | — |
| Microsoft Tyrone Campus (Project Rita) Tyrone, GA, US | Planned / permitted | 96 MW | — | 1.17 | — | — |
| Microsoft Alviso Data Center Campus San Jose (Alviso), CA, US | Under construction | 48 MW | — | 1.17 | — | — |
| Microsoft DUB03 / DUB04 Dublin, IE | Operational | — | 27,357 m² | 1.17 | 151.8 GWh | — |
| Microsoft · Gavle Gavle, SE | Operational | — | 23,310 m² | 1.17 | 129.3 GWh | — |
| Microsoft San Antonio Westover Hills Campus San Antonio, US | Operational | — | 22,908 m² | 1.17 | 127.1 GWh | — |
| Microsoft · Gavle Gavle, SE | Operational | — | 22,786 m² | 1.17 | 126.4 GWh | — |
| Microsoft SAT 80 Castroville, US | Operational | — | 22,690 m² | 1.17 | 125.9 GWh | — |
| Microsoft · Sandviken Sandviken, SE | Operational | — | 22,638 m² | 1.17 | 125.6 GWh | — |
| Microsoft Texas Research Park Campus San Antonio, US | Operational | — | 21,290 m² | 1.17 | 118.1 GWh | — |
| CPH07 Hoje-Taastrup, DK | Operational | — | 20,480 m² | 1.17 | 113.6 GWh | — |
| Microsoft SYD05 Data Centre Sydney, AU | Operational | — | 17,191 m² | 1.17 | 105.2 GWh | — |
| Microsoft JKT02 Jakarta, ID | Operational | — | 15,339 m² | 1.17 | 93.9 GWh | — |
| Microsoft MEL07 AU | Operational | — | 15,115 m² | 1.17 | 92.5 GWh | — |
| Microsoft MEL11 AU | Operational | — | 15,043 m² | 1.17 | 92.1 GWh | — |
| Microsoft Data Center Campus Middenmeer Middenmeer, NL | Operational | — | 13,025 m² | 1.17 | 72.3 GWh | — |
| Microsoft JKT05 ID | Operational | — | 11,708 m² | 1.17 | 71.7 GWh | — |
| CPH01 DK | Operational | — | 10,907 m² | 1.17 | 60.5 GWh | — |
| Microsoft JKT09 ID | Operational | — | 10,876 m² | 1.17 | 66.6 GWh | — |
| Microsoft MAD01 Madrid, ES | Operational | — | 10,212 m² | 1.17 | 56.7 GWh | — |
| Microsoft Data Centre · Auckland Auckland, NZ | Operational | — | 6,301 m² | 1.17 | 154.3 GWh | — |
| Microsoft Data Centre NZ | Operational | — | 6,178 m² | 1.17 | 151.3 GWh | — |
| Microsoft MEL04 AU | Operational | — | 6,056 m² | 1.17 | 37.1 GWh | — |
| Microsoft · Milan Milan, IT | Operational | — | 5,907 m² | 1.17 | 32.8 GWh | — |
| COLO 2 CL | Planned / permitted | — | 4,999 m² | 1.17 | — | — |
| Microsoft MAD02 ES | Operational | — | 4,396 m² | 1.17 | 24.4 GWh | — |
| Microsoft Newport data centre Newport, GB | Operational | — | 3,969 m² | 1.17 | 22 GWh | — |
| Microsoft · Schwechat Schwechat, AT | Operational | — | 3,305 m² | 1.17 | 18.3 GWh | — |
| Azure UAE North Dubai, AE | Operational | — | — | 1.17 | — | — |
| Microsoft Data Center FR | Operational | — | — | 1.17 | 114.6 GWh | — |
| Azure Brazil South Sao Paulo, BR | Operational | — | — | 1.17 | — | — |
| Azure Canada Central Toronto, CA | Operational | — | — | 1.17 | — | — |
| Azure Switzerland North Zurich, CH | Operational | — | — | 1.17 | — | — |
| Microsoft CH | Operational | — | — | 1.17 | 114.6 GWh | — |
| Azure Germany West Central Frankfurt, DE | Operational | — | — | 1.17 | — | — |
| Azure France Central Paris, FR | Operational | — | — | 1.17 | — | — |
| Azure UK South London, GB | Operational | — | — | 1.17 | — | — |
| Azure East Asia Hong Kong, HK | Operational | — | — | 1.17 | — | — |
| Azure Israel Central Tel Aviv, IL | Operational | — | — | 1.17 | — | — |
| Azure Central India Pune, IN | Operational | — | — | 1.17 | — | — |
| Azure Japan East Tokyo, JP | Operational | — | — | 1.17 | — | — |
| Azure Korea Central Seoul, KR | Operational | — | — | 1.17 | — | — |
| Azure Mexico Central Queretaro, MX | Operational | — | — | 1.17 | — | — |
| Azure Malaysia West Kuala Lumpur, MY | Operational | — | — | 1.17 | — | — |
| Azure West Europe Amsterdam, NL | Operational | — | — | 1.17 | — | — |
| Azure Norway East Oslo, NO | Operational | — | — | 1.17 | — | — |
| Azure Poland Central Warsaw, PL | Operational | — | — | 1.17 | — | — |
| Azure Qatar Central Doha, QA | Operational | — | — | 1.17 | — | — |
| Azure Southeast Asia Singapore, SG | Operational | — | — | 1.17 | — | — |
| Microsoft Cheyenne Campus (CYS) Cheyenne, US | Operational | — | — | 1.17 | 114.6 GWh | — |
| Microsoft · Santa Clara Santa Clara, US | Operational | — | — | 1.17 | 114.6 GWh | — |
| Microsoft Columbia Data Center (Quincy) Quincy, WA, US | Operational | — | — | 1.17 | 114.6 GWh | — |
| Microsoft Project Mountain Data Center West Des Moines, IA, US | Operational | — | — | 1.17 | 114.6 GWh | — |
| Microsoft · Leesburg Leesburg, US | Operational | — | — | 1.17 | 114.6 GWh | — |
| Microsoft US | Operational | — | — | 1.17 | 114.6 GWh | — |
| Microsoft CHI11 Elk Grove Village, US | Operational | — | — | 1.17 | 114.6 GWh | — |
| Microsoft Data Center US | Operational | — | — | 1.17 | 114.6 GWh | — |
| Microsoft Data Center 2 · Gainesville Gainesville, US | Operational | — | — | 1.17 | 114.6 GWh | — |
| PHX-10 Goodyear, US | Operational | — | — | 1.17 | 114.6 GWh | — |
| Azure South Africa North Johannesburg, ZA | Operational | — | — | 1.17 | — | — |
| Microsoft Project Alluvion Data Center West Des Moines, IA, US | Operational | — | — | 1.17 | 114.6 GWh | — |
| Microsoft Becker Data Center Becker, MN, US | Planned / permitted | — | — | 1.17 | — | — |
| Microsoft Boydton Campus (BN / Azure East US) Boydton, VA, US | Operational | — | — | 1.17 | 114.6 GWh | — |
| Microsoft Bristow Data Center Campus (MNZ03) Bristow, VA, US | Operational | — | — | 1.17 | 114.6 GWh | — |
| Microsoft Cheyenne Mega-Campus Expansion Cheyenne, WY, US | Planned / permitted | — | — | 1.17 | — | — |
| Microsoft Conover Data Center Conover, NC, US | Under construction | — | — | 1.17 | — | — |
| Microsoft Dorr Township Data Center Dorr Township, MI, US | Planned / permitted | — | — | 1.17 | — | — |
| Microsoft Douglasville Data Center Campus Douglasville, GA, US | Under construction | — | — | 1.17 | — | — |
| Microsoft East Point Data Center (Ben Hill Road) East Point, GA, US | Under construction | — | — | 1.17 | — | — |
| Microsoft El Mirage Data Center Campus El Mirage, AZ, US | Operational | — | — | 1.17 | 114.6 GWh | — |
| Microsoft Elk Grove Data Center Elk Grove Village, IL, US | Under construction | — | — | 1.17 | — | — |
| Microsoft Victory Logistics District Campus Fernley, NV, US | Planned / permitted | — | — | 1.17 | — | — |
| Microsoft Data Center Campus – Rome, GA Rome, GA, US | Planned / permitted | — | — | 1.17 | — | — |
| Microsoft Gaines Township Data Center Gaines Township, MI, US | Planned / permitted | — | — | 1.17 | — | — |
| Microsoft Project Ginger East Data Center West Des Moines, IA, US | Under construction | — | — | 1.17 | — | — |
| Microsoft Project Ginger West Data Center West Des Moines, IA, US | Under construction | — | — | 1.17 | — | — |
| Microsoft Goodyear Data Center Campus Goodyear, AZ, US | Operational | — | — | 1.17 | 114.6 GWh | — |
| Microsoft Heath Data Center Heath, OH, US | Under construction | — | — | 1.17 | — | — |
| Microsoft Hebron Data Center Hebron, OH, US | Under construction | — | — | 1.17 | — | — |
| Microsoft Hickory Data Center Hickory, NC, US | Under construction | — | — | 1.17 | — | — |
| Microsoft Hoffman Estates Data Center Hoffman Estates, IL, US | Operational | — | — | 1.17 | 114.6 GWh | — |
| Microsoft Irving Data Centers Irving, TX, US | Planned / permitted | — | — | 1.17 | — | — |
| Microsoft Kenosha Data Center Campus Kenosha, WI, US | Planned / permitted | — | — | 1.17 | — | — |
| Microsoft La Porte Data Center La Porte, IN, US | Under construction | — | — | 1.17 | — | — |
| Microsoft Lowell Township Data Center Lowell Township, MI, US | Planned / permitted | — | — | 1.17 | — | — |
| Microsoft Maiden Data Center Maiden, NC, US | Under construction | — | — | 1.17 | — | — |
| Microsoft Project Osmium Data Center West Des Moines, IA, US | Operational | — | — | 1.17 | 114.6 GWh | — |
| Microsoft Palmetto Data Center Palmetto, GA, US | Under construction | — | — | 1.17 | — | — |
| Microsoft Panhandle Road Campus (AVC17 expansion) Boydton, VA, US | Planned / permitted | — | — | 1.17 | — | — |
| Microsoft Person County Mega Park Roxboro, NC, US | Planned / permitted | — | — | 1.17 | — | — |
| Microsoft Project Ruthenium Data Center West Des Moines, IA, US | Planned / permitted | — | — | 1.17 | — | — |
| Microsoft San Antonio SAT89/SAT90 Data Centers Castroville, TX, US | Under construction | — | — | 1.17 | — | — |
| Microsoft Silver Springs Data Center Campus Silver Springs, NV, US | Planned / permitted | — | — | 1.17 | — | — |
| Microsoft Skipwith Road Campus (LYH03) Boydton, VA, US | Planned / permitted | — | — | 1.17 | — | — |
| Microsoft Tunstall Road Campus (Hillcrest / AVC09) South Hill, VA, US | Planned / permitted | — | — | 1.17 | — | — |
| Microsoft Van Meter Data Center (Vision Park) Van Meter, IA, US | Planned / permitted | — | — | 1.17 | — | — |
| Azure Australia Central (Canberra) Canberra, AU | Operational | — | — | 1.17 | — | — |
| Azure Australia Central 2 (Canberra) Canberra, AU | Operational | — | — | 1.17 | — | — |
| Azure Belgium Central (Brussels) Brussels, BE | Operational | — | — | 1.17 | — | — |
| Azure Brazil Southeast (Rio de Janeiro) Rio de Janeiro, BR | Operational | — | — | 1.17 | — | — |
| Azure Canada East (Quebec City) Quebec City, QC, CA | Operational | — | — | 1.17 | — | — |
| Azure Chile Central (Santiago) Santiago, CL | Operational | — | — | 1.17 | — | — |
| Azure France South (Marseille) Marseille, FR | Operational | — | — | 1.17 | — | — |
| Azure Germany North (Berlin) Berlin, DE | Operational | — | — | 1.17 | — | — |
| Azure India South Central (Hyderabad) Hyderabad, IN | Operational | — | — | 1.17 | — | — |
| Azure Japan West (Osaka) Osaka, JP | Operational | — | — | 1.17 | — | — |
| Azure Korea South (Busan) Busan, KR | Operational | — | — | 1.17 | — | — |
| Azure Norway West (Stavanger) Stavanger, NO | Operational | — | — | 1.17 | — | — |
| Azure South Africa West (Cape Town) Cape Town, ZA | Operational | — | — | 1.17 | — | — |
| Azure South India (Chennai) Chennai, IN | Operational | — | — | 1.17 | — | — |
| Azure Sweden South (Staffanstorp) Staffanstorp, SE | Operational | — | — | 1.17 | — | — |
| Azure Switzerland West (Geneva) Geneva, CH | Operational | — | — | 1.17 | — | — |
| Azure UAE Central (Abu Dhabi) Abu Dhabi, AE | Operational | — | — | 1.17 | — | — |
| Azure West India (Mumbai) Mumbai, IN | Operational | — | — | 1.17 | — | — |
| Azure Saudi Arabia East SA | Under construction | — | — | 1.17 | — | — |
| Azure Finland Central (announced) Espoo, FI | Planned / permitted | — | — | 1.17 | — | — |
| Azure Greece Central (announced) Athens, GR | Planned / permitted | — | — | 1.17 | — | — |
| Azure Taiwan North (announced) Taipei, TW | Planned / permitted | — | — | 1.17 | — | — |
| Microsoft Castroville FM 471 North campus Castroville, TX, US | Planned / permitted | — | — | 1.17 | — | — |
| Microsoft Medina County CR 381 campus (SAT93/SAT94) Castroville, TX, US | Planned / permitted | — | — | 1.17 | — | — |
| Microsoft Cheyenne Business Parkway campus Cheyenne, WY, US | Operational | — | — | 1.17 | — | — |
| Microsoft Bison Business Park campus Cheyenne, WY, US | Operational | — | — | 1.17 | — | — |
| Microsoft HR Ranch Road datacenter Cheyenne, WY, US | Under construction | — | — | 1.17 | — | — |
Microsoft · Pecos, United States
Microsoft · Fayetteville, United States
Microsoft · Granger, United States
Microsoft · Mount Pleasant, United States
Microsoft · Union City, United States
Microsoft Malaga Campus
288 MW
Microsoft · Malaga, United States
Microsoft EAT02
180 MW
Microsoft · East Wenatchee, United States
Microsoft · Northlake, United States
Microsoft · San Jose, United States
Microsoft · Tyrone, United States
Microsoft · San Jose (Alviso), United States
Microsoft DUB03 / DUB04
≈ 25 MW
Microsoft · Dublin, Ireland
Microsoft · Gavle
≈ 21 MW
Microsoft · Gavle, Sweden
Microsoft · San Antonio, United States
Microsoft · Gavle
≈ 21 MW
Microsoft · Gavle, Sweden
Microsoft SAT 80
≈ 21 MW
Microsoft · Castroville, United States
Microsoft · Sandviken
≈ 21 MW
Microsoft · Sandviken, Sweden
Microsoft · San Antonio, United States
CPH07
≈ 19 MW
Microsoft · Hoje-Taastrup, Denmark
Microsoft SYD05 Data Centre
≈ 16 MW
Microsoft · Sydney, Australia
Microsoft JKT02
≈ 14 MW
Microsoft · Jakarta, Indonesia
Microsoft MEL07
≈ 14 MW
Microsoft · Australia
Microsoft MEL11
≈ 14 MW
Microsoft · Australia
Microsoft · Middenmeer, Netherlands
Microsoft JKT05
≈ 11 MW
Microsoft · Indonesia
CPH01
≈ 9.9 MW
Microsoft · Denmark
Microsoft JKT09
≈ 9.9 MW
Microsoft · Indonesia
Microsoft MAD01
≈ 9.3 MW
Microsoft · Madrid, Spain
Microsoft · Auckland, New Zealand
Microsoft Data Centre
≈ 22 MW
Microsoft · New Zealand
Microsoft MEL04
≈ 5.5 MW
Microsoft · Australia
Microsoft · Milan
≈ 5.4 MW
Microsoft · Milan, Italy
COLO 2
≈ 4.5 MW
Microsoft · Chile
Microsoft MAD02
≈ 4 MW
Microsoft · Spain
Microsoft Newport data centre
≈ 3.6 MW
Microsoft · Newport, United Kingdom
Microsoft · Schwechat
≈ 3 MW
Microsoft · Schwechat, Austria
Microsoft · Dubai, UAE
Microsoft · France
Microsoft · Sao Paulo, Brazil
Microsoft · Toronto, Canada
Microsoft · Zurich, Switzerland
Microsoft · Switzerland
Microsoft · Frankfurt, Germany
Microsoft · Paris, France
Microsoft · London, United Kingdom
Microsoft · Hong Kong, Hong Kong
Microsoft · Tel Aviv, Israel
Microsoft · Pune, India
Microsoft · Tokyo, Japan
Microsoft · Seoul, South Korea
Microsoft · Queretaro, Mexico
Microsoft · Kuala Lumpur, Malaysia
Microsoft · Amsterdam, Netherlands
Microsoft · Oslo, Norway
Microsoft · Warsaw, Poland
Microsoft · Doha, Qatar
Microsoft · Singapore, Singapore
Microsoft · Cheyenne, United States
Microsoft · Santa Clara, United States
Microsoft · Quincy, United States