corporate_fare

Yondr data centers

DigitalBridge and La Caisse (CDPQ) — acquisition completed 1 July 2025 · private (DigitalBridge / La Caisse)
Data centers
3
Countries
3
Reported MW
0 MW
Pipeline MW
72 MW
Building area
26,520 m²
Est. energy / yr
180.1 GWh
Est. CO₂ / yr
51.8 kt
Median PUE
—

ecoSustainability — operator-wide

Hover a value for the quote from the report
business_centerBusiness
Data centers
16 data centers (directory listing; datacentermap lists 9)
Operator-wide 2025 · Americas, Europe, Asia
Countries
8 countries (derived from listed locations)
Operator-wide 2025 · USA, Canada, UK, Germany, Netherlands, Malaysia, Indonesia, Japan
Headquarters
Netherlands (Amsterdam) per directory
Operator-wide 2025 · group
campaignNotable
Notable facts
Founded 2019; hyperscale build-to-suit developer; acquired by DigitalBridge and La Caisse (closed July 2025); exited India JV EverYondr (sold to Everstone, July 2025); Slough (London) campus phase 1 completed 2024 (3-building plan); Frankfurt completed 2025; Toronto due mid-2026; 762% power growth since 2022 (baxtel)
Operator-wide 2025 · group

mapFootprint

publicData centers by country

dnsData centers

3 · largest first
Data centerStatusCapacityBuildingPUEEnergy (est)Networks
Yondr Manassas Data Center Campus
Manassas, VA, US
Planned / permitted72 MW————
Yondr - Rechenzentrum
Bischofsheim, DE
Operational40 MW15,768 m²—107.1 GWh—
Yondr data center (United Kingdom)
GB
Operational—10,752 m²—73 GWh—
Yondr · Manassas, United States
Planned / permitted · Colocation
Yondr · Bischofsheim, Germany
Operational · Colocation · 15,768 m² · opened 2024
Yondr · United Kingdom
Operational · Colocation · 10,752 m² · opened 2024