9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries

expand_lessStatus

Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll operators
corporate_fare

Yotta data centers

Hiranandani Group (co-founder and chairman Darshan Hiranandani is Hiranandani Group CEO) · private (Hiranandani Group-promoted)
Data centers
5
Countries
3
Reported MW
0 MW
Pipeline MW
0 MW
Building area
5,519 m²
Est. energy / yr
52.1 GWh
Est. CO₂ / yr
36.3 kt
Median PUE
1.5

ecoSustainability — operator-wide

Hover a value for the quote from the report
boltEnergy
Best PUE
1.5 ratio ('< 1.5')
Operator-wide Yotta NM1 Navi Mumbai
Design PUE, new builds
1.6 ratio (approx.)
Operator-wide Yotta G1 GIFT City (design)
flagTargets & commitments
ISO 14001
No ISO 14001 stated; NM1 is IGBC Platinum-rated green building
Operator-wide NM1
business_centerBusiness
Data centers
5 count
Operator-wide 2026 · NM1 (Navi Mumbai), D1 (Greater Noida), G1 (GIFT City), TB1 and TB2 (Navi Mumbai)
Operational capacity
85 MW IT
Operator-wide 2026 · sum of stated IT load: NM1 52 + D1 30 + G1 1 + TB1 1 + TB2 1
Pipeline capacity
1 GW
Operator-wide 2026 · NM1 Navi Mumbai DC park scalable to 1 GW (D1 campus expandable to 50 MW)
Countries
1 count
Operator-wide 2026 · India
Headquarters
India (Powai, Mumbai)
Operator-wide 2026 · company
campaignNotable
Notable facts
NM1 billed as Asia's largest Tier IV Gold Uptime-certified data center (820,000 sq ft, 16 floors, 7,000+ racks); Shakti Cloud AI GPU cloud on NVIDIA H100/L40S
Operator-wide 2026 · company

mapFootprint

publicData centers by country

dnsData centers

5 · largest first
Data centerStatusCapacityBuildingPUEEnergy (est)Networks
Yotta Datacenter
IN
Operational1 GW5,427 m²1.538.9 GWh—
Yotta Network LLC · Getazat
Getazat, Ararat, AM
Operational—92 m²—625 MWh0
YOTTA NM1
Panvel, Raigad,, IN
Operational———6.3 GWh21
YOTTA D1
Greater Noida, Uttar Pradesh, IN
Operational———6.3 GWh14
Eco-Yotta Data Center (proposed, County Route 9)
Oneonta, NY, US
Planned / permitted—————
Yotta · India
Operational · Colocation · 5,427 m² · PUE 1.5
Yotta · Getazat, Armenia
Operational · Colocation · 92 m²
Yotta · Panvel, Raigad,, India
Operational · Colocation · 21 networks
Yotta · Greater Noida, India
Operational · Colocation · 14 networks
Yotta · Oneonta, United States
Planned / permitted · Colocation