Data centers of the world — interactive map and analytics
dnsLargest data centers
12 in the selection · full list| Data center | Status | Capacity | Building | PUE | Energy (est) | Networks |
|---|---|---|---|---|---|---|
| TiTAN (Serverfarm Moses Lake) Moses Lake, WA, US | Operational | 22 MW | — | — | 164.2 GWh | — |
| Serverfarm CH1 Chicago Chicago, IL, US | Operational | 22 MW | — | — | 160.5 GWh | 5 |
| Serverfarm LAX1 Los Angeles El Segundo, CA, US | Operational | 17 MW | — | — | 129.1 GWh | 3 |
| Serverfarm TOR1 Toronto North York, ON, CA | Operational | — | 7,427 m² | — | 50.4 GWh | 1 |
| Serverfarm LON1 London Feltham, GB | Operational | — | 4,475 m² | — | 30.4 GWh | 1 |
| Serverfarm AMS1 Amsterdam Amsterdam, NL | Operational | — | — | — | 129.1 GWh | 4 |
| Serverfarm ATL1 Atlanta Suwanee, GA, US | Operational | — | — | — | 129.1 GWh | 2 |
| Serverfarm TiTAN Moses Lake Moses Lake, WA, US | Operational | — | — | — | 129.1 GWh | 2 |
| Serverfarm CH2 Oak Brook / Chicago Oak Brook, IL, US | Operational | — | — | — | 129.1 GWh | 1 |
| ServerFarm SC1 Santa Clara, CA, US | Operational | — | — | — | 129.1 GWh | 1 |
| Serverfarm ARK Clarksville Data Center Campus Clarksville, AR, US | Under construction | 432 MW | — | — | — | — |
| Serverfarm Covington Data Center (Hazelbrand Road) Covington, GA, US | Under construction | — | — | — | — | — |
Serverfarm · Moses Lake, United States
Serverfarm · Chicago, United States
Serverfarm · El Segundo, United States
Serverfarm TOR1 Toronto
≈ 6.8 MW
Serverfarm · North York, Canada
Serverfarm LON1 London
≈ 4.1 MW
Serverfarm · Feltham, United Kingdom
Serverfarm · Amsterdam, Netherlands
Serverfarm · Suwanee, United States
Serverfarm · Moses Lake, United States
Serverfarm · Oak Brook, United States
Serverfarm · Santa Clara, United States
Serverfarm · Clarksville, United States
Serverfarm · Covington, United States
publicCountries
all countries12
Data centers
61 MW
Reported · 3 data centers
432 MW
Pipeline MW
1.18 TWh
Est. energy / yr
420.7 kt
Est. CO₂ / yr
4
Countries