9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries

expand_lessStatus

Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll operators
corporate_fare

Princeton Digital Group data centers

Warburg Pincus-founded platform · private (Warburg Pincus, Ontario Teachers' Pension Plan, Mubadala, Stonepeak)
Data centers
24
Countries
7
Reported MW
43 MW
Pipeline MW
1.15 GW
Building area
34,235 m²
Est. energy / yr
395.1 GWh
Est. CO₂ / yr
230.7 kt
Median PUE
1.81

ecoSustainability — operator-wide

Hover a value for the quote from the report
boltEnergy
Renewable share
100%
Operator-wide 2025 · Scope 2 electricity matched with carbon-free energy on annual basis (PPAs + EACs)
Renewable procurement
PPAs (~65MW long and short term), Energy Attribute Certificates, on-site rooftop solar (SH1 Shanghai 3.48MWp; Indonesia ~205kWp; JH1 Johor ~700kWp planned 2026), time-matched CFE at Mumbai (2025)
Operator-wide 2025 · company
PPAs contracted
65 MW (approx.)
Operator-wide 2026 · long and short-term PPAs, early 2026
Carbon-free energy (hourly)
100% annual matching, 'large portion quarterly matched' (hourly % not stated)
Operator-wide 2025 · company
Best PUE
1.18 ratio ('below')
Operator-wide 2025 · Langfang LF1, China (SH1 Shanghai below 1.20; JH1 Johor <1.34)
Design PUE, new builds
1.2-1.4 ratio range
Operator-wide 2025 · all new greenfield projects
cloudEmissions
Scope 1
2.8 ktCO₂e
Operator-wide 2025 · company (100% offset)
Scope 2 location-based
409.8 ktCO₂e
Operator-wide 2025 · company
Scope 2 market-based
0 tCO₂e
Operator-wide 2025 · company (via PPAs/EACs)
Scope 3
488.8 ktCO₂e
Operator-wide 2025 · Cat 1 7,006; Cat 2 219,730; Cat 6 951; Cat 7 725; Cat 13 downstream leased 260,363
water_dropWater
Water target
Reduce portfolio WUE by 50% or more by 2030; LF1 wastewater recycling expected to save ~100,000 m3/yr; rainwater harvesting Mumbai and Tokyo
Operator-wide 2025 · company
recyclingWaste
Waste diverted from landfill
52%
Operator-wide 2025 · company
E-waste
~100% of e-waste recycled (tonnage not stated)
Operator-wide 2025 · company
flagTargets & commitments
Net-zero target
2030
Operator-wide 2025 · Scope 1 and 2
RE100 member
yes
Operator-wide 2025 · joined 2025 (also 24/7 Carbon-Free Energy coalition, UN Global Compact)
ISO 50001
ISO 50001 at MU1 Mumbai; ISO 45001 at 100% of stabilized sites
Operator-wide 2025 · sites
Backup fuel / HVO
Strategic partnership with Pertamina Patra Niaga to roll out HVO replacing diesel in Indonesia
Operator-wide 2025 · Indonesia
Green bonds
US$1.78bn green and sustainability-linked loans secured
Operator-wide 2025 · cumulative
business_centerBusiness
Data centers
11 count
Operator-wide 2025 · primary facilities (as extracted from report)
Operational capacity
660 MW (approx., '660MW+')
Operator-wide 2025 · operational (as extracted)
Pipeline capacity
1.8 GW
Operator-wide 2026 · total portfolio capacity incl. development ('1.8 GW')
Countries
7 count
Operator-wide 2026 · Singapore, Japan, India, Indonesia, China, Malaysia, South Korea (site says 'eight markets')
Employees
473 count
Operator-wide 2025 · headcount (+30% in 2025)
Headquarters
Singapore
Operator-wide 2025 · company
campaignNotable
Notable facts
First operator in Asia with OCP Ready v2 hyperscale certification; TY1 Tokyo first in Japan NVIDIA DGX-Ready for liquid cooling; first TNFD nature report (2026); EcoVadis Silver; Deloitte limited assurance on Scope 1, 2 and Scope 3 Cat 6/7/13; US$1.3bn from Stonepeak and US$2.5bn capital raised in 2025
Operator-wide 2025 · company

mapFootprint

publicData centers by country

dnsData centers

24 · largest first
Data centerStatusCapacityBuildingPUEEnergy (est)Networks
PDG JH2 Johor
Johor, Johor, MY
Planned / permitted300 MW————
PDG JC4 Jakarta
Bekasi, West Java, ID
Planned / permitted240 MW————
PDG JH1 Johor
Kulai (Sedenak Tech Park), Johor, MY
Operational200 MW————
MU1
Mumbai, Maharashtra, IN
Operational150 MW——14 GWh1
Princeton Digital JC3
Bekasi, West Java, ID
Under construction120 MW11,904 m²———
PDG MU2 Mumbai
Navi Mumbai, Maharashtra, IN
Planned / permitted120 MW————
PDG LF1 Langfang
Langfang, Hebei, CN
Operational103 MW————
PDG TY1 Tokyo
Saitama, Saitama, JP
Under construction96 MW————
PDG HY1 Hyderabad
Hyderabad, Telangana, IN
Under construction90 MW————
PDG CH1 Chennai
Chennai, Tamil Nadu, IN
Planned / permitted72 MW————
PDG NT1 Nantong
Nantong, Jiangsu, CN
Planned / permitted64 MW————
PDG SE1 Seoul
Incheon, Incheon, KR
Planned / permitted48 MW————
NJ1
Nanjing, CN
Operational43 MW16,734 m²1.3293.8 GWh1
SB1
Surabaya, ID
Operational—2,059 m²1.8117.8 GWh10
BD1
Bandung, ID
Operational—1,701 m²1.9215.6 GWh2
JB1
Bintaro, ID
Operational—1,349 m²—36.6 GWh11
JC2
Jakarta, Cibitung, ID
Operational—338 m²—2.3 GWh2
JC1
Jakarta, Cibitung, ID
Operational—150 m²—1 GWh19
SH1
Shanghai, CN
Operational———14 GWh1
PDG LF2 Langfang
Langfang, Hebei, CN
Planned / permitted—————
PDG Pekanbaru
Pekanbaru, Riau, ID
Operational—————
PDG SG1 Singapore
Singapore, SG
Operational—————
PDG SG2 Singapore
Singapore, SG
Operational—————
PDG SG3 Singapore
Singapore, SG
Operational—————
Princeton Digital Group · Johor, Malaysia
Planned / permitted · Colocation
Princeton Digital Group · Bekasi, Indonesia
Planned / permitted · Colocation
Princeton Digital Group · Kulai (Sedenak Tech Park), Malaysia
Operational · Colocation
MU1
150 MW
Princeton Digital Group · Mumbai, India
Operational · Colocation · 1 networks
Princeton Digital Group · Bekasi, Indonesia
Under construction · Colocation · 11,904 m²
Princeton Digital Group · Navi Mumbai, India
Planned / permitted · Colocation
Princeton Digital Group · Langfang, China
Operational · Colocation
Princeton Digital Group · Saitama, Japan
Under construction · Colocation
Princeton Digital Group · Hyderabad, India
Under construction · Colocation
Princeton Digital Group · Chennai, India
Planned / permitted · Colocation
Princeton Digital Group · Nantong, China
Planned / permitted · Colocation
Princeton Digital Group · Incheon, South Korea
Planned / permitted · Colocation
NJ1
43 MW
Princeton Digital Group · Nanjing, China
Operational · Colocation · 16,734 m² · 1 networks
SB1
≈ 1.9 MW
Princeton Digital Group · Surabaya, Indonesia
Operational · Colocation · 2,059 m² · 10 networks
BD1
≈ 1.6 MW
Princeton Digital Group · Bandung, Indonesia
Operational · Colocation · 1,701 m² · 2 networks
JB1
≈ 4.9 MW
Princeton Digital Group · Bintaro, Indonesia
Operational · Colocation · 1,349 m² · 11 networks
JC2
≈ 0.3 MW
Princeton Digital Group · Jakarta, Cibitung, Indonesia
Operational · Colocation · 338 m² · 2 networks
JC1
≈ 0.1 MW
Princeton Digital Group · Jakarta, Cibitung, Indonesia
Operational · Colocation · 150 m² · 19 networks
Princeton Digital Group · Shanghai, China
Operational · Colocation · 1 networks
Princeton Digital Group · Langfang, China
Planned / permitted · Colocation
Princeton Digital Group · Pekanbaru, Indonesia
Operational · Colocation
Princeton Digital Group · Singapore, Singapore
Operational · Colocation
Princeton Digital Group · Singapore, Singapore
Operational · Colocation
Princeton Digital Group · Singapore, Singapore
Operational · Colocation